• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Start selling Create your account
Document preview thumbnail
Preview 2 out of 6 pages
Exam (elaborations)

ICC AST Installation/ Retrofitting

Document preview thumbnail
Preview 2 out of 6 pages

ICC AST Installation/ Retrofitting

Content preview

ICC AST Installation/ Retrofitting
QUESTION AND ANSWERS
to allow passage between tanks for inspection provide a minimum of? - -1/6
of the sum of the adjacent tank diameters, but not less then 3 feet.

-pressure vacuum vents remain normally closed, only opened when the
pressure inside the tank reaches? - -2 through 16 ounces per square Inch or
a vacuum of 0.5 through 1.0 ounces per square inch.

-the primary criterion for tank foundation design is the allowable bearing
pressure of soil. - -this ranges from 1,000 pounds per square foot for soft clay
or 4,000 for coarse, compacted gravel

-nominal vent must be at least? - -2" nominal pipe size.

-operating/ design pressure

shop built tanks are designed for operating pressures between atmospheric
and 1.0 psig. in order for air and vapor to be expelled from a tank during
filling, the internal pressure must increase to at least? - -the pressure setting
of the venting device. usually 2 ounces to 1 pound per square inch above
atmospheric pressure.

-pressure/ vacuum vents remain normally closed only when the pressure in
the tanks reaches a predetermined pressure setting of? - -2 through 16
ounces per square inch or a vacuum of 0.5 through 1.0 ounces per square
inch.

-in order for air to enter a tank during liquid withdrawal the internal tank
pressure must be reduced to a pont where? - -It is at least 1 ounce below
atmospheric pressure.

-A suitable foundation for vertical tanks can be constructed with a finished
course of clean, compacted sand, gravel or crushed rock that is placed over
the base course. The base and the Finnish courses should extend at least? - -
12" beyond the perimeter of the tank.

---

-to provide drainage and settlement the surface of which the tank bottom
rests should be at least? - -6" above the surrounding ground surface.

, -Saddle supports for horizontal tanks may be constructed of? - -Steel or
reinforced concrete and must be installed on a firm and suitable foundation.

-Fire codes require that tank saddles are? - -higher than 12" above the
foundation. have a minimum fire rating of 2 hours and be constructed of
protected steel, masonary or reinforced concrete.

-roofing felt or expansion joint is not an acceptable electrical isolation for
tank saddles. - -

-Reinforced concrete slabs are 6 to 12 inches thick and constructed to meet
28 day, minimum 3,000 psi strength requirement. - -

-when grounding a tank use #4 solid or stranded cable. - -use #12 TW or
THHN thin stranded or solid wire to bond components

-the minimum opening in a vault for personal entry should be a diameter of
at least? - -30"

-normal tank vent should extend not less then? - -12' above the general
grade level and be located at least 5 feet from building openings. emergency
vents may discharge inside vault but must remain vapor tight during normal
operation.

-Emergency shut off switch must be located between 20 and 100 feet from
the dispensers. - -

-enclosed wiring within class 1 division 1 areas must use a maximum 3' long
of explosion proof flexible fittings. - -

-Access manways that are intended for personal entry into a tank must be at
least 24" diameter. - -

-When using galvanic cathotic protection for tank bottoms the anodes should
be 1' outside the tank perimeter and at least 18" lower than the tank bottom.
Anodes may be placed horizontally or vertically. - -place anodes 3 to 5 feet
from piping and 2 to 3 feet below grade but outside of the piping trench in
native soil.

-If lifting a tank make sure that the angle between the chain and vertical
does not exceed 30 degrees - -

-galvanic anode installation. - -remove and discard any waterproof packaging
and inspect the anodes for shipping and and handling damage. verify anode
is centered in the prepackaged low-resistivity backfill material. test the

Document information

Uploaded on
November 14, 2024
Number of pages
6
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
£8.45

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
0
Followers
0
Items
33
Last sold
-



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions