Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 11 pages
Exam (elaborations)

ICC VAPOR RECOVERY 2 ACTUAL 2026 TEST PAPER QUESTIONS AND SOLUTIONS RATED A+

Document preview thumbnail
Preview 2 out of 11 pages

ICC VAPOR RECOVERY 2 ACTUAL 2026 TEST PAPER QUESTIONS AND SOLUTIONS RATED A+

Content preview

ICC VAPOR RECOVERY 2 ACTUAL 2026 TEST PAPER
QUESTIONS AND SOLUTIONS RATED A+
✔✔According to PEI RP300, as-built drawings or photos of the underground piping and
other components should be maintained:

a. for at least 5 years
b. for at least 10 years
c. as long as the UST is in service
d. indefinitely - ✔✔c. as long as the UST is in service

✔✔According to Executive Order VR-101-E maintenance records are required to
include all of the following items EXCEPT the:

a. name of the designated UST operator
b. name of the individual making the repair
c. date the failure occurred or was observed
d. phone number of the individual making the repair - ✔✔a. name of the designated
UST operator

✔✔In a balance system, the vapor returns to the underground tank through all of the
following EXCEPT:

a. bellows
b. inner hose
c. breakaway valve
d. dispenser vapor piping - ✔✔b. inner hose

✔✔The Phil-Tite EVR Phase I system requires that vapor vent pipes at any UST system
be:

a. manifolded belowground
b. manifolded aboveground
c. manifolded to install one P/V valve
d. used with no more than 3 P/V valves - ✔✔d. used with no more than 3 P/V valves

✔✔After July 1, 2003, the definition of piping includes the following EXCEPT:

a. tank (fill) riser
b. product piping
c. dispenser hose
d. vapor recovery and vent piping - ✔✔c. dispenser hose

✔✔Under Dispenser Containment (UDC) is required to be designed and constructed in
accordance with:

, a. the appropriate executive order
b. generally accepted secondary containment practices
c. standards of an independent testing organization with industry code
d. an engineering specification approved by a state-registered professional engineer or
engineering standard - ✔✔c. standards of an independent testing organization with
industry code

✔✔Given: Oxygen depletion produces a range of physiological effects that worsen as
oxygen content is lowered or exposure time is increased.

The first sign of oxygen depletion is:

a. dizziness
b. rapid fatigue
c. labored breathing
d. accelerated respiration and heartbeat - ✔✔a. dizziness

✔✔Where a vapor shear valve is required, it is installed in the vapor piping at the:

a. vapor adaptor
b. entrance to a condensate tank
c. base of each dispensing device
d. extractor fitting or the ball float valve - ✔✔b. entrance to a condensate tank

✔✔A positive shutoff overfill prevention device (overfill valve) must stop the flow of fuel
when the fuel is more than ____ % of the tank capacity.

a. 85
b. 90
c. 95
d. 97 - ✔✔c. 95

✔✔Which of the following is not an overfill device?

a. ball float
b. spill bucket
c. tank overfill alarm
d. drop tube flapper valve - ✔✔b. spill bucket

✔✔According to CCR, Title 23, UST Regulations, a spill container must have a
minimum capacity of ____ gallons.

a. 5
b. 10

Document information

Uploaded on
January 4, 2026
Number of pages
11
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BOARDWALK
3.5
(41)
Sold
283
Followers
10
Items
32850
Last sold
17 hours ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions