Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 254 pages
Exam (elaborations)

Solution Manual for Electrical Wiring Commercial | 18th Edition | Phil Simmons | Complete Answer Key for Chapters 1–21|ISBN: 9780357767108| Edition 2026

Document preview thumbnail
Preview 4 out of 254 pages

Solution Manual for Electrical Wiring Commercial | 18th Edition | Phil Simmons | Complete Answer Key for Chapters 1–21|ISBN: 9780357767108| Edition 2026Solution Manual for Electrical Wiring Commercial | 18th Edition | Phil Simmons | Complete Answer Key for Chapters 1–21|ISBN: 9780357767108| Edition 2026Solution Manual for Electrical Wiring Commercial | 18th Edition | Phil Simmons | Complete Answer Key for Chapters 1–21|ISBN: 9780357767108| Edition 2026Solution Manual for Electrical Wiring Commercial | 18th Edition | Phil Simmons | Complete Answer Key for Chapters 1–21|ISBN: 9780357767108| Edition 2025Solution Manual for Electrical Wiring Commercial | 18th Edition | Phil Simmons | Complete Answer Key for Chapters 1–21|ISBN: 9780357767108| Edition 2026Solution Manual for Electrical Wiring Commercial | 18th Edition | Phil Simmons | Complete Answer Key for Chapters 1–21|ISBN: 9780357767108| Edition 2026

Content preview

Solution Manual for Electrical Wiring Commercial, 18th Edition by Phil Simmons
sd sd sd sd sd sd sd sd sd sd




All Chapters Covered 1-
sd sd sd




21| Verified Questions & accurate Solutions for Exam Preparations| A+
sd sd sd sd sd sdsd sd sd sd sd




GRADED




1|Page

,Solution and Answer Guide
sd s d s d




CHAPTER S D 1: COMMERCIAL
SD S D BUILDING S D PLANS S D AND S D SPECIFICATIONS


TABLE OF CONTENTSS D S D




Review .......................................................................................................................................................... 1



Note to instructor: It is recommended that students be required to respond, where appropriate, wit
sd sd sd sd sd sd sd sd sd sd sd sd sd sd



h answers that are complete sentences.
sd sd sd sd sd




REVIEW

Refer to the National Electrical Code or the working drawings when necessary. Where applica
sd sd sd sd sd sd sd sd sd sd sd sd sd



ble, responses should be written in complete sentences.
sd sd sd sd sd sd sd




1. What section of a commercial building’s specification contains a list of contra
s d sd s d s d sd s d sd s d s d s d s d



ct documents?
sd




Answer: A list of the contract documents is contained in General Clauses and Con
s d s d s d s d s d s d s d s d s d s d s d s d sd



ditions. A listing of the Commercial Building contract documents is presented in th
s d s d s d s d s d s d s d s d s d s d s d sd



is chapter under the heading ―Commercial Building Plans.‖ The instructor may wish to hav
sd sd sd sd sd sd sd sd sd sd sd sd sd



e the students check over this listing and compare it with the plans provided.
s d s d s d s d s d s d s d s d s d s d s d s d s d




2. The requirement for temporary light and power at the job site will be found in what
sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd



portion of a commercial building’s specification?
sd sd sd sd sd




Answer: The Supplementary General Conditions specifies the job site requirements for t
sd sd sd sd sd sd sd sd sd sd sd



emporary light and power. In some contracts, this electrical system becomes the responsi
sd sd sd sd sd sd sd sd sd sd sd sd



bility of the general contractor; in other contracts, it is the electrical contractor’s responsi
sd sd sd sd sd sd sd sd sd sd sd sd sd



bility to install and maintain the temporary electrical system. The instructor may wish to re
sd sd sd sd sd sd sd sd sd sd sd sd sd sd



fer the student to NEC Article 590 and discuss the requirements in detail.
sd sd sd sd sd sd sd sd sd sd sd sd




|Page

, 3. The electrician uses the Schedule of Working Drawings for what purpose?
sd sd sd sd sd sd sd sd sd sd




