BUsiness continuity plan with 100% Verification
What provide the foundation for the BCP - ANSWER-The risk assessment and BIA What should testing scenarios be designed using - ANSWER-Events identified in a risk assessment Orientation testing - ANSWER-Provides overview of plan to motivate and familiarize people with their role Functional testing - ANSWER-Simulates a scenario as realistically as possible in a controlled environment (short of moving personnel, equipment and resources to an actual site) Tabletop testing - ANSWER-Presents limited simulation of a scenario (narrative format) Full scale testing - ANSWER-Deploys personnel, equipment and resources. Full on simulation Facilitator - ANSWER-Lead controller - supervises the exercise Controller - ANSWER-Introduces artificial stimuli at the direction of the facilitator Simulator - ANSWER-Adds realism to the scenario. Portrays private citizens, companies, agencies. Acts as a victim adversary, media member Observer - ANSWER-Strategically positioned to observe and document performance
Geschreven voor
- Instelling
- BUsiness continuity plan
- Vak
- BUsiness continuity plan
Documentinformatie
- Geüpload op
- 3 februari 2024
- Aantal pagina's
- 4
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
business continuity plan with 100 verification
-
business continuity plan with 100 verification st
-
what provide the foundation for the bcp
Ook beschikbaar in voordeelbundel