logo-home

Josephnyaga1997

On this page, you find all documents, package deals, and flashcards offered by seller josephnyaga1997.

Tutor josephnyaga1997 helps you study by writing summaries of study material

Community

  • Followers
  • Following

1 items

Plumbing Questions with Answers

(0)
$13.49
0x  sold

Plumbing Questions with Answers Building sewers shall be tested by completely filling the sewer with water from the ______ A. Lowest to highest point B. Lowest to at least 5' head C. Lowest to at least 10' head D. Lowest to at least ground level - Answer-C. Lowest to at least 10' head Hot and cold water piping may be tested with ____ A. 40 psi-150 psi water for 10 minutes B. 35 psi for at least 15 minutes C. 50 psi or the working pressure of the water in the system for at least 15 ...

i x
  • Exam (elaborations)
  •  • 22 pages • 
  • by josephnyaga1997 • 
  • uploaded  27-09-2023
Quick View
i x