Questions with Accurate Answers
A departmental manager is creating a budget estimate for the
upcoming year. The manager would like to determine whether the data
will be available when the decisions for the next year have to be made.
Which characteristic of valuable data is the manager considering?
A. timely
B. thorough
C. accurate
D. reliable correct answer timely
A website logs the timestamp, location, and browser of every visitor. It
then aggregates this content into peak traffic times and days, minimum
and maximum hits for each country and region, and popularity of
certain browsers among visitors.
What is the timestamp considered in this scenario?
A. data
B. information
C. knowledge
,D. wisdom correct answer Data
An employee needs to edit a contract and prepare a hard copy for the
project team.
Which two peripheral devices should be used?
Choose 2 answers
A. printer
B. monitor
C. scanner
D. web camera correct answer printer and monitor
Armando is a freelance graphic designer. He has decided to create a
database of the artwork he has done throughout the years. Each of his
pieces of art is sorted using an assigned name and number.
Which data type will be required in order to create his database?
A. Numeric integer
B. Floating point
C. Boolean
D. Character string correct answer Character string
, How can an organization assist employees with the ethical use of
information technology?
A. By developing policies for information usage
B. By monitoring network throughput
C. By ensuring databases are backed up
D. By establishing optimal server performance correct answer By
developing policies for information usage
How does an interpreter work?
A. It relies on a session to complete its task.
B. It allows a programmer to easily test out changes to code.
C. It takes the most recently entered instructions, converts it into
machine language, and executes it.
D. It interprets instructions into pseudo code and executes it. correct
answer It takes the most recently entered instructions, converts it into
machine language, and executes it.
In what phase of a project does time estimation occur?
A. Initiation
B. Planning