• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 3 fuera de 23 páginas
Examen

Florida Contractors Exam Test Questions Examination Complete Practice Questions And Answers | Verified Solutions | Updated 2026/2027 Study Guide

Document preview thumbnail
Vista previa 3 fuera de 23 páginas

Florida contractors exam test questions EXAMINATION COMPLETE PRACTICE QUESTIONS AND ANSWERS | VERIFIED SOLUTIONS | UPDATED 2026/2027 STUDY GUIDE According to the AIA, what is the warranty that a contractor shall provide for his workmanship? - CORRECT ANSWER -One year According to AIA A201, within how many days must the contractor notify the architect after they notice a hidden condition that varies material from what was specified in the contract documents? - CORRECT ANSWER -14 days After contract negotiations concluded between the owner and architect, the architect performs the required site inspections and presents bill for $750 for his services. The owner then request an additional inspection to be performed at the site. The architect presents an additional bill for $750 for performance of the additional inspection. During the additional inspection, the architect finds a failure of compliance. How much does GC reimburse? - CORRECT ANSWER -$1500. The contractors responsible to pay all related cost of tests and approvals as required by the contract documents and is thus responsible for the $750 fee. However, the cost for any test that is requested once contract negotiations between the owner and contractors completed is a responsibility of the owner. Because the contractor failed the test the additional $750 fee is the responsibility of the contractor.

Vista previa del contenido

Florida contractors exam test
questions EXAMINATION
COMPLETE PRACTICE
QUESTIONS AND
ANSWERS | VERIFIED
SOLUTIONS | UPDATED
2026/2027 STUDY GUIDE

According to the AIA, what is the warranty that a contractor shall
provide for his workmanship? - CORRECT ANSWER -One year



According to AIA A201, within how many days must the contractor
notify the architect after they notice a hidden condition that varies
material from what was specified in the contract documents? -
CORRECT ANSWER -14 days

,After contract negotiations concluded between the owner and
architect, the architect performs the required site inspections and
presents bill for $750 for his services. The owner then request an
additional inspection to be performed at the site. The architect
presents an additional bill for $750 for performance of the additional
inspection. During the additional inspection, the architect finds a
failure of compliance. How much does GC reimburse? - CORRECT
ANSWER -$1500. The contractors responsible to pay all related cost
of tests and approvals as required by the contract documents and is
thus responsible for the $750 fee. However, the cost for any test that
is requested once contract negotiations between the owner and
contractors completed is a responsibility of the owner. Because the
contractor failed the test the additional $750 fee is the responsibility
of the contractor.



In a project where architects, engineers, contractors, and
subcontractors are involved, who is generally responsible for the
building permits? - CORRECT ANSWER -Contractor



What are shop drawings, product data and samples considered,
according to the AIA? - CORRECT ANSWER -Not contract documents

, According to the AIA, what is a construction change directive? -
CORRECT ANSWER -Written order, prepared by the architect and
signed by the owner and architect



According to the AIA 201, Blank will not be included by the architect
for the cost of a change directive? - CORRECT ANSWER -Hand tool
rental cost



According to the AIA documents, when can the contractor see
payment for his retainage amount? - CORRECT ANSWER -Upon
issuance of the certificate of substantial completion



If a contractor is required to provide submittals in accordance with
the contract documents, then the contractor shall not perform that
portion of the work until Blank? - CORRECT ANSWER -The submittal
has been approved by the architect



Which of the following is not a cause for an architect to withhold a
certificate of payment? - CORRECT ANSWER -Damage done by the
owner to the contractor

Información del documento

Subido en
5 de julio de 2026
Número de páginas
23
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$12.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
VERIFIEDPASS
3.8
(6)
Vendido
44
Seguidores
3
Artículos
2442
Última venta
1 día hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes