100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

ICC VAPOR RECOVERY 2 COMPREHENSIVE EXAM UPDATED QUESTIONS AND SOLUTIONS RATED A+

Rating
-
Sold
-
Pages
7
Grade
A+
Uploaded on
04-01-2026
Written in
2025/2026

ICC VAPOR RECOVERY 2 COMPREHENSIVE EXAM UPDATED QUESTIONS AND SOLUTIONS RATED A+

Institution
ICC VAPOR RECOVERY
Course
ICC VAPOR RECOVERY









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ICC VAPOR RECOVERY
Course
ICC VAPOR RECOVERY

Document information

Uploaded on
January 4, 2026
Number of pages
7
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

ICC VAPOR RECOVERY 2 COMPREHENSIVE EXAM UPDATED
QUESTIONS AND SOLUTIONS RATED A+
✔✔Automatic line leak detectors shall be installed on underground pressurized piping
✔✔place marking/metallic tape, place cooper wire with ends exposed, Before backfilling
underground piping, document the actual location of piping in as-built drawings as
follows: - ✔✔Take pictures

✔✔When making a transition from steel to nonmetallic piping: - ✔✔Loin female steel
threads to male non-metallic threads

✔✔Riser piping for fill side typically shall be of __ in. diameter schedule 40 steel piping.
- ✔✔4

✔✔Dispenser risers are commonly how many inches? Schedule 40 pipe or flex
connectors. - ✔✔3

✔✔When air testing newly installed vapor piping, it shall be tested at psig for a period of
___ - ✔✔ hour

✔✔Before air testing piping, as a safety precaution you shall: - ✔✔Isolate piping from
tanks and dispensers

✔✔Lines or tanks that have previously contained hazardous, flammable, or combustible
liquids/vapors shall be tested - ✔✔Shall be tested only after lines are purged and
inerted

✔✔When using a digital manometer, it shall be warmed up for ____ minutes prior to
use. - ✔✔15 (must be calibrated every 90 days)

✔✔A low pressure testing method that evaluates all vapor recovery system components
from the nozzle, through the hanging hardware, the dispenser, the piping, the tank &
tank risers, the vent pipe, & vent cap. - ✔✔Pressure Decay Test

✔✔When performing the Pressure Decay Test, use commercial grade Nitrogen in a
high pressure cylinder capable of maintaining at least __ PSIG of pressure. - ✔✔2000
(2 pressure gauges recommended)

✔✔Hanging hardware does not contain what? - ✔✔Vapor switch

✔✔A test of Stage II vapor-recovery piping that measures the resistance to flow in the
vapor path between the nozzle or dispenser riser and the storage tank. The purpose of
the test is to verify that there are no physical or liquid blockages obstructing the flow of

, vapors in the piping system. (FOR VACUUM ASSIST SYSTEMS ONLY) - ✔✔Dynamic
Pressure Test

✔✔A test procedure that measures the volume of air returned to a storage tank when a
specified volume of gasoline is dispensed from a vacuum-assist vapor-recovery nozzle.
- ✔✔Air to Liquid (A/L) Ratio Test

✔✔A nozzle face seal is located. - ✔✔At the end of the nozzle bellows

✔✔Motor fuels are_a complex mixture of chemicals, many of which are toxic. Before
working around a fuel dispenser, workers should read and understand what? -
✔✔MSDS

✔✔When performing activities that may result in accidental contact with motor fuel, use
the following hand protection: - ✔✔Nitrile Gloves

✔✔If motor fuel accidentally comes in contact with your eyes, ensure you flush your
eyes with water for ____ min and seek medical attention. - ✔✔15

✔✔The shear section of the Vapor Shear Valve must be positioned within ___ in above
or below the level of the top surface of the dispenser island. - ✔✔½ in

✔✔if the flow rate at the dispenser is less than 6.5 GPM replace the following. - ✔✔Fuel
filters

✔✔ESO does not disconnect power to the following: - ✔✔Monitoring Device

✔✔A space that is not designed for continuous employee occupancy. - ✔✔Confined
Space

✔✔Where should the PV vent be tightened? - ✔✔With a suitable wrench from the screw
above the cap

✔✔A Phil Tite rotatable adaptor shall be tightened to a torque between ___ and ___ lbs.
- ✔✔50 to 75 foot lbs

✔✔When installing the OPW drop tube seal the following shall be observed: - ✔✔Install
the install with the special designed drop tube o-ring seal with the flat side against the
drop tube flare

✔✔Where should the OPW drop tube be installed? - ✔✔6 inches from the bottom of the
tank

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BOARDWALK Havard School
View profile
Follow You need to be logged in order to follow users or courses
Sold
182
Member since
1 year
Number of followers
7
Documents
24136
Last sold
6 days ago
BOARDWALK ACADEMY

Ace Your Exams With Top Quality study Notes And Paper✅✅ ALL ACADEMIC MATERIALS AVAILABLE WITH US✅✅ LEAVE A REVIEW SO THAT WE CAN LOOK AND IMPROVE OUR MATERIALS.✅✅ WE ARE ALWAYS ONLINE AND AVAILABLE DONT HESITATE TO CONTACT US FOR SYUDY GUIDES!!✅✅ EVERYTHING IS GRADED A+✅✅ COLOUR YOUR GRADES WITH US , WE ARE HERE TO HELP YOU DONT BE RELACTANT TO REACH US

3.7

33 reviews

5
14
4
6
3
7
2
0
1
6

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions