300 630 exam Guides d'étude, Notes de cours & Résumés

Vous recherchez les meilleurs guides d'étude, notes d'étude et résumés sur 300 630 exam ? Sur cette page, vous trouverez 86 documents pour vous aider à réviser pour 300 630 exam.

All 86 résultats

Trier par

FAC2246 October Exam (DETAILED ANSWERS) 2023 FAC2246 October Exam (DETAILED ANSWERS) 2023 Très apprécié
  • FAC2246 October Exam (DETAILED ANSWERS) 2023

  • Examen • 19 pages • 2023
  • FAC2246 October Exam (DETAILED ANSWERS) 2023 100% TRUSTED workings, explanations and solutions. For assistance call or us on +/ 2/ 5/ 4 /7 /7 /9 /5 /4 /0 /1 /3 /2 . Question 1 (20 Marks) The partnership agreement of Madi-Maxi Traders provided for the following: Balances on 1 March 20.19: Capital: Madi R 125 000 Maxi R 85 000 Current Account: Madi R 24 000 Maxi R 8 000 (debit) Net profit for the period: R 366 000 Transactions during the year, not included in profit: 1. Madi wi...
    (0)
  • $2.71
  • 1x vendu
  • + en savoir plus
Mechanics Exam Review-NEIEP Comprehensive Questions With 100%Correct Answers.
  • Mechanics Exam Review-NEIEP Comprehensive Questions With 100%Correct Answers.

  • Examen • 19 pages • 2024
  • Mechanics Exam Review-NEIEP Comprehensive Questions With 100%Correct Answers. A contractor wants to raise the car speed from 100 fpm to 125 fpm, it currently has a 12" sheave. What is required? - ANSWER-100 fpm/125 fpm= 12"/ X =15 A MOV (Metal Oxide Varistor) burns out. You replace it, but cannot read voltage or resistance. What should you do? - ANSWER-Replace it with a larger MOV - 630 On a Ward-Leonard circuit the brake is set, but the motor is trying to slip through the brake. What is...
    (0)
  • $12.99
  • + en savoir plus
Mechanics Exam Review-NEIEP Comprehensive Questions With 100%Correct Answers.
  • Mechanics Exam Review-NEIEP Comprehensive Questions With 100%Correct Answers.

  • Examen • 19 pages • 2024
  • Mechanics Exam Review-NEIEP Comprehensive Questions With 100%Correct Answers. A contractor wants to raise the car speed from 100 fpm to 125 fpm, it currently has a 12" sheave. What is required? - ANSWER-100 fpm/125 fpm= 12"/ X =15 A MOV (Metal Oxide Varistor) burns out. You replace it, but cannot read voltage or resistance. What should you do? - ANSWER-Replace it with a larger MOV - 630 On a Ward-Leonard circuit the brake is set, but the motor is trying to slip through the brake. What is...
    (0)
  • $11.99
  • + en savoir plus
Mechanics Exam Review-NEIEP Comprehensive Questions With 100%Correct Answers.
  • Mechanics Exam Review-NEIEP Comprehensive Questions With 100%Correct Answers.

  • Examen • 19 pages • 2024
  • Mechanics Exam Review-NEIEP Comprehensive Questions With 100%Correct Answers. A contractor wants to raise the car speed from 100 fpm to 125 fpm, it currently has a 12" sheave. What is required? - ANSWER-100 fpm/125 fpm= 12"/ X =15 A MOV (Metal Oxide Varistor) burns out. You replace it, but cannot read voltage or resistance. What should you do? - ANSWER-Replace it with a larger MOV - 630 On a Ward-Leonard circuit the brake is set, but the motor is trying to slip through the brake. What is...
    (0)
  • $12.99
  • + en savoir plus
FAC2601 EXAM PACK 2022
  • FAC2601 EXAM PACK 2022

  • Examen • 123 pages • 2022
  • FAC2601 EXAM PACK 2022 FAC2601 - Financial Accounting And Reporting The following information regarding share capital in the accounting records of Mbaso Ltd was obtained on 28 February 2021: R Ordinary share capital at date of incorporation................................................................... 5 000 000 Proceeds on 800 000 ordinary shares issued – 31 August 2020 ....................................... 1 200 000 20 000 10% Cumulative preference shares ..........................
    (0)
  • $3.50
  • 1x vendu
  • + en savoir plus
P370 FINAL EXAM!! Complete Questions with Correct Answers
  • P370 FINAL EXAM!! Complete Questions with Correct Answers

  • Examen • 6 pages • 2024
  • P370 FINAL EXAM!! Converting quarterly and annual business plans into broad output and labor requirements for the intermediate term is known as: Master production scheduling. Aggregate planning Master production scheduling. Rough-cut capacity planning. Materials requirements planning. Capacity requirements planning. Aggregate planning Which of the following is NOT a method used in aggregate planning to cope with fluctuations in demand? Backordering demand in peak periods Building ...
    (0)
  • $10.59
  • + en savoir plus
FIN2226N Exam Assignment (DETAILED ANSWERS) 2023 FIN2226N Exam Assignment (DETAILED ANSWERS) 2023
  • FIN2226N Exam Assignment (DETAILED ANSWERS) 2023

  • Examen • 19 pages • 2023
  • FIN2226N Exam Assignment (DETAILED ANSWERS) 2023 100% TRUSTED workings, explanations and solutions. For assistance call or us on +/ 2/ 5/ 4 /7 /7 /9 /5 /4 /0 /1 /3 /2 . Question 1 (20 Marks) The partnership agreement of Madi-Maxi Traders provided for the following: Balances on 1 March 20.19: Capital: Madi R 125 000 Maxi R 85 000 Current Account: Madi R 24 000 Maxi R 8 000 (debit) Net profit for the period: R 366 000 Transactions during the year, not included in profit: 1. Mad...
    (0)
  • $2.71
  • + en savoir plus
FIN2112 Application based assignment for the October Exam Cycle (DETAILED ANSWERS) 2023
  • FIN2112 Application based assignment for the October Exam Cycle (DETAILED ANSWERS) 2023

  • Examen • 19 pages • 2023
  • FIN2112 Application based assignment for the October Exam Cycle (DETAILED ANSWERS) 2023 100% TRUSTED workings, explanations and solutions. For assistance call or us on +/ 2/ 5/ 4 /7 /7 /9 /5 /4 /0 /1 /3 /2 . Question 1 (20 Marks) The partnership agreement of Madi-Maxi Traders provided for the following: Balances on 1 March 20.19: Capital: Madi R 125 000 Maxi R 85 000 Current Account: Madi R 24 000 Maxi R 8 000 (debit) Net profit for the period: R 366 000 Transactions during the...
    (0)
  • $2.71
  • + en savoir plus
P370 FINAL EXAM!!
  • P370 FINAL EXAM!!

  • Examen • 6 pages • 2024
  • Disponible en pack
  • P370 FINAL EXAM!! Converting quarterly and annual business plans into broad output and labor requirements for the intermediate term is known as: Master production scheduling. Aggregate planning Master production scheduling. Rough-cut capacity planning. Materials requirements planning. Capacity requirements planning. Aggregate planning Which of the following is NOT a method used in aggregate planning to cope with fluctuations in demand? Backordering demand in peak periods Building ...
    (0)
  • $9.69
  • + en savoir plus
P370 FINAL EXAM!! Completed with A+ Graded Answers Latest Update
  • P370 FINAL EXAM!! Completed with A+ Graded Answers Latest Update

  • Examen • 6 pages • 2024
  • P370 FINAL EXAM!! Converting quarterly and annual business plans into broad output and labor requirements for the intermediate term is known as: Master production scheduling. Aggregate planning Master production scheduling. Rough-cut capacity planning. Materials requirements planning. Capacity requirements planning. Aggregate planning Which of the following is NOT a method used in aggregate planning to cope with fluctuations in demand? Backordering demand in peak periods Building ...
    (0)
  • $9.69
  • + en savoir plus