Section 1: General Knowledge & Regulations
1. What is the primary purpose of a Certificate of Fitness for a G60
holder?
A) To design sprinkler and standpipe systems.
B) To authorize a person to operate and maintain these systems in a
specific building.
C) To perform welding on fire protection system piping.
D) To grant permission to shut down a system for as long as needed.
Answer: B) To authorize a person to operate and maintain these systems
in a specific building.
2. The G60 Certificate of Fitness is issued by which organization?
A) NYC Department of Buildings (DOB)
B) FDNY
C) OSHA
D) BSA
Answer: B) FDNY
3. A G60 holder's responsibilities are generally limited to:
A) Any building in New York City.
B) Only the building(s) listed on their Certificate of Fitness.
C) All buildings owned by their company.
D) Only during business hours.
,Answer: B) Only the building(s) listed on their Certificate of Fitness.
4. If a G60 holder finds a major impairment to a sprinkler or
standpipe system, they must immediately notify:
A) The building owner only.
B) The FDNY by calling 911.
C) The building's insurance company.
D) The tenants of the building.
Answer: B) The FDNY by calling 911.
5. What document must be kept on the premises and be readily
available for FDNY inspection?
A) The original system blueprints.
B) The G60 holder's resume.
C) The Certificate of Fitness.
D) A log of all tenant complaints.
Answer: C) The Certificate of Fitness.
6. During a fire, the primary role of the G60 holder is to:
A) Fight the fire with a hoseline.
B) Evacuate all occupants.
C) Assist the FDNY by operating and maintaining the building's fire
protection systems.
D) Direct traffic outside the building.
Answer: C) Assist the FDNY by operating and maintaining the
building's fire protection systems.
7. An "impairment" to a fire protection system is defined as:
A) A scheduled test of the system.
B) A condition where the system is fully operational.
C) Any condition that renders all or part of the system out of service.
, D) A minor leak that doesn't affect performance.
Answer: C) Any condition that renders all or part of the system out of
service.
8. Who is responsible for ensuring that all necessary tools and
equipment for operating the systems are available and in good
working order?
A) The FDNY
B) The building's maintenance staff
C) The G60 holder
D) The system's installer
Answer: C) The G60 holder
9. A G60 CoF is valid for a period of:
A) 1 year
B) 3 years
C) 5 years
D) Indefinitely
Answer: B) 3 years
10. If a G60 holder's employment at the designated building ends,
what must happen to the CoF?
A) The holder keeps it for their records.
B) It is automatically transferred to the new building.
C) It must be returned to the FDNY.
D) It is given to the building owner.
Answer: C) It must be returned to the FDNY.
Section 2: Sprinkler Systems
STUDY GUIDE 2025/2026 VERIFIED
QUESTIONS WITH DETAILED RATIONALES ||
100% GUARANTEED PASS <LATEST
VERSION>
Section 1: General Knowledge & Regulations
1. What is the primary purpose of a Certificate of Fitness for a G60
holder?
A) To design sprinkler and standpipe systems.
B) To authorize a person to operate and maintain these systems in a
specific building.
C) To perform welding on fire protection system piping.
D) To grant permission to shut down a system for as long as needed.
Answer: B) To authorize a person to operate and maintain these systems
in a specific building.
2. The G60 Certificate of Fitness is issued by which organization?
A) NYC Department of Buildings (DOB)
B) FDNY
C) OSHA
D) BSA
Answer: B) FDNY
3. A G60 holder's responsibilities are generally limited to:
A) Any building in New York City.
B) Only the building(s) listed on their Certificate of Fitness.
C) All buildings owned by their company.
D) Only during business hours.
,Answer: B) Only the building(s) listed on their Certificate of Fitness.
4. If a G60 holder finds a major impairment to a sprinkler or
standpipe system, they must immediately notify:
A) The building owner only.
B) The FDNY by calling 911.
C) The building's insurance company.
D) The tenants of the building.
Answer: B) The FDNY by calling 911.
5. What document must be kept on the premises and be readily
available for FDNY inspection?
A) The original system blueprints.
B) The G60 holder's resume.
C) The Certificate of Fitness.
D) A log of all tenant complaints.
Answer: C) The Certificate of Fitness.
6. During a fire, the primary role of the G60 holder is to:
A) Fight the fire with a hoseline.
B) Evacuate all occupants.
C) Assist the FDNY by operating and maintaining the building's fire
protection systems.
D) Direct traffic outside the building.
Answer: C) Assist the FDNY by operating and maintaining the
building's fire protection systems.
7. An "impairment" to a fire protection system is defined as:
A) A scheduled test of the system.
B) A condition where the system is fully operational.
C) Any condition that renders all or part of the system out of service.
, D) A minor leak that doesn't affect performance.
Answer: C) Any condition that renders all or part of the system out of
service.
8. Who is responsible for ensuring that all necessary tools and
equipment for operating the systems are available and in good
working order?
A) The FDNY
B) The building's maintenance staff
C) The G60 holder
D) The system's installer
Answer: C) The G60 holder
9. A G60 CoF is valid for a period of:
A) 1 year
B) 3 years
C) 5 years
D) Indefinitely
Answer: B) 3 years
10. If a G60 holder's employment at the designated building ends,
what must happen to the CoF?
A) The holder keeps it for their records.
B) It is automatically transferred to the new building.
C) It must be returned to the FDNY.
D) It is given to the building owner.
Answer: C) It must be returned to the FDNY.
Section 2: Sprinkler Systems