Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien 4.2 TrustPilot
logo-home
Examen

CPESC Section 1 & 2 With A+ Graded And Verified

Note
-
Vendu
-
Pages
5
Grade
A+
Publié le
07-02-2025
Écrit en
2024/2025

CPESC Section 1 & 2 With A+ Graded And Verified

Établissement
CPESC Section 1 & 2 With A+ Graded And Verified
Cours
CPESC Section 1 & 2 With A+ Graded And Verified









Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

École, étude et sujet

Établissement
CPESC Section 1 & 2 With A+ Graded And Verified
Cours
CPESC Section 1 & 2 With A+ Graded And Verified

Infos sur le Document

Publié le
7 février 2025
Nombre de pages
5
Écrit en
2024/2025
Type
Examen
Contient
Questions et réponses

Sujets

Aperçu du contenu

CPESC Section 1 & 2 With A+ Graded And Verified
What does the acronym NPDES stand for? - correct answerNational Pollutant Discharge Elimination System
m m m m m m m m m m m m m




True / False: The NPDES requirements apply only to discharges of storm-water either directly or through a municipal
m m m m m m m m m m m m m m m m m




separate storm drain system, to waters of the US. - correct answer2.1.1.6
m m m m m m m m m m m m m




True

What does the acronym TMDL stand for? Define it? - correct answer2.1.1.10
m m m m m m m m m m m m




Total Maximum Daily Load. The amount of a particular pollutant that a water body can assimilate on a daily basis without
m m m m m m m m m m m m m m m m m m m m




violating applicable water quality standards.
m m m m m




Define TMDL - correct answer2.1.1.10 m m m m m




The TMDL defines the amount of a particular pollutant that a water body can assimilate on a daily basis without violating
m m m m m m m m m m m m m m m m m m m m




applicable water quality standards. (Water quality standards usually predetermined by the state.)
m m m m m m m m m m m m




What are the two types of storm-water permits issued under the NPDES Program? - correct answer2.2.1
m m m m m m m m m m m m m m m




1. The Construction General Permit (CGP).
m m m m m




2. The individual permit designed to fit the specific requirements of a particular applicant, facility, or activity.
m m m m m m m m m m m m m m m m




If deficiencies are found during a SWPPP inspection, how quickly do they need to be corrected? - correct answerNo later
m m m m m m m m m m m m m m m m m m m




than seven days after the inspection.
m m m m m m




List three types of pollutants. - correct answer2.1
m m m m m m m




Nutrients,pathogens, heavy metals, toxics, sediment, salts, detergents, hydro-carbons,oxygen absorbing substances. m m m m m m m m m




List three examples of 'Waters of the United States'. - correct answer2.1.1.6
m m m m m m m m m m m




Lakes,rivers, streams, mudflats, sand flats, wetlands, sloughs, prairie potholes, wet meadows, playa lakes, natural ponds.
m m m m m m m m m m m m m m




When does the SWPPP need to be completed? - correct answer2.3.6.4
m m m m m m m m m m




Prior to submitting the NOI.
m m m m




When does the EPA's construction permit require inspections? - correct answerEvery 7 days, or within 24 hrs of a storm of
m m m m m m m m m m m m m m m m m m m m




0.5 inches or move in depth.
m m m m m m




What does CPESC stand for? - correct answerCertified Professional in Erosion & Sediment Control
m m m m m m m m m m m m m




What are the two types of Storm Water Permits? - correct answer2.2.1
m m m m m m m m m m m m




1. General: provides umbrella coverage to a large number of applicants.
m m m m m m m m m m




m 2. Individual: designed to fit the specific requirements of a particular applicant, facility, or activity.
m m m m m m m m m m m m m m




True/False: A site initially disturbing 1/2 acre, that is part of a 3.5 acre future development is not required to obtain a permit
m m m m m m m m m m m m m m m m m m m m m m




for the 1/2 acre. - correct answer2.1.1.8
m m m m m m m




False, If it as part of a larger plan of development >1 acre, a permit is required.
m m m m m m m m m m m m m m m m




Name 3 of the 5 types of Phase I facilities under section 402 of the CWA as of 1987. - correct answer2.1.1.2
m m m m m m m m m m m m m m m m m m m m m




-Facilities already covered by a permit m m m m m




-Facilities that engage in industrial activity m m m m m




-Large (>250K pop) MS4s m m m




-Medium (100K250K) MS4s m m




-Facilities that EPA admin deems "significant contributors" of pollutants to WOTUS
m m m m m m m m m m




Who is responsible for applying for the Storm water permit for a construction site? - correct answer2.3.1
m m m m m m m m m m m m m m m m




The operator of the site, however a owner can apply if the operator has not been identified.
m m m m m m m m m m m m m m m m




What is an NOI? - correct answer2.2.4
m m m m m m




"Notice of Intent" to be covered by a general permit in the state in which the facility is located.
m m m m m m m m m m m m m m m m m m

, List the 6 major phases of a SWPPP for construction activities? - correct answer2.3.6
m m m m m m m m m m m m m




-Site Evaluation/design development (site plan)
m m m m




-Assessment (site area/runoff calc) m m m




-Control selection and plan design (BMPs) m m m m m




-Certification/notification (NOI) m




-Construction/implementation (install/maintenance) m




-Final stabilization/termination (NOT)
m m




What score do you need to pass each section of the test? - correct answer70%
m m m m m m m m m m m m m m




What is the deadline to stabilize a site that wont be redisturbed? - correct answer2.3.6.3
m m m m m m m m m m m m m m m




14 days m




What is the deadline to correct problems found during an inspection? - correct answer2.3.6.5
m m m m m m m m m m m m m m




As soon as possible but no later than 7 days.
m m m m m m m m m




How long do you have to keep copies of the swppp after final stabilization? - correct answer2.3.6.5 (second to last
m m m m m m m m m m m m m m m m m m m




paragraph)
m m




3 years
m




What are the 3 types of enforcement actions EPA has? - correct answer2.3.7
m m m m m m m m m m m m




-Administrative Orders m




-Civil Actions m




-Criminal Prosecutions m




The Federal Water Pollution Control Act was established which year? - correct answer1948
m m m m m m m m m m m m




When was the Federal Water Pollution Control Act amended? What is it called now? - correct answer2.1.1
m m m m m m m m m m m m m m m m




1972 and 1977. Now called the Clean Water Act
m m m m m m m m




Which year was the National Pollutant Discharge Elimination System established? - correct answer2.1.1.2
m m m m m m m m m m m m




1972

What is an MS4? - correct answerMunicipal Separate Storm Sewer System
m m m m m m m m m m




Stormwater is defined under EPA's NPDES rules as . . . - correct answer2.1.1.5
m m m m m m m m m m m m m




Stormwater runoff, snow melt runoff, and surface runoff and drainage.
m m m m m m m m m




Who is allowed to certify the SWPPP? - correct answerThe authorized representative of the site operator, such as the
m m m m m m m m m m m m m m m m m m




president, vice president, or a general partner who has been delegated authority to sign and certify this type of document.
m m m m m m m m m m m m m m m m m m m m




Whatare the Fundamentals of the Code of Ethics and Professional Conduct ? - correct answer* Integrity
m m m m m m m m m m m m m m m




* Objectivity
m




* Confidentiality
m




* Competence
m




* Professionalism
m




Who oversees Stormwater Regulations ? - correct answerEPA (US Environmental Protection Agency)
m m m m m m m m m m m




When was the Stormwater Application Rule issued? - correct answerNovember 16th, 1990
m m m m m m m m m m m




When was the Stormwater Implementation Rule enacted and what did it entail? - correct answerApril 1992; minimum
m m m m m m m m m m m m m m m m




requirements for storm water permit terms and conditions
m m m m m m m m




What does the Phase II discharger's include and when were they established? - correct answerPhase II stormwater
m m m m m m m m m m m m m m m m




dischargers generally include "light" industrial facilities, small construction sites (< 5 acres), and small municipalities
m m m m m m m m m m m m m m m




(<100,000 population)
m m




August 1995 m




When was the Multi Sector Model General Permit issued? - correct answerSeptember 1995
m m m m m m m m m m m m
€7,86
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien

Faites connaissance avec le vendeur
Seller avatar
TESTB

Faites connaissance avec le vendeur

Seller avatar
TESTB Chamberlain College Of Nursing
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
3
Membre depuis
1 année
Nombre de followers
0
Documents
251
Dernière vente
3 semaines de cela
SMART B

I am a leader in online test prep. I take great pride in our tests and their ability to help you pass your exams. feel free to contact

0,0

0 revues

5
0
4
0
3
0
2
0
1
0

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions