• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Start selling Create your account
Document preview thumbnail
Preview 2 out of 6 pages
Exam (elaborations)

Stormwater Exam Questions And Verified Answers

Document preview thumbnail
Preview 2 out of 6 pages

STORMWATER EXAM QUESTIONS AND VERIFIED ANSWERS

Content preview

STORMWATER EXAM QUESTIONS AND VERIFIED
ANSWERS


The following must be marked on Site Maps in job site trailer as work
progresses. - Answers - The dates when BMP changes or additions take
place

the best location for portable toilets on your construction site is... - Answers
- on level ground in low construction traffic areas

The SWPPP implementation sequence may be modified.... - Answers -
after consulting with the project SWPPP designer (CEC) and, if required,
the project owner and receiving written approval.

True or false: The superintendent is responsible for keeping current contact
list of all parties involved with the project. - Answers - True

Storm drain inlet PROTECTION is often intended to... - Answers - retain
large quantities of sediment.

why is vegetation an important method for controlling erosion? - Answers -
-to increase water infiltration
-roots reinforce soil
-dissipates rainfall energy

when installing and maintaining a check dam make sure... - Answers - the
low point (overflow) of the check dam is in the middle of the channel

which of the following is NOT a beneficial use of water? - Answers -
flushing a spill down a storm drain

of the following, which is a primary erosion control objective? - Answers -
minimize the extent and duration of soil exposure-stabilize disturbed areas
quickly.

, soil stockpiles and other disturbed areas must receive... - Answers -
temporary stabilization if they will remain inactive for more than 14 days
and potentially fewer days depending on the jurisdiction.

in addition to worker verification and badging, what other employment
incidents and/or regulatory contacts may happen? - Answers -
immigration,E-verify, wages, harassment, discrimination and, joint
employment.

a fiber roll or wattle is intended to... - Answers - capture sediment from
slope and slow runoff velocity

runoff controls include all but which one of the following.. - Answers - rolled
erosion control products

the notice of termination can be filed when - Answers - all construction
activity, inside and outside the building, is complete and permanent
stabilization has been verified as adequate to meet permit requirements.

a key first step before installing a rolled erosion control product or RECP is
- Answers - properly preparing the ground surface

proper spill management should include all of the following except -
Answers - installation of a spill pit on your construction site

true or false: contractor shall at all time keep just and true books, records
and accounts at its facility showing the actual cost and expenses that
contractor incurs in connection with the work, owner or its duly authorized
representative shall have the right, during term of this contract and for two
years after the earlier of the completion of the work or termination of this
contract, to enter onto contractors facility to examine and audit the books,
records and accounts that pertain to this contract. - Answers - true

sediment control devices must be installed.. - Answers - down slope of
construction areas prior to starting land distributing activities

the stormwater notice of intent (NOI) must be submitted... - Answers - after
the SWPPP is prepared and before starting construction

Document information

Uploaded on
May 3, 2026
Number of pages
6
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
£10.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA
3.8
(367)
Sold
2183
Followers
1449
Items
61355
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions