Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 39 pages
Exam (elaborations)

VA DEQ ESC INSPECTOR EXAM COMPLETE QUESTIONS WITH 100% CORRECT ANSWERS

Document preview thumbnail
Preview 4 out of 39 pages

VA DEQ ESC INSPECTOR EXAM COMPLETE QUESTIONS WITH 100% CORRECT ANSWERS

Content preview

VA DEQ ESC INSPECTOR EXAM
COMPLETE QUESTIONS WITH 100%
CORRECT ANSWERS




\.VESCP - ANSWERS-Virginia Erosion and Sediment Control Program


- Administered by counties/cities (must), towns (may)
- MUST BE APPROVED


\.Minimum Standard 1 - ANSWERS-Stabilization


permanent or temporary soil stabilization shall be applied to denuded areas
within seven days after final grade is reached on any portion of the site;
temporary soil stabilization shall be applied within seven days to denuded areas
that may not be at final grade but will remain dormant for longer than 14 days;
permanent stabilization shall be applied to areas that are to be left dormant for
more than one year


\.Site NOT at Final Grade - ANSWERS-- stabilize in 14 days
- temporarily seed
- mulch
- permanently stabilize if dormant > 1 year

,\.Site at Final Grade - ANSWERS-- stabilize in 7 days (recommended immediately)
- permanently or temporarily seed and mulch
- mulch/matting/straw


\.Minimum Standard 2 - ANSWERS-Stock Piles, Waste and Borrow Areas


during construction, soil stock piles and borrow areas shall be stabilized or
protected with sediment trapping measures


mulch prevents erosion by protecting the surface from raindrop impact and silt
fence intercepts and detains from disturbed areas


\.Minimum Standard 3 - ANSWERS-Permanent Vegetation


permanent vegetation cover shall be established on denuded areas not otherwise
permanently stabilized (permanent vegetation shall not be considered established
until a ground cover is achieved that is uniform, mature enough to survive, and
will inhibit erosion *there is no % associated with this*)


reduce erosion and decrease sediment yield from disturbed area


this is the standard used to verify that a site is ready for release of bonds or surety


\.Minimum Standard 4 - ANSWERS-First-Step Measures

,Sediment basins and traps, perimeter dikes, sediment barriers and other
measures intended to trap sediment shall be constructed as a first step in any
land-disturbing activity and shall be made functional before upslope land
disturbance takes place


a certain amount of initial land disturbance may be required to provide access for
equipment to install the perimeter controls, but site clearing and grading should
be kept to a minimum until the perimeter controls are in place


intercepts and detains small amounts of sediment from disturbed areas during
construction operation to prevent sediment from leaving the site and decrease
velocity of sheet flows and low-to-moderate level channel flow


\.Perimeter Controls - ANSWERS-assures that sediment does not leave the
perimeter of the land-disturbing area once site clearing, grading, and construction
commences


Examples: silt fences, sediment traps, sediment basins, construction entrance,
temporary diversions, diversions


\.Minimum Standard 5 - ANSWERS-Earthen Structure Stabilization


stabilization measures shall be applied to earthen structures such as dams, dikes,
and diversions immediately after installation

, reduce erosion and sedimentation and reduce damage from sediment and runoff
to downstream or off-site areas


\.Minimum Standard 6 - ANSWERS-Traps and Basins


sediment traps and basins shall be designed and constructed based upon the total
drainage area (not just disturbed area) to be served by the trap or basin


\.Sediment Traps - ANSWERS-minimum storage capacity shall be 134 cubic yards
per acre of drainage area and shall only control drainage areas less than 3 acres


*stone outlet = trap*


\.Sediment Basins - ANSWERS-surface runoff from disturbed areas that is
comprised of flow from drainage areas greater than or equal to 3 acres shall be
controlled by a basin; minimum storage capacity of a sediment basin shall be 134
cubic yards per acre of drainage area; the outfall system shall, at a minimum,
maintain the structural integrity of the basin during a 25-year storm of 24-hour
duration; runoff coefficients used in runoff calculations shall correspond to a bare
earth condition or those conditions expected to exist while the sediment basin is
utilized.


\.Sediment Trapping Devises - ANSWERS-1. place near the lowest drainage points
of a project


2. install as a first-step measure [MS-4]

Document information

Uploaded on
May 25, 2026
Number of pages
39
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
£11.40

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
IszackBd
5.0
(3)
Sold
49
Followers
3
Items
6052
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions