AIC Practice Test Latest Update. What would be the most appropriate means for the contractor to communicate to the project owner an unforeseen condition not identified in the soils report? A. Document the issue in the job diary B. Issue a jobsite memorandum C. Draft a construction report D. Write a formal business letter - CORRECT ANSWER D. Write a formal business letter When is the best time to distribute the working agenda to the participants of a meeting? A. As a follow-up to the meeting B. At the beginning of the meeting C. About one day after the meeting D. About one day prior to the meeting - CORRECT ANSWER D. About one day prior to the meeting The contractor has tasked his project engineer with developing an agenda for a preconstruction meeting with the architect and owner. The project engineer has received numerous emails and RFIs from subcontractors and vendors requesting a wide range of information. Which document is most appropriate to distinguish between appropriate topics for the meeting and topics better addressed through other means? A. General conditions B. General requirements C. Technical specifications D. Supplementary conditions - CORRECT ANSWER B. General requirements What is the best time to distribute the meeting minutes to the participants? A. At the beginning of the meeting B. About one day after the meeting C. About one hour prior to the meeting D. About one day prior to the meeting - CORRECT ANSWER B. About one day after the meeting Which of the following statements is true about the use of texting as a means of communicating in the construction industry? A. A means of easily and effectively documenting communication B. Appropriate for clarifying but not for formal direction C. Should be completely avoided in construction D. Acceptable for communication if specifically allowed in the contract - CORRECT ANSWER B. Appropriate for clarifying but not for formal direction A subcontractor identifies a significant discrepancy between the architectural and structural drawings. The subcontractor immediately meets with the general contractor at their construction trailer to discuss the discrepancy. The general contractor agrees that this could be a significant change depending on which of the drawings describes the designer's intent. Which of the following actions is the most appropriate in this situation? A. Draft a change order proposal and arrange a meeting with the design team and owner to resolve the conflict. B. Draft an RFI that describes the discrepancy in detail and submit it to the architect immediately. C. Send a short text alerting the design team of the issue and discuss the discrepancy in detail at the next meeting. D. Email the engineer of record to collect relevant background information and follow up with a formal RFI to the architect - CORRECT ANSWER B. Draft an RFI that describes the discrepancy in detail and submit it to the architect immediately. What are the leadership skills needed to conduct a productive meeting? A. Planning, probing questions, responding critically, and decision making B. Planning, timing, coordinating, probing, responding critically, and following up C. Listening attentively, responding constructively, soliciting all ideas, and matching decision making to the situation D. Coordinating, listening selectively, responding critically, soliciting supportive ideas, and adjusting decision making to the situation - CORRECT ANSWER C. Listening attentively, responding constructively, soliciting all ideas, and matching decision making to the situation Which of the following statements made by the indicated parties below would least likely be made at an owner/architect/contractor progress meeting?

Content preview

AIC Practice Test Latest Update.
What would be the most appropriate means for the contractor to communicate to the project owner an
unforeseen condition not identified in the soils report?

A. Document the issue in the job diary

B. Issue a jobsite memorandum

C. Draft a construction report

D. Write a formal business letter - CORRECT ANSWER D. Write a formal business letter



When is the best time to distribute the working agenda to the participants of a meeting?

A. As a follow-up to the meeting

B. At the beginning of the meeting

C. About one day after the meeting

D. About one day prior to the meeting - CORRECT ANSWER D. About one day prior to the meeting



The contractor has tasked his project engineer with developing an agenda for a preconstruction meeting
with the architect and owner. The project engineer has received numerous emails and RFIs from
subcontractors and vendors requesting a wide range of information. Which document is most
appropriate to distinguish between appropriate topics for the meeting and topics better addressed
through other means?

A. General conditions

B. General requirements

C. Technical specifications

D. Supplementary conditions - CORRECT ANSWER B. General requirements



What is the best time to distribute the meeting minutes to the participants?

A. At the beginning of the meeting

B. About one day after the meeting

C. About one hour prior to the meeting

D. About one day prior to the meeting - CORRECT ANSWER B. About one day after the meeting

,Which of the following statements is true about the use of texting as a means of communicating in the
construction industry?

A. A means of easily and effectively documenting communication

B. Appropriate for clarifying but not for formal direction

C. Should be completely avoided in construction

D. Acceptable for communication if specifically allowed in the contract - CORRECT ANSWER B.
Appropriate for clarifying but not for formal direction



A subcontractor identifies a significant discrepancy between the architectural and structural drawings.
The subcontractor immediately meets with the general contractor at their construction trailer to discuss
the discrepancy. The general contractor agrees that this could be a significant change depending on
which of the drawings describes the designer's intent. Which of the following actions is the most
appropriate in this situation?

A. Draft a change order proposal and arrange a meeting with the design team and owner to resolve the
conflict.

B. Draft an RFI that describes the discrepancy in detail and submit it to the architect immediately.

C. Send a short text alerting the design team of the issue and discuss the discrepancy in detail at the
next meeting.

D. Email the engineer of record to collect relevant background information and follow up with a formal
RFI to the architect - CORRECT ANSWER B. Draft an RFI that describes the discrepancy in detail and
submit it to the architect immediately.



What are the leadership skills needed to conduct a productive meeting?

A. Planning, probing questions, responding critically, and decision making

B. Planning, timing, coordinating, probing, responding critically, and following up

C. Listening attentively, responding constructively, soliciting all ideas, and matching decision making to
the situation

D. Coordinating, listening selectively, responding critically, soliciting supportive ideas, and adjusting
decision making to the situation - CORRECT ANSWER C. Listening attentively, responding constructively,
soliciting all ideas, and matching decision making to the situation



Which of the following statements made by the indicated parties below would least likely be made at an
owner/architect/contractor progress meeting?

, A. Contractor: "There are 14 unanswered RFIs on the log."

B. Superintendent: "A third party inspector will assist the supervision of the roofing installation."

C. Owner: "It is very likely, that change order proposal #23 will be accepted."

D. Project manager: "The bond rate for ABC subcontractor is 1.45%" - CORRECT ANSWER D. Project
manager: "The bond rate for ABC subcontractor is 1.45%"



What is a listener's retention percentage of an oral conversation?

A. 10%

B. 50%

C. 60%

D. 90% - CORRECT ANSWER A. 10%



Which of the following is the best example of an open-ended question?

A. Do you understand what work is supposed to be completed?

B. Do you know which shovel to get me from the tool shed?

C. What steps are you going to take to complete the activity?

D. How do you feel about completing the activities assigned? - CORRECT ANSWER B. Do you know which
shovel to get me from the tool shed?



Which of the following communication methods is the most effective way to know that the
communication has been understood?

A. The sender should ask closed-ended questions and tell the receiver twice.

B. The sender should ask open-ended questions and make them speak.

C. The sender should ask how they feel and their attitude toward the activity.

D. The sender should tell them what to do and get them back to work quickly. - CORRECT ANSWER C.
The sender should ask how they feel and their attitude toward the activity.



Which of the following statements about the following organizations and their justifications of its use is
most appropriate when designers develop project specifications?

A. Organize building materials by International Building Code chapters to facilitate inspections by the
authority having jurisdiction.

Document information

Uploaded on
December 13, 2024
Number of pages
27
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
£9.59

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ROSEGRADES
3.4
(35)
Sold
236
Followers
87
Items
12121
Last sold
2 weeks ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions