MSSC 4.0 Quality Practices & Measurements Exam
2026 Actual Comprehensive Real Exam Questions And
Verified Answers ||Verified Exam!!(100% Correct
Answers) Already Graded A+ | Guaranteed Success
||Just Released!!!
What happens when you eliminate quality variances? -
Answers-You Improved process quality.
Spreadsheets are used to perform calculations in ____. -
Answers-Rows and columns
Spreadsheets are used to form ___. - Answers-graphs
To make sure the appropriate parties are notified, use a
__________. - Answers-Predetermined distribution list
First piece inspection is required for __________. -
Answers-Documenting repeatable setups
To identify and eliminate waste activities proves a
company is operating in __________. - Answers-A
continuous improvement environment
,2|Page
A history of dependability and customer satisfaction should
be considered when __________. - Answers-Evaluating a
potential supplier
Of the four roles of management, controlling covers: -
Answers-Monitoring actual to standard work performance
To reduce variation, minimize defects, and to shorten cycle
time are considered __________ goals. - Answers-Quality
Everyone within an organization is responsible for
__________ quality. - Answers-Improving
Product development teams should perform a(n)
__________ as early as possible during their design
process. - Answers-Design Failure Mode and Effects
Analysis
Design failure mode and effects analysis (DFMEA) -
Answers-systematic group of activities used to recognize
and evaluate potential systems, products or process
failures
,3|Page
Greater variations in a process may occur when
__________. - Answers-Unapproved process adjustments
are performed
The purpose of ISO 9000 is to help companies
__________. - Answers-Improve Quality
The quality plan documents how the company is going to
reach its quality goals in the scope of the __________. -
Answers-Quality management system
An employee should report to their supervisor if the
following situation occurs: - Answers-There is an increase
in the number of defective parts produced by a machine.
Defect prevention is the __________ of the four types of
quality costs. - Answers-Most cost effective
__________ should be validated and approved to ensure
accuracy. - Answers-Standard operating procedures
, 4|Page
Kaizen, Kanban, and 5S are just a few of many elements
used in a(n) __________ operation. - Answers-Just In
Time (JIT)
5S is a lean manufacturing technique that focuses on
creating a(n) __________. - Answers-Clean and orderly
work area
Companies often __________ to create a baseline
measurement for improvements in machine performance.
- Answers-Establish a metric
The performance of the product as viewed by the
customer is ultimately the most important measure of
__________. - Answers-Product quality
The number of defects produced is a measure of
__________ - Answers-The effectiveness of a quality
assurance system
The systematic way to eliminate activities that do not add
value to the product in all processes from customer order