100% satisfaction guarantee Immediately available after payment Read online or as PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

ertification Exam (4).

Rating
-
Sold
-
Pages
5
Grade
A+
Uploaded on
22-06-2024
Written in
2023/2024

ACI Certification Exam (4).

Content preview

ACI Certification Exam
2. T/F: When the concrete contains large aggregate, the testing technician should wet-sieve the
sample before making unit weight tests for use in yield computations. - ANS-False

4. T/F: Samples smaller than 28L (1 cu.ft.) are allowed on routine air content, temperature, and
slump tests. - ANS-True

7. How do you regulate the rate of discharge of the batch from the revolving truck drum mixer or
agitator? - ANS-By the rate of revolution of the drum

10. While the technician is checking the slump of the concrete, there is a decided falling away or
shearing off of the concrete from one side of the sample. What should the technician do? -
ANS-Disregard the test and retest on another portion of the sample

11. The mold is filled in three equal layers by volume, which makes the first third at _______,
and the second third at ________. - ANS-2 5/8, 6 1/8

15. What is the difference allowed by ACI when certifying an individual test using a plastic slump
cone vs. a metal slump cone? - ANS-0.5 inches

16. T/F: The sides of the slump mold should be lightly tapped to consolidate the concrete in the
mold. - ANS-False

18. T/F: ASTM C 1064 defines the maximum recommended temperature for concrete. -
ANS-False

19. The temperature test method must be complete with in _________ after obtaining the
sample. - ANS-5 minutes

20. Each temperature-measuring device should be calibrated ________, or whenever there is a
question of _________. - ANS-annually, accuracy

23. T/F: After strike off of the measure used to determine density, a small quantity of concrete
may be added to correct a deficiency? - ANS-False

26. What is the required shape at the end of the tamping rod? - ANS-rounded to a
hemispherical tip

28. How do you find the density of a concrete batch? - ANS-(mass of measure with concrete -
mass of measure) / volume of measure

, 29. How do you find the yield of a concrete batch? - ANS-(mass of all materials batched /
(density of concrete * 27))

33. T/F: Test method ASTM C231 is intended for use with all concretes and aggregates for
which an aggregate correction factor can be determined - ANS-False

34. T/F: The petcocks are closed before pumping any air into the chamber on the type B meter.
- ANS-False

36. The sample is obtained in accordance to ASTM C ___________. - ANS-172

37. If the aggregate correction factor for a given source of fine and coarse aggregate is found to
be 0.2% in a pressure air meter, and an air content value of 5.0% is read on the gauge of the
same air meter containing concrete with the same aggregate, what is the correct air content? -
ANS-4.8%

39. If the sample is vibrated the duration of vibration should last ___________. - ANS-Until the
surface concrete is smooth

40. The maximum size aggregate for this test is _________. - ANS-2''

41. If the aggregate is too large, it must be ________________. - ANS-Wet sieved over the 1
1/2" sieve

42. The minimum size of the measure is ________________________. - ANS-Dependant upon
the nominal maximum coarse aggregate size

43. At the end of the pressure method procedure, how is the pressure released from the Type B
air meter? - ANS-Opening both petcocks

46. T/F: ASTM 173 is appropriate for testing concretes containing lightweight aggregates. -
ANS-True

47. T/F: ASTM 173 specifies that at the very end of the test the tester must make sure that there
are portions undisturbed in the bottom of the bowl, if so the test is valid. - ANS-False

48. The maximum size aggregate for this test is _________. - ANS-1 1/2''

49. If the second reading after rolling and rocking differs by more than 0.25% from the first,
_______________. - ANS-Rock and roll the meter again

50. You added 2 pints of alcohol to the roll-a-meter before you started. Your final reading after
competing the test is 5.5% air. What is the recorded air reading? - ANS-5.5% air

Document information

Uploaded on
June 22, 2024
Number of pages
5
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Ace360PRO Stuvia
View profile
Follow You need to be logged in order to follow users or courses
Sold
242
Member since
1 year
Number of followers
2
Documents
10541
Last sold
1 week ago

4.8

89 reviews

5
76
4
9
3
3
2
1
1
0

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions