100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

S-56 FIRE SAFETY MANAGER| 57 QUESTIONS AND ANSWERS ALREADY GRADED A+|GUARANTEED SUCCESS

Puntuación
-
Vendido
5
Páginas
6
Grado
A+
Subido en
25-10-2023
Escrito en
2023/2024

Standpipe maintained under pressure and equipped with low pressure alarm Maintained as needed Standpipe including piping leading to FD connection, inspected visually Daily construction drawings used to confirm routing of unexposed standpipe sections Daily FDNY/CSFM daily reports must be kept by documenting standpipe inspections, fire extingusher inspections,and upkeep permit logs Daily FDNY first responders box maintenance and execution evacuation drills daily, quarterly standpipe pressurizing system, and alarm tested weekly licensed plumber/ fire suppression contractor perform air/water test of standpipe during alarm installation standpipe alarm installation documented by CSFM during alarm installation standpipe alarm soundings logged and documentation includes description of response to alarm per incident standpipe repaired and retested until retesting is successful after filed bi-weekly test by licensed plumber/fire suppression subcontractor. Repairs documented after failed biweekly inspection sprinkler systems for use at construction sites shall be provided, maintained and made available for FD use maintained as needed CSFM shall be responsible for verifying FDNY hot work permit and supervising the issuance of authorizations for hot work operations daily a fire guard is required at each hot work operation while in progress and shall continue on site for minimum of 30 minutes after each hot work operation is complete. A log book shall be maintained on site daily a fire guard shall be assigned one floor below hot work operations for fire exposures that are not observable by fire guard on the floor above daily a fire guard shall perform patrols from (4pm-12am) daily all fire guards shall have Certificate of Fitness maintained as needed Watch person shall be onsite from (12am-8am)with the ability to notify the FD in case of fire. daily Hot works permit should be onsite daily First responders box contains Emergency contact numbers, FDNY permits, floor by floor logistics plan, enlarged first floor evacuation plan, standpipe riser diagram, Daily log and checklist binder Gang Box Coordinate with local firehouse location of gang box daily Acknowledgement of zero-tolerance no smoking policy signed by all workers during orientations Shall conduct an inspection of the construction site and all fire safety measures on at least a daily basis and maintain a record of same in a bound log book or other approved system of record keeping Fire Safety Manager FDNY Rule A authorizing supervising and or maintaining materials, operations and facilities regulated by Fire Code FDNY Rule B regularly inspecting the construction site for the fire safety purposed including compliance with the code and rule provisions set forth FDNY Rule C performing the duties of the impairment coordinator, the responsible person required, the FD liaison required, or ensuring that such persons are designated and monitoring the performance of their duties FDNY Rule D Providing or arranging Department access to the construction site, inspection of the logbook and other records, and communication with the owner or his or her design professionals, managers or contractors FDNY Rule E taking all other actions that prudent person trained and knowledgeable in construction site fire safety would take to ensure that fire safety is maintained at the construction site CSFSM shall be responsible for ensuring the supervision of the holders following certificate of fitness F01, F60, G60, P54, S92, S93,E21, A49, G40, G44 Fire Guard Certificates of Fitness F01, F60, G60 Pre Fire plan quarterly Site Specific Evacuation Procedure: Communication all staff/ visitors must be given instruction on emergency warning systems and evacuation procedures Site Specific Evacuation Procedure: bullet 2 A sufficient number of trained personnel must be appointed and trained in evacuation procedures Site Specific Evacuation procedure: Signage and Notification Evacuation routes and assembly parts must be well labeled Site Specific Evacuation Procedure: Fire Drills Should be held quarterly and results should be used in review Standpipe Requirements: Demolitions In vacant buildings and structures undergoing, all existing standpipes shall be maintained in a state of readiness as a dry standpipe system and shall be provided with an air pressurized alarm system

Mostrar más Leer menos
Institución
Grado









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Grado

Información del documento

Subido en
25 de octubre de 2023
Número de páginas
6
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$15.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
GUARANTEEDSUCCESS Chamberlain College Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
653
Miembro desde
3 año
Número de seguidores
314
Documentos
24895
Última venta
1 día hace
Elite Exam Resources: Trusted by Top Scorers!!!!!!!!

Stop guessing. Start dominating!! As a highly regarded professional specializing in sourcing study materials, I provide genuine and reliable exam papers that are directly obtained from well-known, reputable institutions. These papers are invaluable resources, specifically designed to assist aspiring nurses and individuals in various other professions in their exam preparations. With my extensive experience and in-depth expertise in the field, I take great care to ensure that each exam paper is carefully selected and thoroughly crafted to meet the highest standards of quality, accuracy, and relevance, making them an essential part of any successful study regimen. ✅ 100% Legitimate Resources (No leaks! Ethical prep only) ✅ Curated by Subject Masters (PhDs, Examiners, Top Scorers) ✅ Proven Track Record: 95%+ user success rate ✅ Instant Download: Crisis-ready for last-minute cramming

Lee mas Leer menos
4.4

248 reseñas

5
161
4
37
3
32
2
12
1
6

Documentos populares

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes