Steam boiler operation Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Steam boiler operation? On this page you'll find 526 study documents about Steam boiler operation.
All 526 results
Sort by
![MN Boiler License Questions With Complete Solutions Graded A+](/docpics/4357823/65b6b833efca4_4357823_121_171.jpeg)
-
MN Boiler License Questions With Complete Solutions Graded A+
- Exam (elaborations) • 37 pages • 2024
-
- $18.99
- 2x sold
- + learn more
MN Boiler License Questions With Complete Solutions Graded A+ 
 
a question 
an answer 
what are the conditions necessary for good combustion? 
a) low sulfur content 
b) Thermal, thermocoupler, tubular 
c) turbulence, temperature, time 3T's 
c) turbulence, temperature, time 3T's 
why is secondary air necessary in hand fired boilers? 
a) Necessary to burn the combustible gases 
b) if primary air should fail 
c) used only if sulfur content is high 
a) Necessary to burn the combustible gases 
when ...
![Nyc high pressure boiler license Exam Questions with Correct Answers](/docpics/4120723/65931e7d15639_4120723_121_171.jpeg)
-
Nyc high pressure boiler license Exam Questions with Correct Answers
- Exam (elaborations) • 22 pages • 2024 Popular
-
Available in package deal
-
- $13.29
- 1x sold
- + learn more
Nyc high pressure boiler license 
Exam Questions with Correct 
Answers 
 
The minimum blowdown for a spring loaded safety valve shall be of what percent of set 
pressure? - Answer-10% 
How is the main steam pressure gages tested? - Answer-With an inspectors gage 
Who is in charge of the code for any plumbing installations? - Answer-The nyc plumbing 
code 
When will anchorage or guides be inspected? - Answer-Annually 
How many brass washout plugs does a miniature boiler have? - Answer-3 brass 
wa...
![Stationary Engineer Questions And Answers](/docpics/63ffc88fb5821_2426775.jpg)
-
Stationary Engineer Questions And Answers
- Exam (elaborations) • 38 pages • 2023
-
- $14.99
- 2x sold
- + learn more
How much clearance from the top of the boiler is needed for a HP boiler that produces 70000 lbs of steam? - Answer- 7 feet 
 
On a gas fired boiler what is the proper gas to air mixture - Answer- 30%-70% and in special arrangements it can be as high as 100% . ANSWER CHAPTER 11 remember% 
 
What is the total hardness in a system that was found to have calcium hardness of 60ppm and magnesium hardness of 18ppm and carbon hardness of 12 ppm? - Answer- TH=(Ca x 2.5) + (Mg x 4.1)nTH=(60 x 2.5) + (18...
![Stationary Engineer Exam Questions with 100% Correct Answers](/docpics/3386876/64f8ca367e735_3386876_121_171.jpeg)
-
Stationary Engineer Exam Questions with 100% Correct Answers
- Exam (elaborations) • 40 pages • 2023
- Available in package deal
-
- $13.49
- 1x sold
- + learn more
How much clearance from the top of the boiler is needed for a HP boiler that produces 70000 lbs of steam? Correct Answer 7 feet 
 
On a gas fired boiler what is the proper gas to air mixture Correct Answer 30%-70% and in special arrangements it can be as high as 100% . ANSWER CHAPTER 11 remember% 
 
What is the total hardness in a system that was found to have calcium hardness of 60ppm and magnesium hardness of 18ppm and carbon hardness of 12 ppm? Correct Answer TH=(Ca x 2.5) + (Mg x 4.1)nTH=(...
![Oil Burner License Exam 2023 Questions and Answers](/docpics/2820101/64749f081e4bf_2820101_121_171.jpeg)
-
Oil Burner License Exam 2023 Questions and Answers
- Exam (elaborations) • 18 pages • 2023
-
Available in package deal
-
- $12.49
- 3x sold
- + learn more
What is the first thing a tech should do when arriving at a no combustion call? - Answer- Ask how many times the customer reset the unit. 
 
What is the best long term solution for preventing a clogged nozzle? - Answer- -Remove any underground storage tanks. 
-Install a quality oil filter. 
-Cut the suction line 10" above the tank outlet to prevent sludge. 
 
