Exam (elaborations)

Med Gas Installer 6010 Exam | Questions & Verified Answers | Comprehensive Medical Gas Installer 6010 Certification Exam Review Study Guide PDF | 2026

Document preview thumbnail
Preview 3 out of 18 pages

Prepare for your Med Gas Installer 6010 Exam with this comprehensive study guide featuring exam questions and verified answers designed to strengthen your understanding of medical gas and vacuum system installation, testing, and safety requirements. This detailed review covers essential topics including NFPA 99 requirements, medical gas and vacuum piping, Category 1 and Category 2 systems, source equipment, outlets and inlets, zone valve assemblies, alarms, pipe sizing, pressure requirements, brazing procedures, joints and connections, installation practices, identification and labeling, pressure testing, system verification, inspection, documentation, maintenance, safety procedures, and professional installer responsibilities. Ideal for 6010 medical gas installer certification candidates, medical gas technicians, plumbing professionals, contractors, inspectors, engineers, and healthcare facility personnel, this resource is perfect for preparing for certification exams, practice tests, quizzes, and comprehensive MedGas installer assessments while improving knowledge retention, strengthening technical skills, and maximizing exam readiness.

Content preview

Med Gas Installer 6010 Exam
In-line check valves shall have threaded purge points of 1/8 inch
____ NPT



Mains & branches in medical gas systems shall be no less 1/2 inch
than ____



Drops to station outlets and inlets shall be no less than 1/2 inch
____ NPS



Copper outlet tubes on station inlets shall be no less than 1/2 inch
____ O.D.



Connecting tubing for gauges and alarm devices shall be 1/4 inch
permitted to be ____ NPS



Category 1 Dental Facilities utilizing General anesthesia & Deep sedation




Instrument air standby headers shall be sufficient for ____ 1 hour
of normal operation from attached cylinder



Reserves cylinders for Liquid Ring compressors shall be 1-hour
sufficient for ____ normal operation, when installed



Quality of medical air shall not have permanent 1 Micron
particulates sized ____ or larger in the air



Defective joints are allowed to be reheated ____ time one
before it must be replaced



Manufactured assemblies are subject to a standing 1%
pressure test to ensure a less than ____ loss in pressure



Oxygen analyzers shall read that there is less than ____ 1% oxygen
concentration in the system before any brazing can begin



Fittings may be re-cleaned on-site using a solution of ____ 1
pound of sodium carbonate to 3 gallons of water



Category ____ space is one in which failure of equipment 1
or a system is likely to cause major injury or death of
patients, staff, or visitors


Only ____ service valve is required off the riser for each one
branch

, Med Gas Installer 6010 Exam
The installation of cryogenic fluid central supply systems M-1
shall be compliant with CGA ____



The outdoor location of bulk cryogenic liquid central M-1
systems shall be compliant with CGA ____



Reciprocating compressors shall provide an inspection 1.5
opening no smaller than ____ shaft diameter in size



Category dental 2 initial pressure test for oxygen and 1.5
nitrous oxide shall ____ times operating pressure



Instrument air filters shall be sized to allow for ____ of 100%
system design peak demand



Flammable liquid has a flash point below ____ degrees 100
Fahrenheit



Final line pressure regulators shall be sized for ____ of 100%
peak demand



EOSC shall have an inlet that allows for ____ of the 100%
system demand



Medical air filters shall be sized for ____ system peak 100%
demand



Medical aid dryers used in medical air compressors shall 100%
be sized for ____ of peak demand



NFPA ____ is the life and safety code for med gas facilities 101




Cylinders in use and in storage shall be prevented from 125
reaching temperatures in excess of ____ degrees
Fahrenheit


Medical gas piping may be located within tunnels with fuel 130
gas lines or electrical lines if the ambient temperature is
limited to ____ degrees Fahrenheit


Initial pressure test shall be ____ times the operating 1.5, 150 psi
pressure but no less than ____ gauge pressure



Manufactures assemblies hose or flexible connectors shall 1000 psi
have a minimum burst pressure of ____

, Med Gas Installer 6010 Exam
Metallic and non-metallic flex connectors shall have a 1000 psi
minimum burst pressure of ____



Medical gas rails (MGR) shall have a melting point of at 1000 degrees Fahrenheit
least ____



Central supply systems for carbon dioxide using 1000, G-6.1
permanently installed containers with product capacities
greater than ____lbs, shall comply with CGA ____


Braze joints shall have a temperature rating of no less than 1000 degrees Fahrenheit
____



Memory metal fittings shall have a temperature rating point 1000 degrees Fahrenheit
of no less than ____



Axial swaged fittings shall be able to withstand a 1000 degrees Fahrenheit
temperature of ____



Metallic flexible joint for seismic protection or thermal 1000 degrees Fahrenheit
expansion shall withstand temperatures of ____



Auxiliary connections shall be the same size as the main, 2 inch
but are not required to be larger than ____



Category ____ space: In which failure of equipment or a 2
system is likely to cause minor injury to patients, staff, or
visitors


Category ____ dental: facilities utilizing only moderate and 2
minimal sedation



Medical air supply systems shall have less than ____ of 2 ppm
halogenated hydrocarbons



Master alarm panels shall consists of ____ or more panels two




Liquid containers shall have visible identification with a 2 inch
minimum of letters ____ high



Manifolds for gas cylinders shall have ____ equal headers two




Manifolds header for gas cylinders shall have no fewer two
than ____ connections

Document information

Uploaded on
August 11, 2026
Number of pages
18
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
£7.61

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
estudegrades
5.0
(12)
Sold
28
Followers
1
Items
1225
Last sold
6 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions