Crane Guides d'étude, Notes de cours & Résumés
Vous recherchez les meilleurs guides d'étude, notes d'étude et résumés sur Crane ? Sur cette page, vous trouverez 3366 documents pour vous aider à réviser pour Crane.
Page 2 sur 3.366 résultats
Trier par
-
NCCCO MOBILE CRANE questions with correct answers
- Examen • 20 pages • 2023
-
Disponible en pack
-
- €12,78
- 1x vendu
- + en savoir plus
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - Answer c. 
 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8% - Answer a. 
 
3. The load line of the crane you're operating contacts ...
-
NCCCO Mobile Crane / NCCCO Core Exams (2023/ 2024 UPDATES STUDY BUNDLE WITH COMPLETE SOLUTIONS) Questions and 100% Correct Verified Answers| Grade A
- Pack • 5 éléments • 2023
-
- €24,14
- 2x vendu
- + en savoir plus
NCCCO Mobile Crane / NCCCO Core Exams (2023/ 2024 UPDATES STUDY BUNDLE WITH COMPLETE SOLUTIONS) Questions and 100% Correct Verified Answers| Grade A
-
NCCCO MOBILE CRANE EXAM LATEST 2024 -2025 QUESTIONS AND CORRECT VERIFIED ANSWERS|GRADED A+
- Examen • 24 pages • 2024
-
- €15,15
- 2x vendu
- + en savoir plus
NCCCO MOBILE CRANE EXAM LATEST 
QUESTIONS AND CORRECT VERIFIED 
ANSWERS|GRADED A+
-
CRANE EXAMS
- Pack • 27 éléments • 2024
-
- €17,51
- 1x vendu
- + en savoir plus
-
NCCCO Core Practice Exam (2024 / 2025 Update) Questions and 100% Correct Verified Answers | Grade A
- Examen • 24 pages • 2024
-
Disponible en pack
-
- €7,57
- 1x vendu
- + en savoir plus
NCCCO Core Practice Exam (2024 / 2025 Update) Questions and 100% Correct Verified Answers | Grade A Q: From which two points should the boom be measured? Answer: From the boom hinge pins to the center of the boom tip sheave Q: What is the preferred method of installing wire rope from a reel onto a hoist drum? Answer: The rope runs from the top of the reel to the top of the drum Q: Over which quadrant are truck crane capacities usually greater? Answer: Over the rear. Q: According to OSHA, which a...
-
NCCCO tower crane
- Pack • 17 éléments • 2024
-
- €17,04
- 1x vendu
- + en savoir plus
NCCCO tower crane
-
Mobile Crane NCCER Study Guide – Complete With Answers
- Examen • 5 pages • 2024
-
Disponible en pack
-
- €8,52
- 1x vendu
- + en savoir plus
Mobile Crane NCCER Study Guide – Complete With Answers
-
NCCCO/ Tower Crane Tests (NEW 2023/ 2024 UPDATES BUNDLED TOGETHER WITH COMPLETE SOLUTIONS) Questions and Verified Answers| Graded A| 100% Correct
- Pack • 2 éléments • 2023
-
- €14,20
- 2x vendu
- + en savoir plus
NCCCO/ Tower Crane Tests (NEW 2023/ 2024 UPDATES BUNDLED TOGETHER WITH COMPLETE SOLUTIONS) Questions and Verified Answers| Graded A| 100% Correct
-
CATEGORY 3 NON-CAB OPERATED CRANE SAFETY QUESTIONS WITH CORRECT ANSWERS
- Examen • 9 pages • 2023
-
- €9,94
- 2x vendu
- + en savoir plus
A floating crane with a capacity of 200,000lbs. is a ________________ crane. CORRECT ANSWER Category 1 
 
What is the category of a jib crane with a capacity of less than 20,000 pounds? CORRECT ANSWER Category 3 
 
An OET, Bridge crane with a capacity of 80,000lbs. is a ________________ crane. CORRECT ANSWER Category 2 
 
A commercial truck mounted crane with a capacity of 14,000 lbs. is a __________ crane. CORRECT ANSWER category 4 
 
What types of power does a Category 1 or 4 crane generally u...
-
Tower Crane (Questions and Answers)
- Examen • 8 pages • 2023
-
- €9,84
- 1x vendu
- + en savoir plus
Which of the following OSHA regulations govern suspended personnel platforms? correct answers OSHA 1926.1431 
 
According to ASME B30.3 The prohibited zone for power lines that are 60 kV is correct answers 15 ft 
 
According to ASME B30.3, load hoist rotation resistant wire rope has a design factor of correct answers 5 to 1 
 
According to ASME B30.3 when Lifting a suspended personnel platform design factor for the rigging hardware is correct answers 5 to 1 
 
According to ASME B30.3 Load hoist ...