Charlene's Scholastic Emporium.
Your Actual and Virtual Exam Tests Excellent Tutor.
- 10032
- 0
- 757
Community
- Followers
- Following
35 Reviews received
33 items
Review of API-653 Questions and Answers 100% Pass
Review of API-653 Questions and Answers 100% Pass 
Replacement shell plate may be circular,oblong,square with rounded corners or 
rectangular with rounded corners except when: - Correct Answer ️️ -an entire shell 
plate is replaced 
Shell replacement patch plates shall be welded with butt joints with complete 
penetration and complete fusion, except as: - Correct Answer ️️ -permitted for lapped 
patch shell repairs 
Joints in lap-welded shell tanks: - Correct Answer ️️ -may be repair...
- Package deal
- Exam (elaborations)
- • 8 pages •
Review of API-653 Questions and Answers 100% Pass 
Replacement shell plate may be circular,oblong,square with rounded corners or 
rectangular with rounded corners except when: - Correct Answer ️️ -an entire shell 
plate is replaced 
Shell replacement patch plates shall be welded with butt joints with complete 
penetration and complete fusion, except as: - Correct Answer ️️ -permitted for lapped 
patch shell repairs 
Joints in lap-welded shell tanks: - Correct Answer ️️ -may be repair...
API 653 Certification - Practice Exam - Open Book Questions and Answers 100% Pass
API 653 Certification - Practice Exam - Open 
Book Questions and Answers 100% Pass 
An insert plate is required for a new 4 NPS nozzle (4.5" O.D.) in the shell. What is the 
minimum diameter for this insert? 
A. 4.5" 
B. 9" 
C. 12" 
D. 16.5" - Correct Answer ️️ -D. 16.5" 
A welder is qualified on a plate in the 3G position. The welder is qualified for what fillet 
weld position(s)? 
A. None 
B. F, H 
C. F, H, V 
D. All fillets - Correct Answer ️️ -C. F, H, V 
When must a shim be pl...
- Package deal
- Exam (elaborations)
- • 26 pages •
API 653 Certification - Practice Exam - Open 
Book Questions and Answers 100% Pass 
An insert plate is required for a new 4 NPS nozzle (4.5" O.D.) in the shell. What is the 
minimum diameter for this insert? 
A. 4.5" 
B. 9" 
C. 12" 
D. 16.5" - Correct Answer ️️ -D. 16.5" 
A welder is qualified on a plate in the 3G position. The welder is qualified for what fillet 
weld position(s)? 
A. None 
B. F, H 
C. F, H, V 
D. All fillets - Correct Answer ️️ -C. F, H, V 
When must a shim be pl...
API 653 Recertification Quiz with 100% Correct
API 653 Recertification Quiz with 100% Correct 
Per API 653 , with of the following is required when converting an existing tank to 
operation at elevated temperatures when it was not originally designed and constructed 
to API 650, Appendix M? - Correct Answer ️️ -The Shell to bottom joint shall be 
evaluated for fatigue 
When removing an existing tank bottom, all arc-gouged areas of the tank shell-to- 
bottom shall be: - Correct Answer ️️ -examined using magnetic particle inspection, a...
- Package deal
- Exam (elaborations)
- • 5 pages •
API 653 Recertification Quiz with 100% Correct 
Per API 653 , with of the following is required when converting an existing tank to 
operation at elevated temperatures when it was not originally designed and constructed 
to API 650, Appendix M? - Correct Answer ️️ -The Shell to bottom joint shall be 
evaluated for fatigue 
When removing an existing tank bottom, all arc-gouged areas of the tank shell-to- 
bottom shall be: - Correct Answer ️️ -examined using magnetic particle inspection, a...
API-653 – TEMPERATURES EXAM QUESTIONS AND ANSWERS 100% PASS
API-653 – TEMPERATURES EXAM 
QUESTIONS AND ANSWERS 100% PASS 
Reconstruction -Base metal temp where welding is not allowed - Correct Answer ️️ -< 
0 F --- ref. (653: 10.4 .2.3 ) 
Reconstruction -Base metal temp when hand-warm pre-heat is required - Correct 
Answer ️️ -0-32 F --- ref. (653: 10.4.2.3 ) 
Linings -Minimum temp when performing abrasive blasting - Correct Answer ️️ -5 of 
above dew point --- ref. (0.) 
Linings -Minimum temp when installing tank bottom linings - Correc...
- Package deal
- Exam (elaborations)
- • 3 pages •
API-653 – TEMPERATURES EXAM 
QUESTIONS AND ANSWERS 100% PASS 
Reconstruction -Base metal temp where welding is not allowed - Correct Answer ️️ -< 
0 F --- ref. (653: 10.4 .2.3 ) 
Reconstruction -Base metal temp when hand-warm pre-heat is required - Correct 
Answer ️️ -0-32 F --- ref. (653: 10.4.2.3 ) 
Linings -Minimum temp when performing abrasive blasting - Correct Answer ️️ -5 of 
above dew point --- ref. (0.) 
Linings -Minimum temp when installing tank bottom linings - Correc...
Codewest Test -API 650 & 653 Questions with 100% Correct Answers
Codewest Test -API 650 & 653 Questions 
with 100% Correct Answers 
The measurements for internal bottom settlement shall have a maximum of _______ 
feet spacing between elevation points across the diameter? - Correct Answer ️️ -10 
completed welds of stress relieved assemblies shall be examined by ____ ,after stress 
relieving, but before hydrotest - Correct Answer ️️ -MT or PT 
vertical shell joints for new replacement shell plates to existing shell plates or repaired 
joints in the exi...
- Package deal
- Exam (elaborations)
- • 3 pages •
Codewest Test -API 650 & 653 Questions 
with 100% Correct Answers 
The measurements for internal bottom settlement shall have a maximum of _______ 
feet spacing between elevation points across the diameter? - Correct Answer ️️ -10 
completed welds of stress relieved assemblies shall be examined by ____ ,after stress 
relieving, but before hydrotest - Correct Answer ️️ -MT or PT 
vertical shell joints for new replacement shell plates to existing shell plates or repaired 
joints in the exi...
API 653 Data Sheets Exam Questions and Answers 100% Pass
API 653 Data Sheets Exam Questions and 
Answers 100% Pass 
Fitness For Service - Correct Answer ️️ -API 579 
Low Pressure Storage Tanks - Correct Answer ️️ -API 620 
Risked Based Inspection - Correct Answer ️️ -API 580 
Cathodic Protection - Correct Answer ️️ -API 651 
Tank Bottom Linings - Correct Answer ️️ -API 652 
Welding on in service equipment containing flammables - Correct Answer ️️ -API 2201 
NDE Procedure Guidlines - Correct Answer ️️ -ASME Section V 
Accept...
- Package deal
- Exam (elaborations)
- • 15 pages •
API 653 Data Sheets Exam Questions and 
Answers 100% Pass 
Fitness For Service - Correct Answer ️️ -API 579 
Low Pressure Storage Tanks - Correct Answer ️️ -API 620 
Risked Based Inspection - Correct Answer ️️ -API 580 
Cathodic Protection - Correct Answer ️️ -API 651 
Tank Bottom Linings - Correct Answer ️️ -API 652 
Welding on in service equipment containing flammables - Correct Answer ️️ -API 2201 
NDE Procedure Guidlines - Correct Answer ️️ -ASME Section V 
Accept...
API 653 - (9.10) Repair of Tank Bottoms Questions and Answers 100% Pass
API 653 - (9.10) Repair of Tank Bottoms 
Questions and Answers 100% Pass 
dishing settlement - Correct Answer ️️ -*General Repair Req* Welded-on patch plates 
shall not be placed over areas of the tank bottom that have global or local _____ 
[except as allowed by 9.10.1.1 d)], _______, or distortion greater than the limits of 
Annex B. 
12 1/4 bottom 3/8 - Correct Answer ️️ -A welded-on patch plate may be placed over a 
mechanical dent or local dishing if: 
1. Its unsupported dimension d...
- Package deal
- Exam (elaborations)
- • 3 pages •
API 653 - (9.10) Repair of Tank Bottoms 
Questions and Answers 100% Pass 
dishing settlement - Correct Answer ️️ -*General Repair Req* Welded-on patch plates 
shall not be placed over areas of the tank bottom that have global or local _____ 
[except as allowed by 9.10.1.1 d)], _______, or distortion greater than the limits of 
Annex B. 
12 1/4 bottom 3/8 - Correct Answer ️️ -A welded-on patch plate may be placed over a 
mechanical dent or local dishing if: 
1. Its unsupported dimension d...
API 653 Bundled Exams Questions and Answers 100% Verified and Updated 2024 | Graded A
API 653 Bundled Exams Questions and Answers 100% Verified and Updated 2024 | Graded A
- Package deal
- • 12 items •
- API 653 - (9.10) Repair of Tank Bottoms Questions and Answers 100% Pass • Exam (elaborations)
- Code west Test -API 650 & 653 Questions with 100% Correct Answers • Exam (elaborations)
- API-653 – TEMPERATURES EXAM QUESTIONS AND ANSWERS • Exam (elaborations)
- API 653 Recertification Quiz with 100% Correct Answers • Exam (elaborations)
- API 653 Intro Exam Questions and Answers 100% Pass • Exam (elaborations)
- And more ….
API 653 Bundled Exams Questions and Answers 100% Verified and Updated 2024 | Graded A
API 653 exam prep Closed book ONLY Questions and Answers 100% Pass
API 653 exam prep Closed book ONLY 
Questions and Answers 100% Pass 
API 653 defines a "Storage tank engineer" as: 
A) A registered professional engineer in structural steel fabrication 
B) Person or organization who is knowledgeable and experienced in the engineering 
disciplines associated with evaluating the integrity and reliability of aboveground storage 
tanks 
C) the engineering department of a contractor who makes repairs to aboveground 
storage tanks 
D) A professional engineer who is...
- Exam (elaborations)
- • 57 pages •
API 653 exam prep Closed book ONLY 
Questions and Answers 100% Pass 
API 653 defines a "Storage tank engineer" as: 
A) A registered professional engineer in structural steel fabrication 
B) Person or organization who is knowledgeable and experienced in the engineering 
disciplines associated with evaluating the integrity and reliability of aboveground storage 
tanks 
C) the engineering department of a contractor who makes repairs to aboveground 
storage tanks 
D) A professional engineer who is...
API 653 exam prep - Open Book ONLY Questions and Answers 100% Correct
API 653 exam prep - Open Book ONLY 
Questions and Answers 100% Correct 
*When using the preheat alternative weld method, the temperature shall be checked 
___ to assure the minimum temperature is maintained during welding. 
A) one inch or two times the material thickness whichever is greater, on each side of the 
groove. 
B) two inches or two times the material thickness, whichever is great, on each side of 
the groove 
C) Three inches or three times the material thickness, whichever is greater,...
- Exam (elaborations)
- • 52 pages •
API 653 exam prep - Open Book ONLY 
Questions and Answers 100% Correct 
*When using the preheat alternative weld method, the temperature shall be checked 
___ to assure the minimum temperature is maintained during welding. 
A) one inch or two times the material thickness whichever is greater, on each side of the 
groove. 
B) two inches or two times the material thickness, whichever is great, on each side of 
the groove 
C) Three inches or three times the material thickness, whichever is greater,...
Final Exam 4-40 Questions and Answers 100% Pass
Learn2Serve TABC Final Assessment with 100% Correct Answers
Key Realty Exam Questions + Answers 100% Solved
A lot of the answers were missing
6630 final exam with 100% correct answers 2024
Sport First Aid 5th Edition Exam Questions and Answers 100% Pass