AND SOLUTIONS RATED A+
✔✔According to Executive Order VR-201-A, a pressure/vacuum (P/V) vent valve shall
be secured with a torque setting between ____ ft. lbs.
a. 10-20
b. 20-50
c. 50-75
d. 75-100 - ✔✔b. 20-50
✔✔When installing a Healy VP-1000 Vac-Motors, a technician should do all of the
following EXCEPT:
a. replace the nozzle
b. wear eye protection
c. properly barricade the area
d. turn off power to the dispenser - ✔✔a. replace the nozzle
✔✔The clean air separator is a component of the:
a. OPW phase I EVR
b. Phil-Tite Phase I EVR
c. Healy EVR Phase II EVR
d. OPW Vapor Saver - ✔✔c. Healy EVR Phase II EVR
✔✔According to Healy Executive Order VR-201-A Vapor Recovery Repair Records are
to be maintained by the:
a. local air district
b. repair contractor
c. testing contractor
d. gasoline dispensing facility (GDF) operator - ✔✔d. gasoline dispensing facility (GDF)
operator
✔✔According to Executive Order VR-201-A, if the dispensing vacuum of the Healy VP-
1000 pump is below ____ inches of water column, the dispenser should be removed
from service.
a. 50
b. 60
c. 75
d. 100 - ✔✔b. 60
, ✔✔According to the Vapor Recovery Defects List (VRED), the ____ of any component
required to be used by the system's Executive Order is not considered a defect.
a. absence
b. disconnection
c. proper installation
d. improper installation - ✔✔c. proper installation
✔✔According to CP-201, liquid traps in the dispenser vapor piping are:
a. not allowed
b. allowed only with an assist system
c. allowed if approved by the Phase II system manufacturer
d. allowed when hoses with liquid removal systems are used - ✔✔a. not allowed
✔✔The dynamic pressure drop standards from the tip of the nozzle spout to the
underground storage tank, with the Phase I vapor poppet open, shall not exceed the
following:
_____ inches H2O at a flowrate of _____ CFH of Nitrogen; and
_____ inches H2O at a flowrate of _____ CFH of Nitrogen. - ✔✔0.35 inches H2O at a
flowrate of 60 CFH of Nitrogen; and
0.62 inches H2O at a flowrate of 80 CFH of Nitrogen.
✔✔Product levels less than ____ inches above the highest opening at the bottom of the
submerged drop tube may bias the results toward noncompliance. - ✔✔4"
✔✔ After backfilling the vapor return and vent lines, the maximum pressure drop
through the system shall not exceed ________at 60 cubic feet per hour as determined
by TP-201.4, Dynamic Backpressure.
a. 0.75 inches WC
b. 0.5 inches WC
c. 0.32 inches WC
d. 0.55 inches WC - ✔✔c. 0.5 inches WC
✔✔CARB's most recent vapor recovery regulations are known as:
a. EVR (enhanced vapor recovery)
b. CVR (California vapor recovery)
c. PVR (protective vapor recovery)
d. ORVR (onboard refueling vapor recovery) - ✔✔a. EVR (enhanced vapor recovery)