ACQ Exam 1 Questions And Answers |Latest
2025 | Guaranteed Pass
What is the last activity in the Life Cylcle process - Answer✔Disposal
What are the responsibilities of the DACM - Answer✔1. Establish and monitor training
requirements and DAWIA compliance 2. Certifies Dawia standards have been met
What are the 3 Risk factors - Answer✔Cost, Performance, Schedule
What is required for an Acquisition - Answer✔An Approved need
Systems Engineering is responsible for - Answer✔integration throughout the entire life cycle
What is the GOV role in systems engineering - Answer✔manage the total program
meet user needs
translate operational need into a system performance specification
When can technology be introduced into the life cycle - Answer✔At any point
Is a critical Acquisition position higher or lower on the pay grade - Answer✔Higher
1
, ©FYNDLAY 2025 ALL RIGHTS RESERVED 5:17 PM A+
When does the JCIDS process occur - Answer✔Before the acquisition process
What are the 3 steps to JCIDS methodology - Answer✔Capabilities based assessment
document of capability needs
review validation and approval
When is the Capabilities production Document (CPD) made - Answer✔in the engineering and
manufacturing development phase for use at milestone C
Whos is responsible for the budgeting phase of PPBE - Answer✔The Comptroller
Whos is responsible for the planning phase of PPBE - Answer✔UnderSecDefense
ACAT ID - Answer✔Review by defense Aqc Board (DAB) R@D >365m Pdn>2.19b Chair USD
ACAT IC and II - Answer✔Army System Acq requirements council (ASARC) R@D >140m
Pdn>660m Chair ASALT
ACAT III - Answer✔IPR chair PEO
What doc establishes thresholds of ACAT - Answer✔DODI 5000.02
ACAT level enables identification of - Answer✔Type of system
level of management
applicable program reporting requirements
Who is the milestone authority for CAT ID - Answer✔USD ATL
2