LEED BD+C: ___ applies to buildings equipped to contain high-density computing
equipment such as server racks.
Give this one a try later!
Data Centers
An occupant who is in a building for 8 hours a day receives an FTE of __.
Give this one a try later!
1.0
In LEED v4, regional priorities were created using a(n) ___-based program.
,Give this one a try later!
geographic information systems
__ is all of the building water that is used for industrial purposes in building systems,
such as in boilers and cooling towers.
Give this one a try later!
Process water
What are three major concepts integral to both green buildings and sustainability that
are not a part of the conventional building process?
Give this one a try later!
Systems thinking, life-cycle thinking, and integrated process.
Scope 2 Energy
Give this one a try later!
Relates to purchased energy
The integration of sustainability into urban planning has given birth to the popular
term "__ city"
,Give this one a try later!
Sustainable
A building __ is the perimeter of a building as it meets the land on which it occupies.
Give this one a try later!
footprint
__ symptoms include headache; eye, nose, or throat irritation; dry cough; dry or itchy
skin; dizziness and nausea; and difficulty in concentrating.
Give this one a try later!
Sick building syndrome
The __ is the person (or entity) who is granted actual authority by the owner to register
the project and accept the certification agreeent.
Give this one a try later!
Agent
__ is caused by high-angled front lighting.
, Give this one a try later!
Glare
With a(n) __ loop, systems self-correct and stay within a particular set of parameters.
Give this one a try later!
negative
The __ category is meant for project teams who wish to se new credit ideas or exceed
existing credits.
Give this one a try later!
Innovation
Reclaimed water systems are identified by __ pipes and valve box covers.
Give this one a try later!
Purple
The __ phase of the integrative process occurs before schematic design begins.
Give this one a try later!
equipment such as server racks.
Give this one a try later!
Data Centers
An occupant who is in a building for 8 hours a day receives an FTE of __.
Give this one a try later!
1.0
In LEED v4, regional priorities were created using a(n) ___-based program.
,Give this one a try later!
geographic information systems
__ is all of the building water that is used for industrial purposes in building systems,
such as in boilers and cooling towers.
Give this one a try later!
Process water
What are three major concepts integral to both green buildings and sustainability that
are not a part of the conventional building process?
Give this one a try later!
Systems thinking, life-cycle thinking, and integrated process.
Scope 2 Energy
Give this one a try later!
Relates to purchased energy
The integration of sustainability into urban planning has given birth to the popular
term "__ city"
,Give this one a try later!
Sustainable
A building __ is the perimeter of a building as it meets the land on which it occupies.
Give this one a try later!
footprint
__ symptoms include headache; eye, nose, or throat irritation; dry cough; dry or itchy
skin; dizziness and nausea; and difficulty in concentrating.
Give this one a try later!
Sick building syndrome
The __ is the person (or entity) who is granted actual authority by the owner to register
the project and accept the certification agreeent.
Give this one a try later!
Agent
__ is caused by high-angled front lighting.
, Give this one a try later!
Glare
With a(n) __ loop, systems self-correct and stay within a particular set of parameters.
Give this one a try later!
negative
The __ category is meant for project teams who wish to se new credit ideas or exceed
existing credits.
Give this one a try later!
Innovation
Reclaimed water systems are identified by __ pipes and valve box covers.
Give this one a try later!
Purple
The __ phase of the integrative process occurs before schematic design begins.
Give this one a try later!