Answer: The electrician uses the Schedule of Working Drawings to determine wheth
s d s d s d sd s d s d s d s d sd s d s d



er all of the drawings are at hand. The information on ―the other sheets‖ may be very imp
sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd



ortant, especially in coordinating with other contractors.
sd sd sd sd sd sd




4. Complete the following items by indicating the letter(s) designating the correct
sd sd sd sd sd sd sd sd sd sd sd



source(s) of information: sd sd




No. Answer Item Information

4. Sections Ceiling height sd Sections, Sheet A6 s d s d




5. Electrical s Electrical receptacle sd s Electrical symbol schedule, Chapter 2, F sd sd sd sd s d



symbol
d sd style
d igure 2–6 sd



schedule

6. Electrical s Electrical outlet sd s Electrical layout drawings, Sheets El, sd sd sd sd sd



layout dr
d sd location
d E2, and E3 sd sd



awings

7. Elevations s d Exterior wall finishes sd sd Elevations, Sheets A4 and A5 s d s d s d sd




8. Site plan sd Grading elevations sd Site plan, Sheet A4
sd sd sd




9. Electrical s Panelboard schedules s d Electrical layout drawings, Sheet E4 sd s d sd sd



layout dr
d sd



awings

10. Architectural sd Room width sd



floor plan sd Architectural floor plan, Sheets Al, sd sd sd sd sd



A2, and A3 sd sd




11. Architectural sd Swing of door s d s d Architectural floor plan, Sheets Al, A2, sd sd sd sd sd



floor plan sd and A3 sd




12. Sections View of interior wall sd sd sd Sections, Sheet A6 s d s d




Match the items on the left with those on the right by writing the letter designation of the app
sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd



ropriate organization from the list on the right.
sd sd sd sd sd sd sd




13. NEC Electrical Code sd National Electrical Code (NEC) sd sd sd




14. IAEI Electrical inspectors sd
International Association of Electrical I sd sd sd sd



nspectors (IAEI) sd



|Page

, 15. NFPA Fire codes sd National Fire Protection Association sd sd sd



(NFPA)

16. IESNA Lighting information sd Illuminating Engineering Society of s d s d s d



North America (IESNA) sd sd




17. UL Listing service sd Underwriters Laboratories, Inc. (UL) sd sd sd




18. NEMA Manufacturers’ National Electrical Manufacturers sd sd s d



standards Association (NEMA) sd




19. PE Seal Professional Engineer (PE) s d s d




Match the items on the left with those on the right by writing the letter designation of the pro
sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd



per level of NEC interpretation from the list on the right.
s d sd sd sd sd s d s d sd sd sd




20. with special sd s Allowed by the Code sd sd sd Shall be permitted, or Shall not be
sd sd sd sd sd sd



permission
d required, NEC sd




21. with special sd s May be done sd sd



permission
d Shall be permitted, or Shall n sd sd sd sd sd



ot be required, NEC
sd sd sd




22. shall Must be done s d s d Shall, National Electrical Code
sd sd sd




23. shall Required by the Code sd sd sd Shall, National Electrical Code
sd sd sd




24. never Up to the electrician
sd sd sd Shall be permitted, or Shall not be
sd sd sd sd sd sd



required, NEC sd




25. Find NEC 250.52(A)(5) and record the first four words.
sd sd sd sd sd sd sd sd




Answer: The first four words of NEC 250.52(A)(5) are Rod and pipe electrodes.
sd sd sd sd sd sd sd sd sd sd sd sd




Show required conversion calculations for problem 26 and problem 27.
sd sd sd sd sd sd sd sd sd




26. Luminaire style F is four feet long. The length in SI units, as specified by the NEC, is
sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd




Answer: The length in SI units is 1.22 m; 4 ft × 0.3048 m/ft = 1.2192 m. As will be discus
sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd



sed later, this luminaire is now called a 4 by 2 or the equivalent 1200 by 600 in metric ter
sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd s d



ms. This question assumes that the luminaire is exactly 4 ft long.
s d s d s d s d s d s d s d s d s d s d s d




27. The gross area of the drugstore basement is 1395 square feet. The area in square
sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd



meters is sd




|Page

Connected book
 image
Phil Simmons, Ray C. Mullin, Mark Ode Electrical Wiring Commercial
Publisher: 2023 ISBN: 9780357767108 Edition: Unknown

Document information

Uploaded on
August 13, 2025
Number of pages
254
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
£23.20

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
QUIVERS
3.8
(30)
Sold
179
Followers
10
Items
1085
Last sold
3 days ago

Reviews from verified buyers

5 months ago

thanks for the review .....feel freee to ask for more revision material goodluck!!!




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions