NOTES FOR CH 17 INTRO TO PROJECT MANAGEMENT

Instelling
Vak

Voorbeeld van de inhoud

INTRO TO PROJECT MANAGEMENT CH 17
Saturday, January 23, 2021 6:10 PM



- Project planning
- Work breakdown structure
- Gantt chart
- PERT CPN methods
§ Determinisic durations
§ Probabilistic durations
§ Path probabilities
- Project crashing




PROJECT
- A series of related jobs or tasks focused on the completion of an overall
objective
- All projects are expected to achieve the following project performance
goals:
• to be completed within time/schedule, cost/budget, and
quality/scope guidelines.
• To accomplish this
® projects must be authorized,
® their objectives and scope must be established,
® a project manager should be appointed, and the
project must be planned
- Projects do not involve routine operations that are performed repeatedly

PROGRAM MANAGEMENT
- Planning, directing and coordinating resources to meet the
technical requirements cost and time constraints of the project
- Project management triange:
• Cost/budget/ time schedule\ quality scope _ =
perforable objectives
- Project management differs from management of more traditional
operations in that it is more limited with the time frame of projects

PROGRAM

, - Project management triange:
• Cost/budget/ time schedule\ quality scope _ =
perforable objectives
- Project management differs from management of more traditional
operations in that it is more limited with the time frame of projects

PROGRAM
- A long term goal (project) which may involve several smaller
projects
► Ex) university's research
program, nasa's space
program, etc..




PROJECT PHASES
- Projects go through a life cycle or a series of project phases which
include:

1. Project initiation:
- Starts with the description of the project and
scope
► Ex) computer aided
evaluation system
► Fleet and inventory tracking
systems,etc..
- We define
→ Key resources
→ Budget requirements (+/- 30%)
→ Time consideration
→ Feasibility / worthiness with respect to
time

- Project portfolio selection
→ Detailed product definition
→ Scope *the work that needs to be
accomplished to deliver a good or
service / the specified objective
→ Threats / challenges

Geschreven voor

Instelling
Studie
Vak

Documentinformatie

Geüpload op
5 november 2022
Aantal pagina's
15
Geschreven in
2019/2020
Type
SAMENVATTING

Onderwerpen

€7,63
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten

Maak kennis met de verkoper
Seller avatar
chiicago09

Maak kennis met de verkoper

Seller avatar
chiicago09 CONCORDIA UNIVERSITY
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
2
Lid sinds
3 jaar
Aantal volgers
1
Documenten
8
Laatst verkocht
3 jaar geleden

0,0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Populaire documenten

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen