Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 10 pages
Exam (elaborations)

CISEC Exam Questions with Detailed Verified Answers

Document preview thumbnail
Preview 2 out of 10 pages

CISEC Exam Questions with Detailed Verified Answers

Content preview

Page | 1



CISEC Exam Questions with Detailed
Verified Answers

Question: Stormwater control design goal
Answer: Minimize the discharge of pollutants in stormwater.


Question:SW control design factors
Answer: Expected amount and frequency of precipitation, soil type and range,
flow from impervious surfaces, slopes, and BMPs to control flow rates.


Question:Erosion and sediment control requirements
Answer: Provide and maintain natural buffers and/or equivalent erosion and
sediment controls for discharges to any receiving waters located within 50 feet
of the site's earth disturbances.


Question:Directing stormwater
Answer: Towards vegetated areas, maximize infiltration and filtering to
minimize pollutant discharges unless unadvisable due to geological factors
(GW contamination, karst geography, etc.)


Question:Installing perimeter controls
Answer: Must be installed upgradient of any natural buffers, extend on the
contour of a slope with ends curved upwards.


Question:Maintaining perimeter controls

, Page | 2

Answer: Remove sediment before it has accumulated to 1/2 the height of the
control, and if it is ineffective following a precipitation event: extend or repair
controls.


Question:Minimizing sediment track-out
Answer: Restricting vehicle use to designated points and installing tracking
controls like wheel washing, rumble plates, and 3-inch gravel.


Question:Managing stockpiles
Answer: Away from inlets or concentrated flow areas, install a sediment
barrier along downgradient areas, and if unused for 14+ days provide cover.


Question:Minimizing dust
Answer: On areas of exposed soil, apply water or other suppression
techniques.


Question:Soil health factors
Answer: Minimize steep slope disturbances, preserve native topsoil unless
infeasible, and minimize soil compaction.


Question:Inlet protection
Answer: Install protection measures that remove sediment from discharges
prior to entry (not required for sites with a sediment trap system); and clean or
replace protections as sediment accumulates.


Question:Chemical use and storage

Document information

Uploaded on
June 26, 2025
Number of pages
10
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
£11.16

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Ivie
3.4
(7)
Sold
34
Followers
1
Items
8525
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions