Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Document preview thumbnail
Voorbeeld 4 van de 31 pagina's
Tentamen (uitwerkingen)

NORTH CAROLINA BUILDING CONTRACTOR EXAM QUESTIONS AND CORRECT ANSWERS (VERIFIED ANSWERS) PLUS RATIONALES 2026 Q&A

Document preview thumbnail
Voorbeeld 4 van de 31 pagina's

NORTH CAROLINA BUILDING CONTRACTOR EXAM QUESTIONS AND CORRECT ANSWERS (VERIFIED ANSWERS) PLUS RATIONALES 2026 Q&A

Voorbeeld van de inhoud

NORTH CAROLINA BUILDING CONTRACTOR
EXAM QUESTIONS AND CORRECT
ANSWERS (VERIFIED ANSWERS) PLUS
RATIONALES 2026 Q&A


1. What is the primary purpose of the North Carolina Building Code?
| | | | | | | | | |




a) To increase property values
| | |



b) To set minimum construction standards
| | | |



c) To promote architectural design
| | |



d) To reduce construction costs
| | |



b) To set minimum construction standards
| | | |



The North Carolina Building Code establishes minimum requirements to
| | | | | | | |



safeguard public health, safety, and general welfare.
| | | | | | |




2. Which of the following requires a licensed general contractor in North
| | | | | | | | | |



Carolina?
|




a) A residential job valued at $15,000
| | | | |



b) A commercial job under $20,000
| | | |



c) A project costing over $30,000
| | | |



d) Any landscaping project
| |



c) A project costing over $30,000
| | | |

,North Carolina law mandates licensure for general contractors when the
| | | | | | | | |



total project value exceeds $30,000.
| | | | |




3. How long is a building permit valid in North Carolina if work is not
| | | | | | | | | | | | |



commenced? |




a) 30 days |



b) 90 days |



c) 6 months |



d) 12 months |



c) 6 months |



Permits become invalid if work does not commence within 6 months after
| | | | | | | | | | |



issuance.
|




4. What is the minimum footing depth for frost protection in North
| | | | | | | | | |



Carolina? |




a) 6 inches |



b) 12 inches |



c) 18 inches |



d) 24 inches |



d) 24 inches |



Footings must be a minimum of 12 inches below undisturbed ground and
| | | | | | | | | | |



12 inches below the frost line, totaling 24 inches in most NC areas.
| | | | | | | | | | | | |




5. Who is responsible for ensuring job site safety under OSHA
| | | | | | | | |



regulations? |




a) Project owner |



b) Architect
c) Contractor/employer
d) Inspector
c) Contractor/employer
|

,OSHA places responsibility on the employer (contractor) to provide a safe
| | | | | | | | | |



working environment.
| |




6. What is the allowable moisture content for wood framing at the time
| | | | | | | | | | |



of installation?
| |




a) 8%
b) 12%
c) 16%
d) 20%
c) 16%
|



Wood framing should not exceed 19% moisture content for dimensional
| | | | | | | | |



lumber; however, 16% is generally the standard to prevent issues.
| | | | | | | | | |




7. Which document details the contractor’s scope of work and
| | | | | | | |



responsibilities?
|




a) Insurance certificate |



b) Change order |



c) Contract
d) Building permit |



c) Contract
|



The contract outlines all obligations, expectations, and deliverables for
| | | | | | | |



both the contractor and client.
| | | | |




8. A load-bearing wall is typically identified in plans by:
| | | | | | | |




a) Color shading |



b) Wall thickness and location
| | |



c) Electrical symbols |



d) Flooring materials |



b) Wall thickness and location
| | | |



Load-bearing walls are often thicker and located strategically to support
| | | | | | | | |



structural loads.
| |

, 9. When is a contractor required to notify the NC Licensing Board for
| | | | | | | | | | |



General Contractors of a change in business address?
| | | | | | | |




a) Within 10 days | |



b) Within 30 days | |



c) Annually
d) Only at license renewal
| | |



b) Within 30 days | |



NCGC regulations require address changes be reported within 30 days to
| | | | | | | | | |



ensure up-to-date records.
| | |




10. Which type of construction is most fire-resistant?
| | | | | |




a) Type I |



b) Type II |



c) Type III |



d) Type V |



a) Type I |



Type I construction is non-combustible, using reinforced concrete and steel,
| | | | | | | | |



offering the highest fire resistance.
| | | | |




11. The term “draw schedule” refers to:
| | | | |




a) A list of materials
| | |



b) A project timeline
| |



c) A payment plan based on completed work
| | | | | |



d) A building inspection checklist
| | |



c) A payment plan based on completed work
| | | | | |



A draw schedule outlines when payments are made to the contractor
| | | | | | | | | |



based on work progress.
| | | |




12. Which insulation type has the highest R-value per inch?
| | | | | | | |

Documentinformatie

Geüpload op
8 januari 2026
Aantal pagina's
31
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden
$19.49

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Lectphilip
4.1
(43)
Verkocht
277
Volgers
6
Items
25888
Laatst verkocht
1 week geleden


Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen