FAC2246 October Exam (DETAILED ANSWERS) 2023
- Examen • 19 pages • 2023
-
- $2.71
- 1x vendu
- + en savoir plus
FAC2246 October Exam (DETAILED ANSWERS) 2023 100% TRUSTED workings, explanations and solutions. For assistance call or us on +/ 2/ 5/ 4 /7 /7 /9 /5 /4 /0 /1 /3 /2 . 
Question 1 (20 Marks) 
The partnership agreement of Madi-Maxi Traders provided for the following: 
Balances on 1 March 20.19: 
Capital: Madi R 125 000 
Maxi R 85 000 
Current Account: Madi R 24 000 
Maxi R 8 000 (debit) 
Net profit for the period: R 366 000 
Transactions during the year, not included in profit: 
1. Madi wi...
-
Mechanics Exam Review-NEIEP Comprehensive Questions With 100%Correct Answers.
- Examen • 19 pages • 2024
-
- $12.99
- + en savoir plus
Mechanics Exam Review-NEIEP Comprehensive Questions With 100%Correct Answers. 
A contractor wants to raise the car speed from 100 fpm to 125 fpm, it currently has a 12" 
sheave. What is required? - ANSWER-100 fpm/125 fpm= 12"/ X =15 
A MOV (Metal Oxide Varistor) burns out. You replace it, but cannot read voltage or 
resistance. What should you do? - ANSWER-Replace it with a larger MOV - 630 
On a Ward-Leonard circuit the brake is set, but the motor is trying to slip through the 
brake. What is...
-
Mechanics Exam Review-NEIEP Comprehensive Questions With 100%Correct Answers.
- Examen • 19 pages • 2024
-
- $11.99
- + en savoir plus
Mechanics Exam Review-NEIEP Comprehensive Questions With 100%Correct Answers. 
A contractor wants to raise the car speed from 100 fpm to 125 fpm, it currently has a 12" 
sheave. What is required? - ANSWER-100 fpm/125 fpm= 12"/ X =15 
A MOV (Metal Oxide Varistor) burns out. You replace it, but cannot read voltage or 
resistance. What should you do? - ANSWER-Replace it with a larger MOV - 630 
On a Ward-Leonard circuit the brake is set, but the motor is trying to slip through the 
brake. What is...
-
Mechanics Exam Review-NEIEP Comprehensive Questions With 100%Correct Answers.
- Examen • 19 pages • 2024
-
- $12.99
- + en savoir plus
Mechanics Exam Review-NEIEP Comprehensive Questions With 100%Correct Answers. 
A contractor wants to raise the car speed from 100 fpm to 125 fpm, it currently has a 12" 
sheave. What is required? - ANSWER-100 fpm/125 fpm= 12"/ X =15 
A MOV (Metal Oxide Varistor) burns out. You replace it, but cannot read voltage or 
resistance. What should you do? - ANSWER-Replace it with a larger MOV - 630 
On a Ward-Leonard circuit the brake is set, but the motor is trying to slip through the 
brake. What is...
-
FAC2601 EXAM PACK 2022
- Examen • 123 pages • 2022
-
- $3.50
- 1x vendu
- + en savoir plus
FAC2601 EXAM PACK 2022 
FAC2601 - Financial Accounting And Reporting 
The following information regarding share capital in the accounting records of Mbaso Ltd was obtained 
on 28 February 2021: 
R 
Ordinary share capital at date of incorporation................................................................... 5 000 000 
Proceeds on 800 000 ordinary shares issued – 31 August 2020 ....................................... 1 200 000 
20 000 10% Cumulative preference shares ..........................
Trop de mois restant à la fin de l'argent ?
-
P370 FINAL EXAM!! Complete Questions with Correct Answers
- Examen • 6 pages • 2024
-
Disponible en pack
-
- $10.59
- + en savoir plus
P370 FINAL EXAM!! 
Converting quarterly and annual business plans into broad output and labor requirements for the intermediate term is known as: 
Master production scheduling. 
Aggregate planning 
Master production scheduling. 
Rough-cut capacity planning. 
Materials requirements planning. 
Capacity requirements planning. 
Aggregate planning 
 
 
Which of the following is NOT a method used in aggregate planning to cope with fluctuations in demand? 
Backordering demand in peak periods 
Building ...
-
FIN2226N Exam Assignment (DETAILED ANSWERS) 2023
- Examen • 19 pages • 2023
-
- $2.71
- + en savoir plus
FIN2226N Exam Assignment (DETAILED ANSWERS) 2023 100% TRUSTED workings, explanations and solutions. For assistance call or us on +/ 2/ 5/ 4 /7 /7 /9 /5 /4 /0 /1 /3 /2 . 
Question 1 (20 Marks) 
The partnership agreement of Madi-Maxi Traders provided for the following: 
Balances on 1 March 20.19: 
Capital: Madi R 125 000 
Maxi R 85 000 
Current Account: Madi R 24 000 
Maxi R 8 000 (debit) 
Net profit for the period: R 366 000 
Transactions during the year, not included in profit: 
1. Mad...
-
FIN2112 Application based assignment for the October Exam Cycle (DETAILED ANSWERS) 2023
- Examen • 19 pages • 2023
-
- $2.71
- + en savoir plus
FIN2112 Application based assignment for the October Exam Cycle (DETAILED ANSWERS) 2023 100% TRUSTED workings, explanations and solutions. For assistance call or us on +/ 2/ 5/ 4 /7 /7 /9 /5 /4 /0 /1 /3 /2 . 
Question 1 (20 Marks) 
The partnership agreement of Madi-Maxi Traders provided for the following: 
Balances on 1 March 20.19: 
Capital: Madi R 125 000 
Maxi R 85 000 
Current Account: Madi R 24 000 
Maxi R 8 000 (debit) 
Net profit for the period: R 366 000 
Transactions during the...
-
P370 FINAL EXAM!!
- Examen • 6 pages • 2024
- Disponible en pack
-
- $9.69
- + en savoir plus
P370 FINAL EXAM!! 
Converting quarterly and annual business plans into broad output and labor requirements for the intermediate term is known as: 
Master production scheduling. 
Aggregate planning 
Master production scheduling. 
Rough-cut capacity planning. 
Materials requirements planning. 
Capacity requirements planning. 
Aggregate planning 
 
 
Which of the following is NOT a method used in aggregate planning to cope with fluctuations in demand? 
Backordering demand in peak periods 
Building ...
-
P370 FINAL EXAM!! Completed with A+ Graded Answers Latest Update
- Examen • 6 pages • 2024
-
Disponible en pack
-
- $9.69
- + en savoir plus
P370 FINAL EXAM!! 
Converting quarterly and annual business plans into broad output and labor requirements for the intermediate term is known as: 
Master production scheduling. 
Aggregate planning 
Master production scheduling. 
Rough-cut capacity planning. 
Materials requirements planning. 
Capacity requirements planning. 
Aggregate planning 
 
 
Which of the following is NOT a method used in aggregate planning to cope with fluctuations in demand? 
Backordering demand in peak periods 
Building ...