100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

DCASE Chapter 3 Test

Rating
-
Sold
-
Pages
9
Grade
A+
Uploaded on
04-06-2024
Written in
2023/2024

DCASE Chapter 3 Test










Whoops! We can’t load your doc right now. Try again or contact support.

Document information

Uploaded on
June 4, 2024
Number of pages
9
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

DCASE Chapter 3 Test
Principles of DC Organization - ANS--Self sufficiency
-Centralized Control
-Specialization
-Endurance
-Continuity of Command

DC central - ANS--Direct damage control efforts
-Report damage to the CO
-Request permission from CO
-Central watertight integrity, flooding, counter flood, and dewatering

Repair Lockers - ANS--Command and control
-Containment
-Combat damage

Repair Locker Numbering and Descriptions - ANS-Repair 1 - Main deck
Repair 5 - Ship propulsion
Repair 6 - Ordinance and magazine protection
Repair 7 - Galley deck and island structure
Repair 8 - Electronics

Way to navigate around the ship during BDS - ANS-Up, forward, and STBD
Down, aft, and port

Total ship survivability - ANS-Must be the whole crew

Total Ship Survivability Trials - ANS-1. Central damage
2. Threat casualties
3. Reconfigure ship's systems
4. Regain mission capability
5. Continue to fight

Ship's Priority: Peace Time - ANS--Return to port
-Crew Safety

Ship's Priority: War Time - ANS-1. Fight
2. Move

, 3. Float

DC Organizational Priorities - ANS-1. Fire
2. Flooding
3. Equipment
4. Personnel

Survivability Considerations - ANS-1. Command, central, and comms
2. Intense heat and smoke
3. Personnel casualties
4. System restoration ( ELECTRICAL POWER!!!)
5. Material Stowage

General Emergency Bill
4 Basic Scenarios - ANS-1. With full crew (inport or underway)
2. Inport with partial crew
3. CBR attack
4. Abandon ship

Condition I (General Quarters) - ANS--Condition II did not work
-Man the main BDS
-Damage is severe to the point that it needs the whole crew to combat the casualty

Condition II DC - ANS--Flying squad did not work
-Man up main BDS
(if GQ is ordered remain on station until relieved)

Condition III - ANS--Flying squad handles
-No BDS required

Major Conflagration - ANS--Damage of a magnitude that cannot be handled by
conventional DC organization
-Multi casualty (fire, flood, personnel)
-All hands

Rescue and Assistance Detail Primary Missions - ANS--Rescue personnel from water
-Assists another unit in distress
-Assist persons or activities in distress ashore

Sound Powered Phones & Circuits - ANS--No reliance on external power source
£7.66
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
AASOCR

Get to know the seller

Seller avatar
AASOCR American InterContinental University
View profile
Follow You need to be logged in order to follow users or courses
Sold
6
Member since
2 year
Number of followers
2
Documents
4846
Last sold
7 months ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions