Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 10 out of 130 pages
Exam (elaborations)

Solution Manual and Answer Guide Electrical Wiring Commercial 18th Edition by Phil Simmons, Ray C. Mullin, Mark Ode| 9780357767108| All Chapters 1-21| LATEST 2025 ANSWERSHEET GRADED A +VERIFIED BY EXPERTS AND PROFESSIONALS

Document preview thumbnail
Preview 10 out of 130 pages

Solution Manual and Answer Guide Electrical Wiring Commercial 18th Edition by Phil Simmons, Ray C. Mullin, Mark Ode| 9780357767108| All Chapters 1-21| LATEST 2025 ANSWERSHEET GRADED A +VERIFIED BY EXPERTS AND PROFESSIONALS

Content preview

Created By: A Solution


Solutions Manual for Electrical Wiring Commercial
18th Edition by Phil Simmons A+

Solution and Answer Guide
SIMMONS/ODE, ELECTRICAL WIRING COMMERCIAL, 18E © 2024, 9780357767115;
CHAPTER 1:COMMERCIAL BUILDING PLANS AND SPECIFICATIONS


TABLE OF CONTENTS
Review .......................................................................................................................................................... 1



Note to instructor: It is recommended that students be required to respond, where
appropriate, with answers that are complete sentences.


REVIEW

Refer to the National Electrical Code or the working drawings when necessary. Where
applicable, responses should be written in complete sentences.
1. What section of a commercial building’s specification contains a list of contract
documents?
Answer: A list of the contract documents is contained in General Clauses and Conditions. A
listing of the Commercial Building contract documents is presented in this chapter under the
heading “Commercial Building Plans.” The instructor may wish to have the students check over
this listing and compare it with the plans provided.
2. The requirement for temporary light and power at the job site will be found in what
portion of a commercial building’s specification?
Answer: The Supplementary General Conditions specifies the job site requirements for
temporary light and power. In some contracts, this electrical system becomes the responsibility
of the general contractor; in other contracts, it is the electrical contractor’s responsibility to
install and maintain the temporary electrical system. The instructor may wish to refer the student
to NEC Article 590 and discuss the requirements in detail.


A+ Page 1

ANSWERSHEET

,Created By: A Solution




3. The electrician uses the Schedule of Working Drawings for what purpose?
Answer: The electrician uses the Schedule of Working Drawings to determine whether all of the
drawings are at hand. The information on “the other sheets” may be very important, especially in
coordinating with other contractors.
4. Complete the following items by indicating the letter(s) designating the correct source(s)
of information:
No. Answer Item Information

4. Sections Ceiling height Sections, Sheet A6

5. Electrical Electrical receptacle Electrical symbol schedule, Chapter
symbol style 2,Figure 2–6
schedule

6. Electrical Electrical outlet Electrical layout drawings, Sheets
layout location El,E2, and E3
drawings

7. Elevations Exterior wall finishes Elevations, Sheets A4 and A5

8. Site plan Grading elevations Site plan, Sheet A4

9. Electrical Panelboard schedules Electrical layout drawings, Sheet E4
layout
drawings

10. Architectural Room width Architectural floor plan, Sheets Al,
floor plan A2,and A3

11. Architectural Swing of door Architectural floor plan, Sheets Al,
floor plan A2,and A3

12. Sections View of interior wall Sections, Sheet A6



A+ Page 2

ANSWERSHEET

,Created By: A Solution


Match the items on the left with those on the right by writing the letter
designation ofthe appropriate organization from the list on the right.


13. NEC Electrical Code National Electrical Code (NEC)

14. IAEI Electrical inspectors International Association of
ElectricalInspectors (IAEI)


15. NFPA Fire codes National Fire Protection Association
(NFPA)

16. IESNA Lighting information Illuminating Engineering
Society ofNorth America
(IESNA)

17. UL Listing service Underwriters Laboratories, Inc.
(UL)

18. NEMA Manufacturers’ National Electrical
standards ManufacturersAssociation
(NEMA)

19. PE Seal Professional Engineer (PE)


Match the items on the left with those on the right by writing the letter
designation ofthe proper level of NEC interpretation from the list on the
right.


20. with Allowed by the Code Shall be permitted, or Shall not
special berequired, NEC
permission

21. with May be done Shall be permitted, or Shall not



A+ Page 3

ANSWERSHEET

, Created By: A Solution


special berequired, NEC
permission

22. shall Must be done Shall, National Electrical Code

23. shall Required by the Code Shall, National Electrical Code

24. never Up to the electrician Shall be permitted, or Shall not
berequired, NEC
25. Find NEC 250.52(A)(5) and record the first four words.

Answer: The first four words of NEC 250.52(A)(5) are Rod and pipe electrodes.

Show required conversion calculations for problem 26 and problem 27.

26. Luminaire style F is four feet long. The length in SI units, as specified by the NEC, is

Answer: The length in SI units is 1.22 m; 4 ft × 0.3048 m/ft = 1.2192 m. As will be discussed
later, this luminaire is now called a 4 by 2 or the equivalent 1200 by 600 in metric terms. This
question assumes that the luminaire is exactly 4 ft long.

27. The gross area of the drugstore basement is 1395 square feet. The area in square meters is

Answer: The area in SI units is 129.7 sq. m; 1395 sq. ft × 0.093 sq. m/sq. ft = 129.7 sq. m.




To answer Questions 28–31, refer to the Plans included with this book. Determine the Following
dimensions. Write the dimensions using unit names, not symbols (for example, 1 foot, not 1’),
and indicate the source of the information.

28. What is the inside clear distance of the interior stairway to the drugstore basement?

Answer: The inside clear distance of the interior stairway to the Drugstore basement is 4 ft 0 in.
(1.22 m), as scaled from Sheet A2.

29. What is the gross square footage of each floor of the building?

Answer: The gross area of each floor of the building is 60 ft × 43 ft = 2580 sq. ft (18.82 m ×
13.1 m = 246.5 sq. m), as taken from Sheets Al, A2, and A3.

30. What is the distance in the drugstore from the exterior block wall to the block wall
separating the drugstore from the bakery?

A+ Page 4

ANSWERSHEET

Connected book
 image
Phil Simmons, Ray C. Mullin, Mark Ode Electrical Wiring Commercial
Publisher: 2023 ISBN: 9780357767108 Edition: Unknown

Document information

Uploaded on
July 31, 2025
Number of pages
130
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
£10.26

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ANSWERSHEET
3.0
(7)
Sold
59
Followers
6
Items
359
Last sold
2 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions