100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

ICC VAPOR RECOVERY 2 ACTUAL 2026 EXAM QUESTIONS AND SOLUTIONS RATED A+

Rating
-
Sold
-
Pages
11
Grade
A+
Uploaded on
04-01-2026
Written in
2025/2026

ICC VAPOR RECOVERY 2 ACTUAL 2026 EXAM QUESTIONS AND SOLUTIONS RATED A+

Institution
ICC VAPOR RECOVERY
Module
ICC VAPOR RECOVERY









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ICC VAPOR RECOVERY
Module
ICC VAPOR RECOVERY

Document information

Uploaded on
January 4, 2026
Number of pages
11
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

ICC VAPOR RECOVERY 2 ACTUAL 2026 EXAM QUESTIONS
AND SOLUTIONS RATED A+
✔✔According to PEI RP-300 a "written scope of work" for vapor recovery installation
should include:

a. permit fees
b. construction plans
c. hours of station operation
d. applicable air district rules - ✔✔b. construction plans

✔✔Existing vapor recovery equipment may be replaced by that of another manufacturer
if:

a. certified by CARB
b. allowed by the local air district
c. the only equipment the supply house has
d. listed in the Executive Order for the vapor recovery system - ✔✔d. listed in the
Executive Order for the vapor recovery system

✔✔To be prepared for a fuel spill, a technician should have a spill kit readily available
that should include all of the following EXCEPT:

a. caution tape
b. an absorbent boom
c. a type A fire extinguisher
d. fuel-absorbent materials or pads - ✔✔a. caution tape

✔✔According to Executive Order VR 201-A, which of the following could cause a nozzle
shutoff mechanism to malfunction?

a. damaged spout O-rings
b. dispenser filter seal damaged
c. dispensing flow rate exceeds 10 gpm
d. nozzle spout not inserted into vehicle fill pipe correctly - ✔✔d. nozzle spout not
inserted into vehicle fill pipe correctly

✔✔According to Executive Order VR-201-A, breakaway reconnections must be:

a. reported to CARB within 48 hours
b. logged in the GDF Maintenance Log
c. performed by the station operator only
d. performed within 24 hours of the drive-off occurrence - ✔✔b. logged in the GDF
Maintenance Log

, ✔✔Under what condition may a vapor recovery nozzle have a dispensing rate greater
than 10 gals/minute.

a. under no condition
b. only if local air district permits it
c. only if the vapor recovery system includes a vapor processor
d. only if the vehicle fuel tank has capacity greater than 10 gallons - ✔✔a. under no
condition

✔✔According to the Vapor Recovery Equipment Defects List (VRED), any OPW 12VW
nozzle vapor escape guard (BEG) with one-half of the circumference missing or
equivalent cumulative damage is:

a. consider a defect
b. considered a violation
c. not considered a defect
d. required to be tagged out until repaired - ✔✔c. not considered a defect

✔✔A properly operating balance system nozzle will allow dispensing only when the:

a. nozzle vapor valve is closed
b. vapor processor is operational
c. nozzle boot (bellow) is compressed
d. faceplate creates a continuous seal - ✔✔c. nozzle boot (bellow) is compressed

✔✔The best reference for determining what Phase II vapor recovery equipment is
certified for use at a specific gasoline dispensing facility (GDF) is:

a. the building permit for the GDF
b. Title 17, California Code of Regulations
c. the local petroleum equipment authorized dealer
d. the CARB Executive Order applicable to the GDF's Phase II vapor recovery system -
✔✔d. the CARB Executive Order applicable to the GDF's Phase II vapor recovery
system

✔✔According to PEI RP300, all of the following methods of documenting the piping
location are recommended EXCEPT:

a. taking photos of piping layout prior to burial
b. placing marking tape or metallic locating tape in the backfill over the piping
c. sketching a pipe diagram on inside cover of vapor recovery equipment manual
d. installing a bare copper wire over the piping with ends exposed at dispenser and tank
- ✔✔c. sketching a pipe diagram on inside cover of vapor recovery equipment manual

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BOARDWALK Havard School
View profile
Follow You need to be logged in order to follow users or courses
Sold
182
Member since
1 year
Number of followers
7
Documents
24136
Last sold
6 days ago
BOARDWALK ACADEMY

Ace Your Exams With Top Quality study Notes And Paper✅✅ ALL ACADEMIC MATERIALS AVAILABLE WITH US✅✅ LEAVE A REVIEW SO THAT WE CAN LOOK AND IMPROVE OUR MATERIALS.✅✅ WE ARE ALWAYS ONLINE AND AVAILABLE DONT HESITATE TO CONTACT US FOR SYUDY GUIDES!!✅✅ EVERYTHING IS GRADED A+✅✅ COLOUR YOUR GRADES WITH US , WE ARE HERE TO HELP YOU DONT BE RELACTANT TO REACH US

3.7

33 reviews

5
14
4
6
3
7
2
0
1
6

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions