Well-blasted rock has a swell percentage of: (Principles and Practices of Commercial Construction -- Earthwork) - ANSWER20% Lifelines in areas subjected to cutting or abrasion shall be a minimum of ______ inch wire core manila rope (OSHA) - ANSWER7/8 All excavations made in Type B soil 20 feet or less in depth which have vertically sided lower portions shall be shielded or supported to a height _____ inches above the top of the vertical side (OSHA) - ANSWERAt least 18 inches The calculated fire-resistance rating for a 3.8 inch thick sand and light weight aggregate precast concrete wall shall be _______ hour(s). (Florida Building Code -- Calculated Fire Resistance) - ANSWER2 hours Welded splices are almost always necessary in_______. (Reinforcing Bars -- Welding) - ANSWERPrecast Concrete Construction 6. The OSHA area office has a maximum of ____ days to assess the penalty for failure to abate a violation.

Meer zien Lees minder
Instelling
Florida GC
Vak
Florida GC

Voorbeeld van de inhoud

Florida GC Exam - Project Management
Section(100% Correct)

Well-blasted rock has a swell percentage of:

(Principles and Practices of Commercial Construction --> Earthwork) - ANSWER20%

Lifelines in areas subjected to cutting or abrasion shall be a minimum of ______ inch wire core
manila rope

(OSHA) - ANSWER7/8

All excavations made in Type B soil 20 feet or less in depth which have vertically sided lower portions
shall be shielded or supported to a height _____ inches above the top of the vertical side

(OSHA) - ANSWERAt least 18 inches

The calculated fire-resistance rating for a 3.8 inch thick sand and light weight aggregate precast
concrete wall shall be _______ hour(s).

(Florida Building Code --> Calculated Fire Resistance) - ANSWER2 hours

Welded splices are almost always necessary in_______.

(Reinforcing Bars --> Welding) - ANSWERPrecast Concrete Construction

6. The OSHA area office has a maximum of ____ days to assess the penalty for failure to abate a
violation.

(Florida Contractors Manual --> Categories of Violations) - ANSWER30 Days

7. High-density R-30 batts used in cathedral ceilings are_____ inches thick.

(Energy Efficient Building Construction --> Cathedral Ceilings) - ANSWER8 - 1/4

8. According to ASTM C94, when truck mixers are used the load must be completely discharged
within______ after batching.

(Design and Control of Concrete Mixtures --> Mixing Concrete) - ANSWER90 Minutes

9. Floor landings in stairways shall be installed at intervals not to exceed_______.

(Florida Building Code --> Stairway Construction, Landings) - ANSWER12' Vertically

10. The thickness of concrete floor slabs supported directly on the ground shall not be less than____
inches.

(Florida Building Code --> Concrete, Slab, Minimum) - ANSWER3 - 1/2

11. In _______ , the tendons are raised higher above the forms in the vicinity of the supporting
column than at the midspan of the slab.

, (Principles and Practices of Commercial Construction --> Tendon, Post Tensioning) - ANSWERPost-
tensioned Concrete Slabs

12. The maximum permissible slope for access aisles serving accessible parking spaces shall not be
greater than_______.

(Accessibility) - ANSWER1:48

13. Excavations located five feet or less from the lot line during the renovation of an existing building,
shall be enclosed with a barrier not less than____ feet high.

(Florida Building Code --> Barriers, Protection) - ANSWER6'

14. The preliminary site investigation is usually done _______.

(Principles and Practices of Commercial Construction --> Preliminary Investigation) - ANSWERIn two
stages

15. Where permitted, spiral stairways shall be constructed in such a way that the risers shall be
sufficient to provide a headroom of _____ minimum.

(Florida Building Code --> Spiral Stairs, Construction) - ANSWER6' - 6"

16. Whenever materials are dropped________ to any point outside the exterior walls of the building,
an enclosed chute shall be used.

(OSHA --> Chutes) - ANSWERMore than 20'

17. Automatic sprinkler systems in residential structures up to and including four stories in height
shall be permitted to be installed in accordance with ______.

(Florida Building Code --> Automatic Sprinkler Systems) - ANSWERNFPA 13-47R

18. Masonry cements consist of portland cement together with other materials to enhance all of the
following except ______.

(Design and Control of Concrete Mixtures --> Masonry Cement) - ANSWERAir-Entrainment

19. In steel frame construction, cross-bracing loads are typically_______.

(Principles and Practices of Commercial Construction --> Cross Bracing, Structural Steel) - ANSWERIn
Tension

20. Barricades for protection of employees shall conform to_______.

(OSHA --> Barricades) - ANSWERThe Manual on Uniform Traffic Control Devices

21. The minimum dimensions for a crawl space access opening in a building shall be not less than
_____ inches.

(Florida Building Code --> Crawl Space, Access) - ANSWER18" x 24"

22. A _____ truss develops movement at its bearing points when under load.

(Walker's Building Estimator's Reference Book --> Trusses, Wood Roof) - ANSWERScissor

23. When gypsum materials are being mixed or used for joint treatment or laminating, the room
temperature shall be maintained at not less than 500 F for not less than ______ hours before use.

Geschreven voor

Instelling
Florida GC
Vak
Florida GC

Documentinformatie

Geüpload op
16 oktober 2024
Aantal pagina's
8
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

€13,82
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kan je een ander document kiezen. Je kan het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Papersbylee Chowan University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
22
Lid sinds
2 jaar
Aantal volgers
14
Documenten
1264
Laatst verkocht
6 maanden geleden

3,3

7 beoordelingen

5
1
4
1
3
4
2
1
1
0

Populaire documenten

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen