C HAPTER 1: V B COMMERCIAL BUILDING PLANS AND SPECIFICATIONS
TABLE OF CONTENTS
Review ...................................................................................................................................................... 1
Note to instructor:
vb v b v b It is recommended that students be required to respond,
v b v b v b v b v b v b v b v b
where appropriate,
v b vb v b with answers that are complete
v bsentences. v b v b v b v b
REVIEW
Refer to the vb v b v b National Electrical Code or the working drawings when
v b v b vb vb v b v b v b
necessary.
v b v b Where applicable, responses
vbshould be written in v b v b v b v b v b
complete
v b v b sentences.
1. What section of a commercial v b v b building’s specification v b contains a
list of contract
vb documents?
vb v b
Answer: A list of the contract documents is contained in
General Clauses and Conditions. A listing of the Commercial
Building contract documents is presented in this chapter under the
h eading ―Commercial Buil ding Plans.‖ The instructor may wish to have the
students check over this listing and compare it with the
plans provided.
2. The requirement for temporary
v b light and power at the job site v b v b v b v b v b v b v b v b v b v b will
v beb found in what portion of a commercial building’s specification?
v b v b v b vb v b v b v b v b v b
Answer: The Supplementary v General
b Conditions specifies
v b the v b v b v b v b
job v site requirements
b v b for temporary vb light and power. In v b v b v b v b v b v b
somev b contracts, this v b v b
electrical system becomes the v responsibility
b of the general v b v b v b v b v b v b
contractor; in other contracts,
v b it is v the belectrical contractor’s
v b vb v b v b v b v b v b
responsibility to install
v b and maintain the temporary electrical v b v b v b v b vb v b v b
system. The
v b instructor may wish
v b to refer the
v b student to v b v b v b v b v b v b vb
NEC
v bArticle 590 vand discuss
b the requirements in v detail.
b v b v b v b v b v b v b
3 | P a
, 3. The v b electrician v b uses v b the v b Schedule v b of v b Working v b Drawings v b for what v b
purpose?
v b
Answer: The electrician uses the Schedule of Working Drawings v b
to determine whether
v b vb all of the drawings are at hand. v b v b v b v b v b v b v b
The
v binformation on v b v b
―the other sheets‖
v b may be very important,
v b especially in v b v b v b v b v b v b
v coordinating
b with other contractors. v b vb v b
4. Complete the following items by indicating the letter(s)
v b v b v b v b v b v b v b
designating the correct
v b source(s) of information:
v b vb v b v b v b
No. Answer Item Information
4. Sections Ceiling v b height Sections, Sheet A6
5. Electrical Electrical Electrical symbol schedule, v b v b
symbo
vb receptacle
vb Chapter 2,
v b Figure 2–6 vb v b
l style
v b
schedu
vb
l
e
6. Electrical Electrical Electrical layout drawings, vb v b
layout
vb outlet
vb Sheets El,
vb E2, and vb v b v b v b E3
drawin
vb location
vb
gs
v b
7. Elevations Exterior wall v b v b finishes Elevations, Sheets A4 and A5
8. Site plan Grading v b v b elevations Site plan, Sheet A4
9. Electrical Panelboard schedules Electrical layout drawings, Sheet E4
layout
vb
drawin
vb
gs
v b
10. Architectural Room v b width Architectural floor vb v b plan, Sheets
v b
floor vb Al, A2,
v b and vb v b v b A3
plan v b
11. Architectural Swing of door Architectural floor v b v b plan, v b Sheets v b Al, v b A2,