WITH SOLUTIONS GRADED A+
◉ How long are operational logs maintained for? Answer: 6 months
◉ what is the record where all speed changes for each individual shaft
are recorded? Answer: bell book
◉ what log is maintained in dc central. Answer: damage control closure
log
◉ What log records day to day events in the engineering plant. Answer:
the engineering log
◉ responsible for physical security of the main reduction gear? Answer:
engineer officer
◉ watch fire and flooding get reported to. Answer: sounding and
security watch
◉ in port watch in charge of physical security of the ship and takes
control of security forces. Answer: CDO
, ◉ What program is used to safeguard the ship from sabotage? Answer:
physical security program
◉ What device is a positive stop used to prevent inadvertent
manipulation? Answer: a locking device
◉ the use of EOSS is. Answer: mandatory
◉ What are the 3 parts of an EOSS? Answer: the EOSS users guide,
EOP, EOCC
◉ What 2 actions of the EOCC that must be memorized. Answer:
controlling and immediate actions
◉ 4 actions EOCC. Answer: controlling, immediate, supplementary,
restore casualty
◉ used to alert personnel to an action that if not strictly adhered to may
result in injury to personnel. Answer: warning
◉ who uses master plant procedures. Answer: EOOW, OOD, SPACE
SUPERVISOR