CISEC Exam Prep – Verified Questions & Answers (Graded A+) 2025

Document preview thumbnail
Preview 4 out of 32 pages

Pass the Certified Inspector of Sediment and Erosion Control (CISEC) Exam with confidence! This high-yield guide includes real exam-style questions and expert explanations, ensuring you master erosion control, site inspections, and regulatory compliance. Key Topics Covered: Erosion & Sediment Control (ESC) Plans – Design, implementation, and maintenance Regulatory Standards – NPDES, EPA, and state-specific requirements Best Management Practices (BMPs) – Silt fences, sediment basins, stabilization techniques Inspection Protocols – Common violations and corrective actions Detailed Answer Rationales – Understand why answers are correct Quick-Reference Charts – BMP selection criteria, inspection checklists Why Choose This Guide? Exam-Aligned – Matches latest CISEC test content Field-Tested – Written by certified inspectors Saves Time – Focuses on most-tested concepts

Content preview

CISEC EXAM LATEST UPDATE CORRECT
ANSWERS GRADED A+

T/F: The CGP states that inspections are to occur only during normal
working hours - ANSWER--True


T/F: the CGP does not mandate inspection of equipment storage and
maintenance areas - ANSWER--False


T/F: Since 1998, regulations require permits for Phase I (5 acres or
more) projects. Since 2003, permits also required for Phase II (1 or
more acres) projects - ANSWER--True


T/F: Under the CWA, citizens can bring civil action against violators of
statutes and regulations. - ANSWER--True


As of 2019, Class I Administrative penalties under the CWA are up to
BLANK per violation with a max. penalty of BLANK - ANSWER--$20,628;
$51,570


Who has the responsibility to make sure that maintenance has been
performed on the best management practices? - ANSWER--Contractor
and Inspector

,Who has the responsibility to make sure that control measures are
properly selected, installed, and maintained? - ANSWER--Designer,
Inspector, and Contractor


T/F: The NPDES permit authorizes operators to discharge pollutants in
the manner that makes most sense for the site. - ANSWER--False


T/F: The EPA must grant approval for cationic flocculants. - ANSWER--
True


T/F: The goal of the NPDES permit is to eliminate all discharge of
pollutants from a construction site. - ANSWER--False: minimize


T/F: The EPA is adamant that BMPs only be installed during the early
phases of construction site development. - ANSWER--False


Inspections must be done within 24 hours of a storm event which has
or greater of rainfall. - ANSWER--0.25 inches


T/F: The SWPPP should always include the frequency of inspections -
ANSWER--True

,T/F: Inspections should occur even in conditions that are unsafe to
personnel. - ANSWER--False


After identifying issues, the SWPPP should be updated and updates
must occur within - ANSWER--7 calendar days


What method of erosion is marked by the bounding of soil particles? -
ANSWER--Saltation


Where does runoff flow? - ANSWER--From high point to low point


Offsite flows must be BLANK if they can't be BLANK - ANSWER--
Treated; diverted


What is hydrology? - ANSWER--The study of water


What are sources of water - ANSWER--Precipitation (rain, snow, hail,
sleet)


Rate of flow depends on what 6 variables? - ANSWER--Soil types and
roughness
Storm intensity and duration

, Contributing areas
Steepness of terrain
Length of slope
Vegetative cover


What is a hydrograph? - ANSWER--Picture of runoff
X-Axis: flow in cubic feet per second (cfs)
Y-Axis: time in minutes
Peak = maximum flow during runoff event


What is a sedigraph? - ANSWER--Represents sediment discharge
X-Axis: sediment yield rate
Y-Axis: time


When working in waterways or wetlands, which permit is required? -
ANSWER--404 Permit


NPDES - ANSWER--National Pollutant Discharge Elimination System
Section of CWA (Clean Water Act) to permit stormwater discharges
associated with industrial activities per the permit

Document information

Uploaded on
July 5, 2025
Number of pages
32
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
£10.39

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
OliviaRN
3.0
(22)
Sold
99
Followers
62
Items
468
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions