CSI CDT Exam Study Guide (questions and answers) 100% solved
- Examen • 15 páginas • 2024
-
- $14.99
- + aprende más y mejor
CSI CDT Exam Study Guide (questions 
and answers) 100% solved 
Owner - CORRECT ANSWER-Principle stakeholder - initiates project, assumes risk, 
provides funding 
AHJ - Authorities Having Jurisdiction - CORRECT ANSWER-Protect public health, 
safety and welfare 
Design Team - CORRECT ANSWER-Address planning issues, determine design 
program, identify codes and regulations, produce procurement and construction 
documents, administer construction contract, *provide QA/QC procedures* 
Contractor...
-
CSI CDT Exam Questions With Correct Answers 100% Solved
- Examen • 15 páginas • 2024
-
- $12.49
- + aprende más y mejor
CSI CDT Exam Questions With Correct 
Answers 100% Solved 
Owner - answerPrinciple stakeholder - initiates project, assumes risk, provides funding 
AHJ - Authorities Having Jurisdiction - answerProtect public health, safety and welfare 
Design Team - answerAddress planning issues, determine design program, identify codes 
and regulations, produce procurement and construction documents, administer construction 
contract, *provide QA/QC procedures* 
Contractor Team - answerEntity that constructs a ...
-
Plumbing Exam Q&A
- Examen • 29 páginas • 2023
-
Disponible en paquete
-
- $12.59
- + aprende más y mejor
Which backflow preventer is not a testable device? 
a. PVB 
b. DCAP 
c. RP 
d. DCVA - Answer- B 
 
A flat roof measuring 20m by 26m with a horizontal wall on one side extended up 6m by 20m. Size the circular rain water leader if the local 15 minute rain fall intensity is 24mm? 
a. 2 
b. 7 
c. 9 
d. 6 - Answer- D 
 
This type of trap is not permitted in a drainage system? 
a. S trap standard 
b. bell trap 
c. P trap 
d. drum trap - Answer- B 
 
This is not an approved method for joining cast iro...
-
CSI CDT Exam Questions With Correct Answers 100% Solved
- Examen • 15 páginas • 2024
-
- $12.49
- + aprende más y mejor
CSI CDT Exam Questions With Correct 
Answers 100% Solved 
Owner - answerPrinciple stakeholder - initiates project, assumes risk, provides funding 
AHJ - Authorities Having Jurisdiction - answerProtect public health, safety and welfare 
Design Team - answerAddress planning issues, determine design program, identify codes 
and regulations, produce procurement and construction documents, administer construction 
contract, *provide QA/QC procedures* 
Contractor Team - answerEntity that constructs a ...
-
CDT Exam Questions With 100% Correct Answers 2024
- Examen • 10 páginas • 2024
- Disponible en paquete
-
- $12.49
- + aprende más y mejor
CDT Exam Questions With 100% Correct 
Answers 2024 
Who is part of the project team? - answerOwner, Designer, Contractor, Supplier 
Responsibilities of the Owner - answerinitiates project and assumes risk 
Responsibilities of the Designer - answerplanning, reflects owner's vision, codes and 
regulations, construction documents, contract, QA/QC 
Responsibilities of the Contractor - answerestimates cost, time, manages construction 
Responsibilities of the Supplier - answerproduce equipment, produ...
Y así es como ganas dinero extra
-
PLUMBING (FIRST EXAM) – Q&A
- Examen • 2 páginas • 2023
- Disponible en paquete
-
- $8.49
- + aprende más y mejor
PLUMBING (FIRST EXAM) – Q&A
-
Plumbing Exam 4 Q&A
- Examen • 4 páginas • 2023
-
Disponible en paquete
-
- $10.49
- + aprende más y mejor
Galvanized steel vent pipes used for drains, wast or vents shall _________. - Answer- be maintained at least 6 inches above grade 
 
Galvanized steel vent pipes with galvanized steel fittings shall be kept above ground at least _____. - Answer- 6 inches 
 
Which of the following combinations of vent pipes is adequate for a 4" drain? - Answer- Ten 1 1/4" 
 
Which of the following combinations of vent pipes will provide the minimum aggregate cross-sectional vent area of one 4" building drain? -...
-
AIC MOCK EXAM | QUESTIONS & ANSWERS (VERIFIED) | LATEST UPDATE | GRADED A+
- Examen • 38 páginas • 2024
- Disponible en paquete
-
- $15.49
- + aprende más y mejor
1 
AIC MOCK EXAM | QUESTIONS & 
ANSWERS (VERIFIED) | LATEST UPDATE | 
GRADED A+ 
What information is used to determine the required contact area of a reinforced 
concrete footing resting in soil? 
Correct Answer: Soil Bearing Capacity 
What is the following a definition of? 
"Reducing the duration of a project of a project usually by overlapping phases or 
activities that were originally planned to be done sequentially." 
Correct Answer: Fast- Tracking 
Which of the following terms refer...