• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Start selling Create your account
Document preview thumbnail
Preview 2 out of 9 pages
Exam (elaborations)

PLC Practice Final Questions With Complete Solutions

Document preview thumbnail
Preview 2 out of 9 pages

PLC Practice Final Questions With Complete Solutions

Content preview

PLC Practice Final Questions With Complete Solutions

A counter ________ when the count goes down by 1.
a. reverses
b. increments
c. debases
d. decrements Correct Answers d. decrements

A network connects logic elements to perform a specific
function in a program. (T / F) Correct Answers TRUE

A programmed latching relay that is latched will become
unlatched if power is lost and then restored. (T / F) Correct
Answers FALSE

A(n) ________ occurs when the accumulated count exceeds the
upper limit.
a. system error
b. reset
c. overflow
d. increment Correct Answers c. overflow

An MCR can be used to control which of the following?
a. Selected circuit rungs (networks)
b. Entire circuits
c. Individual contacts within a rung (network)
d. Both a and b Correct Answers d. Both a and b

An object used to change the position of DIP switches should be
________.
a. soft

, b. magnetic
c. nonconductive
d. sterile Correct Answers c. nonconductive

As scan time increases, so does the accuracy of any programmed
timers. (T / F) Correct Answers TRUE

Based on the condition of the input device and the program
instruction shown, the logic of the contact is false. (T / F)
Correct Answers FALSE

Because programmed latch and unlatch instructions are
retentive, they are unaffected by the loss of power to the system.
(T / F) Correct Answers TRUE

Contacts wired in parallel have an OR relationship. (T / F)
Correct Answers TRUE

Contacts wired in series have an OR relationship. (T / F)
Correct Answers FALSE

Devices that are intended to perform a START function are
normally wired in series with each other. (T / F) Correct
Answers FALSE

Devices that are intended to perform a STOP function are
normally wired in parallel with each other. (T / F) Correct
Answers FALSE

File Number 4 in the PLC-5 structure holds what kind of data?
a. Ladder logic

Document information

Uploaded on
March 6, 2025
Number of pages
9
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
£8.94

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Classroom
4.0
(1207)
Sold
4981
Followers
3242
Items
56301
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions