High priming water levels can adversely affect the operation of supervisory air.
What is not a step in testing the water level? - ANS -Close the priming level test
valve before air discharges
The _____ valve shall be supervised closed in the pipeline to the hose valve
header - ANS -control
A diesel fuel storage tank is required to always be a minimum of __ full. - ANS -2/3
A fire pump controller shall be in a fully functional state within ___ seconds of AC
power available. - ANS -10
The standpipe system demand shall include 500 gpm for the first standpipe and
___ gpm for each additional standpipe until the total system demand is
simultaneously met. - ANS -250
Water motor gongs and pressure switch alarm devices shall be inspected: - ANS -
quarterly
A temporary standpipe used during construction must be at least ___ in diameter
- ANS -4 inches
, Blue color coding on a sprinkler indicates it has a temperature rating between
_____. - ANS -250 - 300 degrees F
When swapping out pressure gauges, it is important to verify the arrow on the 3-
way valve is pointed in the proper direction before removing the gauge and once
the gauge is removed, the 3-way valve must be flushed adequately so any debris
that may have accumulated does not end up in the new gauge. - ANS -True
According to NFPA 20, a _____ refill valve shall be used for each water supply tank
used for fire protection. - ANS -automatic
All sprinkler pressure-reducing valves shall be inspected qurterly to verify the
valves are in the following condition except: - ANS -in the closed position
Which type of pipe is not approved for standpipes - ANS -CPVC
Foam concentrate strainers shall be inspected: - ANS -quarterly
A fire pump water supply must be ___. - ANS -Adequate and dependable
The shut-off head shall not exceed ___ of rated head for any pump. - ANS -140%
The top hose outlet in a buuilding under construction must be maintained within
_____ floors of the highest forms, staging and similar combustibles at all times. -
ANS -one
VERIFIED ANSWERS |LATEST VERSION |ALREADY
GRADED A+
High priming water levels can adversely affect the operation of supervisory air.
What is not a step in testing the water level? - ANS -Close the priming level test
valve before air discharges
The _____ valve shall be supervised closed in the pipeline to the hose valve
header - ANS -control
A diesel fuel storage tank is required to always be a minimum of __ full. - ANS -2/3
A fire pump controller shall be in a fully functional state within ___ seconds of AC
power available. - ANS -10
The standpipe system demand shall include 500 gpm for the first standpipe and
___ gpm for each additional standpipe until the total system demand is
simultaneously met. - ANS -250
Water motor gongs and pressure switch alarm devices shall be inspected: - ANS -
quarterly
A temporary standpipe used during construction must be at least ___ in diameter
- ANS -4 inches
, Blue color coding on a sprinkler indicates it has a temperature rating between
_____. - ANS -250 - 300 degrees F
When swapping out pressure gauges, it is important to verify the arrow on the 3-
way valve is pointed in the proper direction before removing the gauge and once
the gauge is removed, the 3-way valve must be flushed adequately so any debris
that may have accumulated does not end up in the new gauge. - ANS -True
According to NFPA 20, a _____ refill valve shall be used for each water supply tank
used for fire protection. - ANS -automatic
All sprinkler pressure-reducing valves shall be inspected qurterly to verify the
valves are in the following condition except: - ANS -in the closed position
Which type of pipe is not approved for standpipes - ANS -CPVC
Foam concentrate strainers shall be inspected: - ANS -quarterly
A fire pump water supply must be ___. - ANS -Adequate and dependable
The shut-off head shall not exceed ___ of rated head for any pump. - ANS -140%
The top hose outlet in a buuilding under construction must be maintained within
_____ floors of the highest forms, staging and similar combustibles at all times. -
ANS -one