100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

ICC VAPOR RECOVERY 2 FINAL EXAM ACTUAL QUESTIONS AND SOLUTIONS RATED A+

Puntuación
-
Vendido
-
Páginas
8
Grado
A+
Subido en
04-01-2026
Escrito en
2025/2026

ICC VAPOR RECOVERY 2 FINAL EXAM ACTUAL QUESTIONS AND SOLUTIONS RATED A+

Institución
ICC VAPOR RECOVERY
Grado
ICC VAPOR RECOVERY









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
ICC VAPOR RECOVERY
Grado
ICC VAPOR RECOVERY

Información del documento

Subido en
4 de enero de 2026
Número de páginas
8
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

ICC VAPOR RECOVERY 2 FINAL EXAM ACTUAL QUESTIONS
AND SOLUTIONS RATED A+
✔✔Automatic line leak detectors shall be installed on underground pressurized piping
and be capable to detect a 3-gallon per hour leak rate at 10 psi within 1 hour, with a
probability of detection of at least ___? - ✔✔95%

✔✔Stage II Vapor Recovery Systems are the transfer of vapors from _________ to
_________. - ✔✔Vehicle Tank to UST

✔✔Who is ultimately responsible at a (GDF) Gasoline Dispensing Facility? - ✔✔Owner/
Operator

✔✔You are conducting a maintenance repair and you have a gasoline spill, you shall
take the following step as a safety precaution. - ✔✔Call 911-barricade spill area-clean
as much as you can and dispose of properly

✔✔Pressure Decay Test is tested in the of the UST - ✔✔Ullage

✔✔The Phil-tite riser float shall have __of clearance when installed - ✔✔13 inches

✔✔Upgrade requirements for UST's, spill and overfill prevention and underground
piping were required to be completed by what date? - ✔✔December 22, 1998

✔✔A balanced system shall contain a nozzle equipped with a ______ - ✔✔Bellows

✔✔On a Vacuum assist inverted coaxial hose, the vapors travel: - ✔✔In the inside
pathway of the hose

✔✔The tank riser drop tube is typically installed: - ✔✔Below the spill bucket

✔✔A ball float prevention system is designed and installed to: - ✔✔Alert the transfer
operator when the tank is 90% full by restricting flow

✔✔A UST will NOT require overfill prevention equipment if: - ✔✔Transfers are less than
25 gallons at a time

✔✔Suction piping operates at what pressure? - ✔✔Less that atmospheric pressure

✔✔close as practical to the suction pump, The maximum number of check valves
allowed for a system that operates at less than atmospheric pressure shall be _ . -
✔✔Below grade

, ✔✔Spill containers shall be a minimum capacity of _____ - ✔✔5 gallons

✔✔Design & Construction requirements for New Underground Storage Tanks and all
other components became effective. - ✔✔January 1 1995

✔✔Tank Integrity Test means: test methods which are capable of detecting a leak of __
gallons per hour with a probability of detection of at least 95%. - ✔✔0.1

✔✔Existing Underground Storage Tank means a UST installed prior to. - ✔✔January 1
1984

✔✔Where is a Vapor Shear valve located? - ✔✔Under the dispenser

✔✔Given that one valve shall remain open on a Healy Separator for normal operations,
the valve that shall remain open is . - ✔✔At the top

✔✔The emergency shut-off valve is located. - ✔✔Inside the kiosk

✔✔Vapor return piping shall have a uniform slope of at least ______. - ✔✔1/8" per foot

✔✔Typically vapor-return piping is connected to _____ - ✔✔The lowest grade gasoline

✔✔A liquid collection point is installed: - ✔✔In the vapor return piping

✔✔When installing vapor recovery piping in a trench, piping shall be excavation wall. -
✔✔6

✔✔The bedding for vapor recovery piping trench shall be ___inch of bedding material. -
✔✔6

✔✔Recommended underground piping backfill & compaction shall be __ in. maximum
size pea gravel. - ✔✔¾

✔✔place marking/metallic tape, place cooper wire with ends exposed, Before backfilling
underground piping, document the actual location of piping in as-built drawings as
follows: - ✔✔Take pictures

✔✔When making a transition from steel to nonmetallic piping: - ✔✔Loin female steel
threads to male non-metallic threads

✔✔Riser piping for fill side typically shall be of __ in. diameter schedule 40 steel piping.
- ✔✔4
$12.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
BOARDWALK Havard School
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
182
Miembro desde
1 año
Número de seguidores
7
Documentos
24136
Última venta
6 días hace
BOARDWALK ACADEMY

Ace Your Exams With Top Quality study Notes And Paper✅✅ ALL ACADEMIC MATERIALS AVAILABLE WITH US✅✅ LEAVE A REVIEW SO THAT WE CAN LOOK AND IMPROVE OUR MATERIALS.✅✅ WE ARE ALWAYS ONLINE AND AVAILABLE DONT HESITATE TO CONTACT US FOR SYUDY GUIDES!!✅✅ EVERYTHING IS GRADED A+✅✅ COLOUR YOUR GRADES WITH US , WE ARE HERE TO HELP YOU DONT BE RELACTANT TO REACH US

3.7

33 reseñas

5
14
4
6
3
7
2
0
1
6

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes