Contents
REDUCES THICKNESS REQUIREMENTS (T ≠ P)............................................................................................................4
Strip Foundation
Characteristics:
Load distributed along a continuous ‘strip’ of concrete, wider than
the bearing wall (to reduce pressure applied to the bearing stratum)
Needs level ground – common strip
Construction Assembly:
1. Strip of concrete
Placed within an open excavation
Positioned centred under load-bearing walls
, Dimensions:
Founding Depth
o Depth of underside of foundation, below ground level
o Determined by building loads, in combination with suitable
bearing strata and Building Regulation “Approved Documents”.
o Factors:
Frost
-min 450mm
-600mm (better, especially in sands and chalks)
Seasonal Movement
-Clays prone to moisture expansion/contraction within
1000mm of surface.
Trees/Vegetation present near foundation
-Closer/Taller tree = deeper foundation
Water Main Supply
-Requires min 750mm ground cover to avoid freezing
-If higher than 750mm, insulated pipe needed
-Should enter through wall above strip foundation to avoid
damage
REDUCES THICKNESS REQUIREMENTS (T ≠ P)............................................................................................................4
Strip Foundation
Characteristics:
Load distributed along a continuous ‘strip’ of concrete, wider than
the bearing wall (to reduce pressure applied to the bearing stratum)
Needs level ground – common strip
Construction Assembly:
1. Strip of concrete
Placed within an open excavation
Positioned centred under load-bearing walls
, Dimensions:
Founding Depth
o Depth of underside of foundation, below ground level
o Determined by building loads, in combination with suitable
bearing strata and Building Regulation “Approved Documents”.
o Factors:
Frost
-min 450mm
-600mm (better, especially in sands and chalks)
Seasonal Movement
-Clays prone to moisture expansion/contraction within
1000mm of surface.
Trees/Vegetation present near foundation
-Closer/Taller tree = deeper foundation
Water Main Supply
-Requires min 750mm ground cover to avoid freezing
-If higher than 750mm, insulated pipe needed
-Should enter through wall above strip foundation to avoid
damage