100% tevredenheidsgarantie Direct beschikbaar na je betaling Online lezen of als PDF Geen vaste maandelijkse kosten 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

3B2 ABSA already passed

Beoordeling
-
Verkocht
-
Pagina's
29
Cijfer
A+
Geüpload op
10-11-2025
Geschreven in
2025/2026

3B2 ABSA already passed

Instelling
3B2 ABSA A
Vak
3B2 ABSA a

Voorbeeld van de inhoud

3B2 ABSA already passed
A dummy piston is used on a steam turbine to: - =Counter end thrust


The entrance angle of a reaction blade is: - =Almost 90 degrees


To ensure a tight seal, a steam turbine balance piston is fitted with _____. - =Labyrinth seals


Extraction turbines are turbines where steam is extracted at one or more points at constant: -
=Pressure


In a steam turbine having pressure drop across the moving blades, an unbalanced _____ thrust
will be developed upon the rotor. - =Axial


All large disc rotors are machined from __________ steel: - =A solid forging of nickel steel.


Convergent-divergent nozzles are used when: - =High pressure drops are required


During start up of a steam turbine the thrust block is pushed against a stop in the direction of the
exhaust for: - =Maximum blade clearance


In a steam turbine using velocity compounding _____ expand(s) the steam from initial to exhaust
pressure. - =One set of nozzles


A thrust adjusting gear: - =Positions the turbine rotor axially


A hollow drum rotor of a steam turbine is machined both outside and inside. How is the drum
end cover with shaft installed in the rotor? - =Shrink fitted and welded


Steam turbine casing joints are made steam tight by matching _____ exactly. - =Flange faces

,A back-pressure turbine with exhaust steam going to an old boiler header that is supplying steam
to an old lower pressure turbine is called a: - =Topping turbine


A reaction turbine has: - =Rows of stationary blades alternating with rows of moving blades


When disc rotors are assembled, the discs are heated until they are easily slid along the shaft and
then located in the correct position on the shaft and shaft key. A small clearance between the
discs prevents: - =Thermal stress in the shaft


The purpose of compounding in a steam turbine is to: - =Reduce steam and blade velocity


On larger turbines the _____ is split in a horizontal direction. - =Cylinder


The pressure at the outlet from the moving blades is the same as the pressure at the inlet to the
moving blades in a/an __________ turbine. - =Impulse


In a condensing-bleeder turbine up to 2% of the total steam flow may be bled off. What is the
bleed-steam used for? - =Feed-water heating


It is general practice to let the thickness of the walls and flanges _____ from inlet to exhaust end
of a steam turbine casing: - =Decrease


A water seal is used on some steam turbines ________ to insure that no air leaks in along the
shaft: - =At speeds above 2000 rev/mm


If a turbine is shut down and left at a standstill while still hot, the lower half of the rotor will cool
faster than the upper half. The rotor will "hog", which means it will ___________. - =Bend
upwards


The warm-up time required of a turbine is dependant on: - =The size of the turbine

, The advantage of mechanical-hydraulic governors is: - =Mechanical losses are greatly reduced


In order to supply oil at two different pressures, a typical turbine lube oil system has: - =A
pressure reducing valve


Overspeed trips: - =Are independent of the governing system


In a back-pressure turbine the governor is _____ sensitive. - =Pressure


On startup of a large condensing turbine, the cooling water to the oil cooler is turned on: -
=When the oil reaches normal operating temperatures


In an overspeed trip the spring loaded tripping bolt has a center of gravity: - =Towards the head
end of the bolt


Turbines used to drive auxiliary equipment are usually lubricated by: - =Ring-oiled bearings


A mechanical overspeed trip is designed to _____ in the event of an overspeed condition. - =Shut
off the turbine's steam supply


When starting an extraction turbine, sealing steam to the turbine glands is admitted _____ is put
in operation - =After the extraction pump


The barring gear: - =Should disengage and automatically shut down after steam starts to rotate
the turbine


Sealing steam to the turbine glands is admitted _____ is put in operation - =After the extraction
pump


In a turbine circuit, feed heaters and deaerators serve to: - =Increase efficiency

Geschreven voor

Instelling
3B2 ABSA a
Vak
3B2 ABSA a

Documentinformatie

Geüpload op
10 november 2025
Aantal pagina's
29
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

€8,90
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Online lezen of als PDF
Geen vaste maandelijkse kosten

Maak kennis met de verkoper
Seller avatar
hurryben
3,0
(1)

Maak kennis met de verkoper

Seller avatar
hurryben Harvard University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
12
Lid sinds
2 jaar
Aantal volgers
5
Documenten
1808
Laatst verkocht
11 maanden geleden

3,0

1 beoordelingen

5
0
4
0
3
1
2
0
1
0

Populaire documenten

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen