Project Planning
Introduction
The report will provide a timeline of tasks, which will be able to be viewed in the logbook.
The chosen method will be used to plan the steps of the chosen investigative project, which
will also include the materials, equipment and instruments used in order to complete the
investigative project. In cases of missing materials or equipment, the contingency plan will
be required to continue on with the investigative project to allow for completion. Along with
the finalised method, a risk assessment, health and safety and ethical considerations, in
order to remain confidential and report any consents required to complete the project.
Justification of effectiveness of the investigative project and any changes made to the
timeline, method or contingency plan will be available in the logbook.
Health and Safety, Risk Assessment and Equipment for Working Plan- P3
Chemical/other laboratory materials Risk Assessment
Title of procedure: Investigating the Effect of Temperature on
Pectinase enzyme catalase breakdown of Pectin.
Assessment prepared by: Diana Duka Signed: Diana Duka
Date: 28/02/2023
Chemical
Pectinase
Solution
(2%)
Hazard
No
Fire risk
Yes
Toxic/ Harmful
, Yes
Corrosive
Yes
Irritant
No
Carcinogenic
No
Pressure/Vacuum
No
Other
Control measures
No
Keep away from sources of
ignition
Yes
Wear gloves
Yes
Wear eye protection
Yes
Wear protective clothing
No
Wear face mask
No
Use in fume cupboard
No
Use under supervision
Yes
Special waste disposal
necessary
No
Other
Risks posed by procedure:
Low risks of respiratory irritation and sensations.
May cause asthma and/or allergic symptoms/ breathing difficulties
if inhaled at large doses under long periods of exposure.
High risks of eye damage and irritation.
Control measures:
Use PPE (protective clothing, eye protection and disposable latex
gloves).
Clean area after using the chemical and dispose of equipment used
in a chemical waste bin.
Unit 6
Assignment B
Investigative Project
B: Produce a Plan for An Investigative Project based on the Proposal.
Project Planning
Introduction
The report will provide a timeline of tasks, which will be able to be viewed in the logbook.
The chosen method will be used to plan the steps of the chosen investigative project, which
will also include the materials, equipment and instruments used in order to complete the
investigative project. In cases of missing materials or equipment, the contingency plan will
be required to continue on with the investigative project to allow for completion. Along with
the finalised method, a risk assessment, health and safety and ethical considerations, in
order to remain confidential and report any consents required to complete the project.
Justification of effectiveness of the investigative project and any changes made to the
timeline, method or contingency plan will be available in the logbook.
Health and Safety, Risk Assessment and Equipment for Working Plan- P3
Chemical/other laboratory materials Risk Assessment
Title of procedure: Investigating the Effect of Temperature on
Pectinase enzyme catalase breakdown of Pectin.
Assessment prepared by: Diana Duka Signed: Diana Duka
Date: 28/02/2023
Chemical
Pectinase
Solution
(2%)
Hazard
No
Fire risk
Yes
Toxic/ Harmful
, Yes
Corrosive
Yes
Irritant
No
Carcinogenic
No
Pressure/Vacuum
No
Other
Control measures
No
Keep away from sources of
ignition
Yes
Wear gloves
Yes
Wear eye protection
Yes
Wear protective clothing
No
Wear face mask
No
Use in fume cupboard
No
Use under supervision
Yes
Special waste disposal
necessary
No
Other
Risks posed by procedure:
Low risks of respiratory irritation and sensations.
May cause asthma and/or allergic symptoms/ breathing difficulties
if inhaled at large doses under long periods of exposure.
High risks of eye damage and irritation.
Control measures:
Use PPE (protective clothing, eye protection and disposable latex
gloves).
Clean area after using the chemical and dispose of equipment used
in a chemical waste bin.