Hot water and steam valves are interchangeable. - Answer- False 
 
When in the presence of a flame, a cad cell normally reads.. - Answe...
![Oil burner License Study Guide (Massachusetts) Questions and Answers](/docpics/2819846/647495cab5e8c_2819846_121_171.jpeg)
-
Oil burner License Study Guide (Massachusetts) Questions and Answers
- Exam (elaborations) • 6 pages • 2023
-
Available in package deal
-
- $10.49
- 2x sold
- + learn more
What are the 3 funtions of an Oil Burner nozzle? - Answer- Atomize, Meter, Patter. 
 
What are the 2 voltage circuits of a primary control? - Answer- Line & Low. 
 
What is the function of a fuse? - Answer- Protect circuit. 
 
What is the High Limit cut out? - Answer- Max safe Temp or Pressure setting. 
 
What is the High Limit cut in? - Answer- Cut out minus Differential. 
 
What is the "Max" Lockout time for a burner with a 3 GPH Flow Rate? - Answer- 45 Seconds. 
 
What is the minimum stack ...
![CH12 Steam Boiler Operation Questions and Answers;(perfect guide for your final)](/docpics/3235249/64d740472ea6b_3235249_121_171.jpeg)
-
CH12 Steam Boiler Operation Questions and Answers;(perfect guide for your final)
- Exam (elaborations) • 4 pages • 2023
- Available in package deal
-
- $2.99
- + learn more
water level on all boilers - When taking over a shift, the boiler operator must first check the _______. 
securing the feed water and allowing the water level in the boiler to drop - The low-water fuel cutoff 
can be tested by blowing down the low-water fuel cutoff or by _____. 
warmed up slowly - In order to prevent uneven expansion of the boiler on cold startup, the boiler 
must be _____. 
15 psi - During startup, the boiler vent should remain open until a pressure of approximately 
_______ is...
![CH12 Steam Boiler Operation Exam Questions And Answers](/docpics/3118409/64be13ab7376d_3118409_121_171.jpeg)
-
CH12 Steam Boiler Operation Exam Questions And Answers
- Exam (elaborations) • 3 pages • 2023
- Available in package deal
-
- $9.99
- + learn more
CH12 Steam Boiler Operation Exam Questions And Answers...
![MD Stationary Engineer Exam Questions with All Correct Answers](/docpics/2734704/645d820d146b6_2734704_121_171.jpeg)
-
MD Stationary Engineer Exam Questions with All Correct Answers
- Exam (elaborations) • 4 pages • 2023
-
Available in package deal
-
- $11.99
- 1x sold
- + learn more
MD Stationary Engineer Exam Questions with All Correct Answers 
Gases of Combustion that cool on Contact with the boiler heating Surface before combushion is completed Cause a(n) _________ - ANSWER Formation of soot and smoke 
 
In the event of a flame failure, the programmer will______ - ANSWER Secure the fuel, purge the firebox, and then shut down 
 
Boil the water must be conditioned to prevent ______ (3 Answers) - ANSWER Formation of scale, oxygen pitt...
![High Pressure Boiler: Chapter 12- Steam Boiler Operation | Questions with 100 % correct answers | Verified](/docpics/3235261/64d740fa06108_3235261_121_171.jpeg)
-
High Pressure Boiler: Chapter 12- Steam Boiler Operation | Questions with 100 % correct answers | Verified
- Exam (elaborations) • 3 pages • 2023
- Available in package deal
-
- $2.99
- + learn more
When taking over a shift, the boiler operator must first check the ___. - water level on all boilers 
The low-water fuel cutoff can be tested by blowing down the low-water fuel cutoff or by ___. - 
securing the feedwater and allowing the water level in the boiler to drop 
In order to prevent uneven expansion of the boiler on cold startup, the boiler must be ___. - warmed 
up slowly 
During start up, the boiler vent should remain open until a pressure of ___ is reached. - 15 psi 
A safety valve c...
![Verkoop je kennis op stuvia](https://www.stuvia.com/hosted-imgs/app/stock-fotos/banner_seller_big.jpg)
How much did you already spend on Stuvia? Imagine there are plenty more of you out there paying for study notes, but this time YOU are the seller. Ka-ching! Discover all about earning on Stuvia