Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 27 pages
Exam (elaborations)

HSI Final Test Questions With Verified Answers

Document preview thumbnail
Preview 3 out of 27 pages

©THESTAR EXAM SOLUTIONS 2024/2025 ALL RIGHTS RESERVED. HSI Final Test Questions With Verified Answers The initial response to a frequency deviation is due to which of the following 1. Load / frequency response 2. AGC 3. Governor action 4. Interchange schedules •3 and 4 •1 and 2 •2 and 3 •1 and 3 - Answers•1 and 3 EMS and AGC have failed at 12:25 and generation must be controlled manually. The operator calculates ACE to be +25 MWs. Load is expected to increase 100 MWs, and imports will increase by 75 MWs at the top of the hour. What should the operator do? •Maintain current generation level •Decrease generation by 25 MWs •Decrease generation by 50 MWs •Increase generation by 25 MW - Answers•Decrease generation by 25 MWs How is the Frequency Response Measure (FRM) of a Balancing Authority determined? •lt is the average of the BA's frequency response for all the frequency deviations of the previous year ©THESTAR EXAM SOLUTIONS 2024/2025 ALL RIGHTS RESERVED. •lt is the change in the BA's Net Interchange Actual for the largest frequency deviation during the previous year •lt is the previous year's Control Performance Standard 1 ( CPS1 ) score •It is the median of the BA's frequency response for the frequency deviation events identified by NERC for the previous year - Answers•It is the median of the BA's frequency response for the frequency deviation events identified by NERC for the previous year Sufficient Operating Reserve is defined as the capacity required to meet what? •DOE specifications •CPS and DCS •CPS 1 & 2 only •Capacity Standard - Answers•CPS and DCS In your Interconnection , a generator tripped that was large enough to reduce the frequency from 60.00 Hz to 59.94 Hz . Your Balancing Authority's Frequency Bias is -200 MW / 0.1 Hz . How many MW would your system initially contribute to frequency support? •120 MW •80 MW •100 MW •200 MW - Answers•120 MW Interconnection frequency is 59.80 Hz . Your ACE is a large negative value and your AGC is pulsing your units down . What should you do •Leave AGC in operation but investigate •Place AGC in constant frequency control •Place AGC in flat tie line control •Suspend AGC and investigate - Answers•Suspend AGC and investigate When a Balancing Authority's ACE value is the same sign as the frequency deviation , which NERC control performance score is affected negatively ©THESTAR EXAM SOLUTIONS 2024/2025 ALL RIGHTS RESERVED. •DCS •CPS 1 •TEC •BAAL - Answers•CPS 1 Correct Of the following , which control system would be affected by a difference in Net Actual Interchange and Net Scheduled Interchange •Reactive Control •Turbine Governor Control •Automatic Generation Control •Automatic Voltage Regulator - Answers•Automatic Generation Control Balancing Authority A is currently reading a system frequency of 59.98 Hz . Its Net Actual Interchange is +100 MW and its Net Scheduled Interchange is +100 MW . If Balancing Authority A's frequency bias setting is 100 MW / 0.1 HZ , what is ACE • -20 •20 •2 •0 - Answers• -20 A Balancing Authority has twenty units on governor control . The units have different capacities that range from 200 MW to 1000 MW and droop settings from 2 % to 5 % . The biggest adjustments in megawatt output in response to a frequency disturbance will be provided by units that have _______________? •large capacity and small droop setting •large capacity and large droop setting •small capacity and small droop setting •small capacity and large droop setting - Answers•large capacity and small droop setting Balancing Authority A is scheduled to import 300 MW but is only importing 260 MW . Interconnection frequency is 59.94 and Balancing Authority A's Frequency Bias Setting is -120 MW / 0.1 Hz What is Balancing Authority A's ACE reading?

Content preview

©THESTAR EXAM SOLUTIONS 2024/2025
ALL RIGHTS RESERVED.


HSI Final Test Questions With Verified
Answers


The initial response to a frequency deviation is due to which of the following
1. Load / frequency response
2. AGC
3. Governor action
4. Interchange schedules


•3 and 4
•1 and 2
•2 and 3
•1 and 3 - Answers✔•1 and 3
EMS and AGC have failed at 12:25 and generation must be controlled manually. The operator
calculates ACE to be +25 MWs. Load is expected to increase 100 MWs, and imports will
increase by 75 MWs at the top of the hour. What should the operator do?


•Maintain current generation level
•Decrease generation by 25 MWs
•Decrease generation by 50 MWs
•Increase generation by 25 MW - Answers✔•Decrease generation by 25 MWs
How is the Frequency Response Measure (FRM) of a Balancing Authority determined?


•lt is the average of the BA's frequency response for all the frequency deviations of the previous
year

, ©THESTAR EXAM SOLUTIONS 2024/2025
ALL RIGHTS RESERVED.
•lt is the change in the BA's Net Interchange Actual for the largest frequency deviation during
the previous year
•lt is the previous year's Control Performance Standard 1 ( CPS1 ) score
•It is the median of the BA's frequency response for the frequency deviation events identified by
NERC for the previous year - Answers✔•It is the median of the BA's frequency response for the
frequency deviation events identified by NERC for the previous year
Sufficient Operating Reserve is defined as the capacity required to meet what?


•DOE specifications
•CPS and DCS
•CPS 1 & 2 only
•Capacity Standard - Answers✔•CPS and DCS
In your Interconnection , a generator tripped that was large enough to reduce the frequency from
60.00 Hz to 59.94 Hz . Your Balancing Authority's Frequency Bias is -200 MW / 0.1 Hz . How
many MW would your system initially contribute to frequency support?


•120 MW
•80 MW
•100 MW
•200 MW - Answers✔•120 MW
Interconnection frequency is 59.80 Hz . Your ACE is a large negative value and your AGC is
pulsing your units down . What should you do


•Leave AGC in operation but investigate
•Place AGC in constant frequency control
•Place AGC in flat tie line control
•Suspend AGC and investigate - Answers✔•Suspend AGC and investigate
When a Balancing Authority's ACE value is the same sign as the frequency deviation , which
NERC control performance score is affected negatively

, ©THESTAR EXAM SOLUTIONS 2024/2025
ALL RIGHTS RESERVED.
•DCS
•CPS 1
•TEC
•BAAL - Answers✔•CPS 1
Correct Of the following , which control system would be affected by a difference in Net Actual
Interchange and Net Scheduled Interchange


•Reactive Control
•Turbine Governor Control
•Automatic Generation Control
•Automatic Voltage Regulator - Answers✔•Automatic Generation Control
Balancing Authority A is currently reading a system frequency of 59.98 Hz . Its Net Actual
Interchange is +100 MW and its Net Scheduled Interchange is +100 MW . If Balancing
Authority A's frequency bias setting is 100 MW / 0.1 HZ , what is ACE


• -20
•20
•2
•0 - Answers✔• -20
A Balancing Authority has twenty units on governor control . The units have different capacities
that range from 200 MW to 1000 MW and droop settings from 2 % to 5 % . The biggest
adjustments in megawatt output in response to a frequency disturbance will be provided by units
that have _______________?


•large capacity and small droop setting
•large capacity and large droop setting
•small capacity and small droop setting
•small capacity and large droop setting - Answers✔•large capacity and small droop setting
Balancing Authority A is scheduled to import 300 MW but is only importing 260 MW .
Interconnection frequency is 59.94 and Balancing Authority A's Frequency Bias Setting is -120
MW / 0.1 Hz What is Balancing Authority A's ACE reading?

Document information

Uploaded on
December 20, 2024
Number of pages
27
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
£9.22

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TheStar
3.7
(140)
Sold
717
Followers
178
Items
27601
Last sold
2 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions