- Guías de estudio, Notas de estudios & Resúmenes
¿Buscas las mejores guías de estudio, notas de estudio y resúmenes para ? En esta página encontrarás 85 documentos de estudio para .
85 resultados
Examen
OPMA Final questions with complete solutions graded A+ passed
OPMA Final questions with complete solutions graded A+ passed
Examen
OPMA Exam 3 (Chapters 5, 9, 10, 14) with verified answers passed
OPMA Exam 3 (Chapters 5, 9, 10, 14) with verified answers passed
Examen
OPMA EXAM 3 questions with verified solutions graded A+
OPMA EXAM 3 questions with verified solutions graded A+
Examen
OPMA case analytic studies questions with verified answers pass
OPMA case analytic studies questions with verified answers pass
Examen
OPMA FINAL questions well answered graded A+ 2025-2026
OPMA FINAL questions well answered graded A+
Examen
OPMA exam 1 questions with verified answers graded
OPMA exam 1 questions with verified answers graded
Examen
OPMA 401 Midterm 2(Complete solutions)
production order quantity correct answers -used when inventory builds up over a period of time after an order is placed 
-used when units are produced and sold simultaneously 
 
ABC analysis correct answers a method for categorizing items so the most important items receive more management attention 
 
class A items correct answers top 15% 
these items represent 70-80% of total dollar usage. Managerial involvement required 
 
class B items correct answers next 35% 
these intermediate items acc...
Examen
OPMA 407 Project Management Final Exam(All answered)
What are the 4 stages of a project life cycle? correct answers 1) Project Formation 
2) Project Build-up 
3) Main program 
4) Project phase-out 
 
What are 5 strategies to deal with conflict? (CACAC) correct answers - Competing 
- Avoiding 
- Collaborating 
- Accommodating 
- Compromising 
 
MRQ: What are four potential sources of conflict during the project formation stage? 
 
**On final exam** correct answers 1) Technical objectives not significantly detailed or explained --> difficult to d...
Examen
OPMA 317 - Chapter 5: Project Management & Scheduling(A+ Graded)
Define Project Management and the two broad categories it has correct answers Definition: a project may be defined as a series of related jobs (activities) usually directed towards some major output and requiring a significant time to perform 
 
two broad categories: 
 
1. Conventional (low-tech). Repetitive projects, tested methods are preferred. Home construction. 
 
2. Innovative (High-tech). Unique projects, flexible plans. Building the tallest tower 
 
Evaluating Project "Success" co...
Examen
OPMA 405 - Individual Quiz(with Errorless answers)
Distinctive Characteristics of Services correct answers 1) Customer participation --> attention to facility design; customer plays part in process 
 
2) Simultaneity (interaction) --> service capacity/facility utilization 
 
3) Perishability (no inventories) → capacity management (demand/forecasting) 
 
4) Intangibility (no patents) → spawns imitators; requires constant innovation 
 
5) Heterogeneity (variability) → sales and demand will never be homogenous 
 
6) Non-transferable own...
Examen
OPMA Ch. 11 Inventory management(with solved solutions)
inventory management correct answers the planning and controlling of inventories to meet the competitive priorities of the organization 
 
accounting inventories correct answers raw materials 
work in process 
finished goods 
 
operational inventories correct answers cycle inventory 
safety stock inventory 
anticipation inventory 
pipeline inventory 
 
average cycle inventory correct answers Q/2 
 
pipeline inventory correct answers d(L) 
 
single period model correct answers used when we are m...
Examen
OPMA 3306 Chapter 4 Conceptual Questions from Homework(All Accurately solved)
Overtime and personnel transfers are solutions to capacity problems in the intermediate term. correct answers False 
 
Capacity planning is generally viewed in three time durations: Immediate, Intermediate, and Indeterminate. correct answers False 
 
The problem of keeping demand sufficiently high to keep a large factory busy is a sales issue and not a diseconomy of scale. correct answers False 
 
The ultimate in plant flexibility is a one-hour-changeover time plant. correct answers False, zero-...
Examen
OPMA 3306 Chapter 10 Conceptual Homework Questions(100% Everfree answers)
Six Sigma refers to the philosophy and methods that some companies use to eliminate defects in their products and processes. correct answers True 
 
Variation that is inherent in a production process itself is called assignable variation. correct answers False 
 
A p-chart has upper and lower control limits expressed as lines on the chart. As long as the sample values fall between these two lines there is no need to investigate process behavior. correct answers False 
 
The value for Z used in q...
Examen
OPMA 317 - Supply chain management(A+ Guaranteed Answers)
supply chain correct answers a network of facilities that procure raw materials, transform them into intermediate goods and then final products, and deliver the products to customers through a distribution system 
 
Vertical Integration correct answers Practice where a single entity controls the entire process of a product, from the raw materials to distribution 
 
Why would an organization not want to "outsource"? (do things themselves instead) correct answers control 
 
purchasing (procu...
Examen
OPMA 3306 Chapter 3 Quiz questions(100% Guaranteed)
As a consultant, you have been asked to generate a unit demand forecast for a product for year 2014 using exponential smoothing. The actual demand in year 2013 was 750. The forecast demand in year 2013 was 960. Using these data and a smoothing constant alpha of 0.3, which of the following is the resulting year 2014 forecast value? correct answers 897 
 
A company wants to forecast demand using the weighted moving average. If the company uses three prior yearly sales values (i.e., year 2011 = 160...
Examen
UTA OPMA-3306 Chapter 1(Completely solved)
Operations and supply chain management (OSCM) correct answers The design, operation, and improvement of the systems that create and deliver the firm's primary products and services. 
 
Operations correct answers refers to manufacturing and service processes that are used to transform the resources employed by a firm into products desired by customers. 
 
Supply chain correct answers refers to processes that move information and material to and from the manufacturing and service processes of t...
Examen
OPMA 3306 Chapter 10(Correctly solved)
The philosophical leaders of the quality movement, Philip Crosby, W. Edwards Deming, and Joseph M. Juran had the same general message about what it took to achieve outstanding quality. Which of the following was not part of that message? correct answers Quality is free 
 
The philosophical leaders of the quality movement, Philip Crosby, W. Edwards Deming, and Joseph M. Juran had the same general message about what it took to achieve outstanding quality. Which of the following was part of that me...
Examen
OPMA 317 07 Supply Chain Management(All solved)
supply chain correct answers network of facilities that procure raw materials, transform them into intermediate goods and then final products, and deliver the products to customers through a distribution system 
 
value chain correct answers only includes processes that add value in the chain 
 
complexities correct answers includes multiple stages of suppliers, multiple locations of internal transformation, multiple stages of physical distribution 
 
critical success factors correct answers use...
Examen
Final Exam Review OPMA 3306(Correct answers)
A BOM file is also called which of the following correct answers Product Tree 
 
MRP stands for Material Requirements Planning correct answers True 
 
A project can be subdivided into which of the following correct answers work packages 
 
MRP is most valuable where a number of products are made in batches using the same productive equipment correct answers True 
 
PERT is an abbreviation for which of the following methodologies correct answers Program Evaluation and Review Technique 
 
How many...
Examen
OPMA 3306-Practice Questions- Chapter 9(100% Verified)
A BOM file is also called which of the following? correct answers A. Product tree 
 
Which of the following industry types have high expected benefits from the application of MRP? correct answers C. Assemble-to-stock 
 
Which of the following industry types have high expected benefits from the application of MRP? correct answers C. Assemble-to-order 
 
Which of the following industry types will not benefit greatly from the application of MRP? correct answers A. Fabricate-to-order 
 
A product tr...