ACQ EXAM 1 QUESTIONS WITH CORRECT ANSWERS|100% verified
ACQ EXAM 1 QUESTIONS WITH CORRECT ANSWERS What is the last activity in the Life Cycle process CORRECT ANSWER Disposal What are the responsibilities of the DACM CORRECT ANSWER 1. Establish and monitor training requirements and DAWIA compliance 2. Certifies Dawia standards have been met What are the 3 Risk factors CORRECT ANSWER Cost, Performance, Schedule What is required for an Acquisition CORRECT ANSWER An Approved need Systems Engineering is responsible for CORRECT ANSWER integration throughout the entire life cycle What is the GOV role in systems engineering CORRECT ANSWER manage the total program meet user needs translate operational need into a system performance specification When can technology be introduced into the life cycle CORRECT ANSWER At any point Is a critical Acquisition position higher or lower on the pay grade CORRECT ANSWER Higher When does the JCIDS process occur CORRECT ANSWER Before the acquisition process What are the 3 steps to JCIDS methodology CORRECT ANSWER Capabilities based assessment document of capability needs review validation and approval When is the Capabilities Production Document (CPD) made CORRECT ANSWER in the engineering and manufacturing development phase for use at milestone C
Written for
- Institution
- ACQ
- Module
- ACQ
Document information
- Uploaded on
- April 22, 2024
- Number of pages
- 8
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
acq exam 1