Final Exam
Started: Mar 9 at 3:24am
Quiz Instructions
See the Module Seven Overview for details.
NOTE: After clicking on Take the Quiz, the timer does not pause for anything, including if the student navigates away from the
assessment. You can resume the assessment by clicking on the title of it in your course and clicking on Resume the Quiz.
IMPORTANT: Canvas will automatically submit any open assessments once the timer runs out or when the assigned due date is
reached, whichever occurs first.
IMPORTANT REMINDER: Each student is expected to work on this individually and within the confines of the Rowan University
Academic Integrity Policy (https://confluence.rowan.edu/display/POLICY/Academic+Integrity+Policy) .
Question 1 1 pts
Which of the following options best represents the phases of design where drawings are being developed?
Design development, construction documents, construction administration
Schematic design, design development, construction documents
Programming, schematic design, design development, construction documents
Programming, design development, construction documents
Question 2 1 pts
When does pre-construction take place?
During the bidding process
Prior to the design phase
After the design is complete
Before design is complete and construction begins
Question 3 1 pts
The name for large wood in construction is:
Beams
Plywood
Bars
Question 4 1 pts
According to the text, ____________ is similar to the GMP arrangement in the traditional system, except that the construction manager
is involved in the conception and design of the project, rather than entering after the completion of the contract documents.
Cost Plus
CM at Risk
Design-build
CM Agency
1 of 6 3/8/2025, 11:38 PM
,Quiz: Final Exam https://canvas.rowan.edu/courses/4303442/quizzes/12657049/take
Question 5 1 pts
__________ is used to assess how the organization's existing resources measure up to the current vendor product offerings.
EHR
RPI
RFP
Question 6 1 pts
If a change order is required in the contract documents after signing a contract for construction, the type of document used to
implement that change is called:
A notice to proceed
A change order
A shop drawing
A field order
Question 7 1 pts
Which of the following is a submittal?
Shop drawings
Data (cut-sheets or tear sheets)
All of these
Samples or mockups
Question 8 1 pts
At what phase of a project's life cycle is the ability to influence the project cost highest?
Conceptual planning
Construction documents
Bidding and procurement
Construction
Question 9 1 pts
Which of the following is a potential environmental concern associated with certain construction materials?
Noise pollution
Land degradation
Energy efficiency
Air & water pollution