logo-home

Runnigheroes

On this page, you find all documents, package deals, and flashcards offered by seller RUNNIGHEROES.

Community

  • Followers
  • Following

1854 items

NCCER Core Module 1 | 100% Correct Answers | Verified | Latest 2024 Version

(0)
$10.49
0x  sold

Companies with strong safety cultures usually have lower? - Turnover Poor lighting, excessive noise, and inadequate guards for moving parts are examples of - unsafe conditions The activity that consists of breaking a job into its component tasks and then analyzing each step for potential hazards is called a _____. - Job Safety Analysis A measure of the probability, consequences, and exposure related to an event is referred to as _____. - Risk

i x
  • Exam (elaborations)
  •  • 3 pages • 
  • by RUNNIGHEROES • 
  • uploaded  31-05-2024
Quick View
i x

NCCER CORE FINAL | 100% Correct Answers | Verified | Latest 2024 Version

(0)
$10.99
0x  sold

Which of these is a true statement regarding safety? - Safety is a learned behavior and attitude. A measure of the probability, consequences, and exposure related to an event is referred to as _____. - Risk When placing a ladder against a platform or roof, the top of the ladder should extend above the point where the ladder touches the platform or roof by at least _____. - 3 feet One of the most common grounding systems used for protection against accidental electrical shock is the _____. ...

i x
  • Exam (elaborations)
  •  • 5 pages • 
  • by RUNNIGHEROES • 
  • uploaded  31-05-2024
Quick View
i x

NCCCO Tower Crane Tests | 100% Correct Answers | Verified | Latest 2024 Version

(0)
$12.99
0x  sold

Splices in rail tracks shall have - Smooth Joints Hydraulic systems should have their proper fluid level checked - Daily If power fails during operations, the following shouldn't apply - Do your best to finish moving load where it was designated to go If load is undetermined who is to find out if load weight does not exceed crane rating at radius at which the load is to be lifted - Person responsible for lift Where should climbing instructions be kept - ON Site All climbing operations sh...

i x
  • Exam (elaborations)
  •  • 13 pages • 
  • by RUNNIGHEROES • 
  • uploaded  31-05-2024
Quick View
i x

NCCCO TEST 2 | 100% Correct Answers | Verified | Latest 2024 Version

(0)
$10.49
0x  sold

When making a multiple crane lift, it is important for the operator to understand that: - The weight may increase if the other crane lands the load If a crane is not set-up level and the operator swings a load from the high side to the low side, the load radius will: - Increase Most crane manufacturers reduce load capacity for duty-cycle operations because: - Side loading forces may occur On who's recommendations should a preventative maintenance program be set-up? - Crane manufacturer ...

i x
  • Exam (elaborations)
  •  • 4 pages • 
  • by RUNNIGHEROES • 
  • uploaded  31-05-2024
Quick View
i x

NCCCO TEST 2 | 100% Correct Answers | Verified | Latest 2024 Version

(0)
$10.49
0x  sold

When making a multiple crane lift, it is important for the operator to understand that: - The weight may increase if the other crane lands the load If a crane is not set-up level and the operator swings a load from the high side to the low side, the load radius will: - Increase Most crane manufacturers reduce load capacity for duty-cycle operations because: - Side loading forces may occur On who's recommendations should a preventative maintenance program be set-up? - Crane manufacturer ...

i x
  • Exam (elaborations)
  •  • 4 pages • 
  • by RUNNIGHEROES • 
  • uploaded  31-05-2024
Quick View
i x

NCCCO Rigger 1 Study Questions | 100% Correct Answers | Verified | Latest 2024 Version

(0)
$10.99
0x  sold

1. A wire rope that is a 6x19 classification could have how many wires per strand? - 15 through 26 wires per strand 2. How often should a synthetic web sling be inspected? - Each day before use 3. Which considerations should be given to suspend lifting operations with a mobile crane? - Winds in excess of 35 mph 4. What is the term that best describes surface wear on a wire rope sling to rubbing or sliding? - Abrasion 5. Which of the following defects discovered during an inspection would ...

i x
  • Exam (elaborations)
  •  • 6 pages • 
  • by RUNNIGHEROES • 
  • uploaded  31-05-2024
Quick View
i x

NCCCO Rigger 1 Study Questions | 100% Correct Answers | Verified | Latest 2024 Version

(0)
$10.99
0x  sold

1. A wire rope that is a 6x19 classification could have how many wires per strand? - 15 through 26 wires per strand 2. How often should a synthetic web sling be inspected? - Each day before use 3. Which considerations should be given to suspend lifting operations with a mobile crane? - Winds in excess of 35 mph 4. What is the term that best describes surface wear on a wire rope sling to rubbing or sliding? - Abrasion 5. Which of the following defects discovered during an inspection would ...

i x
  • Exam (elaborations)
  •  • 6 pages • 
  • by RUNNIGHEROES • 
  • uploaded  31-05-2024
Quick View
i x

NCCCO Questions Test 1 | 100% Correct Answers | Verified | Latest 2024 Version

(0)
$11.99
0x  sold

Where is the best location for leveling a crane? - Upperworks When determining the "gross load" the best method is: - Get an accurate load weight and add the rigging. By order of hitch strength, which is the correct answer? - Basket, vertical, choker What is the purpose of using a jib? - Increase height When taking a side strain on a boom, what concerns the operator most? - Boom damage You should always have at least how many wraps on a hoist drum? - 2 On a load chart, values above the ...

i x
  • Exam (elaborations)
  •  • 4 pages • 
  • by RUNNIGHEROES • 
  • uploaded  31-05-2024
Quick View
i x

NCCCO MOBILE CRANE Tests | 100% Correct Answers | Verified | Latest 2024 Version

(0)
$12.99
0x  sold

1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? a. Boom down b. Swing c. Boom up d. Extend boom - c. 2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? a. 1% b. 2% c. 5% d. 8% - a. 3. The load line of the crane you're operating contacts an energized power line. ...

i x
  • Exam (elaborations)
  •  • 16 pages • 
  • by RUNNIGHEROES • 
  • uploaded  31-05-2024
Quick View
i x

NCCCO MOBILE CRANE TESTS 2024 | 100% Correct Answers | Verified | Latest 2024 Version

(0)
$12.99
0x  sold

1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? a. Boom down b. Swing c. Boom up d. Extend boom - c. 2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? a. 1% b. 2% c. 5% d. 8% - a. 3. The load line of the crane you're operating contacts an energized power line. ...

i x
  • Exam (elaborations)
  •  • 16 pages • 
  • by RUNNIGHEROES • 
  • uploaded  31-05-2024
Quick View
i x