100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

WGU C722 Project Management Comprehensive Resource To Help You Ace Includes Frequently Tested Questions With ELABORATED 100% Correct COMPLETE SOLUTIONS Guaranteed Pass First Attempt!! Current Update!!

Rating
-
Sold
-
Pages
170
Grade
A+
Uploaded on
05-01-2026
Written in
2025/2026

WGU C722 Project Management Comprehensive Resource To Help You Ace Includes Frequently Tested Questions With ELABORATED 100% Correct COMPLETE SOLUTIONS Guaranteed Pass First Attempt!! Current Update!! 1. What three essential drivers must be present to foster positive characteristics within project teams? Answer: Cohesiveness, trust, and motivation are the foundational drivers that enable effective collaboration, engagement, and sustained team performance. b. Which three drivers must be present to foster positive characteristics within a project team? A. Authority, communication, accountability B. Cohesiveness, trust, motivation C. Leadership, structure, planning D. Skills, budget, scheduling Correct Answer: B 2. What stages of group development were introduced by Dr. Bruce Tuckman in 1965? Answer: The five stages of group development are forming, storming, norming, performing, and adjourning. b. Which sequence represents the five stages of group development introduced by Bruce Tuckman? A. Planning, forming, executing, closing, adjourning B. Initiating, planning, executing, monitoring, closing C. Forming, storming, norming, performing, adjourning D. Orientation, conflict, resolution, productivity, closure Correct Answer: C 3. How is the forming stage of group development characterized? Answer: The forming stage is marked by initial introductions, relationship building, and information exchange. Team members are becoming acquainted and learning about the project and one another, but the group has not yet fully developed into a functioning team. b. During which stage of group development are team members first introduced and relationships begin to form? A. Storming B. Norming C. Performing D. Forming Correct Answer: D 4. What occurs during the storming stage of team development? Answer: During the storming stage, team members begin to assert themselves and clarify roles. Conflict may arise as individuals compete for influence, personalities emerge, and working relationships are tested while the team learns how to collaborate effectively. b. Which stage of group development is characterized by conflict, competition, and role clarification? A. Norming B. Storming C. Performing D. Adjourning Correct Answer: B 5. How does the norming stage differ from earlier stages of group development? Answer: In the norming stage, team members establish trust, mutual understanding, and effective communication patterns. Collaboration improves, and individuals feel comfortable sharing ideas and working together toward shared goals. b. In which stage do team members develop trust and establish effective working relationships? A. Forming B. Storming C. Norming D. Adjourning Correct Answer: C

Show more Read less
Institution
WGU C722 Project Management
Course
WGU C722 Project Management











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
WGU C722 Project Management
Course
WGU C722 Project Management

Document information

Uploaded on
January 5, 2026
Number of pages
170
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

WGU C722 Project Management Comprehensive
Resource To Help You Ace 2026-2027

Includes Frequently Tested Questions With ELABORATED
100% Correct COMPLETE SOLUTIONS

Guaranteed Pass First Attempt!! Current Update!!


1. What three essential drivers must be present to foster positive characteristics
within project teams?
Answer: Cohesiveness, trust, and motivation are the foundational drivers that
enable effective collaboration, engagement, and sustained team
performance.
b. Which three drivers must be present to foster positive characteristics
within a project team?
A. Authority, communication, accountability
B. Cohesiveness, trust, motivation
C. Leadership, structure, planning
D. Skills, budget, scheduling
Correct Answer: B
2. What stages of group development were introduced by Dr. Bruce Tuckman in
1965?
Answer: The five stages of group development are forming, storming,
norming, performing, and adjourning.
b. Which sequence represents the five stages of group development
introduced by Bruce Tuckman?
A. Planning, forming, executing, closing, adjourning
B. Initiating, planning, executing, monitoring, closing
C. Forming, storming, norming, performing, adjourning

, D. Orientation, conflict, resolution, productivity, closure
Correct Answer: C
3. How is the forming stage of group development characterized?
Answer: The forming stage is marked by initial introductions, relationship-
building, and information exchange. Team members are becoming
acquainted and learning about the project and one another, but the group
has not yet fully developed into a functioning team.
b. During which stage of group development are team members first
introduced and relationships begin to form?
A. Storming
B. Norming
C. Performing
D. Forming
Correct Answer: D
4. What occurs during the storming stage of team development?
Answer: During the storming stage, team members begin to assert
themselves and clarify roles. Conflict may arise as individuals compete for
influence, personalities emerge, and working relationships are tested while
the team learns how to collaborate effectively.
b. Which stage of group development is characterized by conflict,
competition, and role clarification?
A. Norming
B. Storming
C. Performing
D. Adjourning
Correct Answer: B
5. How does the norming stage differ from earlier stages of group
development?
Answer: In the norming stage, team members establish trust, mutual
understanding, and effective communication patterns. Collaboration

, improves, and individuals feel comfortable sharing ideas and working
together toward shared goals.
b. In which stage do team members develop trust and establish effective
working relationships?
A. Forming
B. Storming
C. Norming
D. Adjourning
Correct Answer: C
6. What defines the performing stage of team development?
Answer: The performing stage is characterized by high levels of trust,
efficiency, and productivity. Team members work cohesively, relationships are
well established, and meaningful progress toward project objectives is
achieved.
b. A project team that works efficiently with strong trust and productivity is in
which stage?
A. Forming
B. Performing
C. Norming
D. Storming
Correct Answer: B
7. When does the adjourning stage occur in a project team’s lifecycle?
Answer: The adjourning stage occurs once all project work has been
completed and the team is no longer required. This stage may occur at
different points in the project lifecycle depending on the project’s structure.
b. When does the adjourning stage occur?
A. At project initiation
B. During execution
C. When the project is placed on hold

, D. After all project work is completed
Correct Answer: D
8. What is meant by a co-located project team?
Answer: A co-located team consists of members who work in the same
physical location or regularly meet together in a shared environment,
facilitating face-to-face communication and collaboration.
9. How are virtual teams defined in project management?
Answer: Virtual teams are composed of members who primarily
communicate through electronic means. Team members may be located in
the same building or dispersed across different geographic regions or time
zones.
10.What situations commonly lead to changes in a project’s baseline scope?
Answer: Scope changes may occur when additional functionality is added or
when scope must be reduced due to environmental changes such as
decreased funding, altered requirements, or revised deadlines.
11.What is scope creep, and why is it a concern in project management?
Answer: Scope creep refers to the unauthorized expansion of project scope
without formal evaluation or approval. It can lead to budget overruns, missed
deadlines, and reduced project quality.
12.What is the purpose of work performance data?
Answer: Work performance data identifies which project activities have been
completed, partially completed, or not yet started, providing insight into
project progress.
13.What information is contained in a risk register?
Answer: A risk register documents identified risks, monitoring strategies, and
planned actions to be taken should risk events occur.
14.How is corrective action used within a project?
Answer: Corrective action documents quality failures and outlines steps for
correction. It may involve reworking deliverables and revising project plans to
prevent recurrence of errors.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EWLindy Harvard University
View profile
Follow You need to be logged in order to follow users or courses
Sold
710
Member since
3 year
Number of followers
431
Documents
7433
Last sold
3 days ago
EN.CY.CLO.PE.DI.A

As a Career Tutor, I understand the pressure of managing demanding coursework, exams, and practical requirements across multiple disciplines. These professionally organized revision materials are designed to support students in nursing, healthcare administration, business, information systems, Engineering, health, IT, or trade courses management programs by simplifying complex concepts and reinforcing high-yield academic content. The materials are developed to help students: Understand core theories and practical applications across Multiple Disciplines Review exam relevant content aligned with undergraduate and graduate curriculam To Strengthen critical thinking, analytical reasoning, and decision-making skills Save time with clear, structured summaries instead of overwhelming textbooks Prepare efficiently for tests, assignments, case studies, and professional exams Each resource is created with academic standards in mind, integrating real world examples, industry terminology, and evidence based concepts commonly required in professional programs. Whether you are studying nursing fundamentals, healthcare management, information systems, project management, business strategy, Engineering these materials provide focused, reliable support for academic success. These revision guides are ideal for: Nursing and allied health students Healthcare administration and public health students Business, MBA, and management students Information technology and information systems students, engineering, business, IT, or trade courses If you are looking for clear, student-friendly, exam-focused revision materials that support multiple career pathways, these resources are designed to help you study smarter, perform better, and stay confident throughout your academic journey. WISH YOU SUCCESS!!

Read more Read less
3.8

107 reviews

5
55
4
13
3
16
2
6
1
17

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions