• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Start selling Create your account
Document preview thumbnail
Preview 2 out of 9 pages
Exam (elaborations)

Swppp Questions And Verified Answers

Document preview thumbnail
Preview 2 out of 9 pages

SWPPP QUESTIONS AND VERIFIED ANSWERS

Content preview

SWPPP QUESTIONS AND VERIFIED ANSWERS


Clean Water Act - Answers - Law set into place in 1970 for storm water regulation

NPDES - Answers - Regulations for monitoring storm water activity on a construction
site, are outlined in

Immediately after project is awarded and before you begin any site work - Answers -
When should you read and understand SWPP

Contaminated ground water - Answers - What is not an allowable storm water discharge
or non-storm water discharge

When jurisdiction of operations specifies you can start - Answers - When may
construction activity begin

303D list - Answers - Waters that fail anti-degradation list are placed on which list.

An officer and project owner - Answers - SWPPPs certification are signed by who

FALSE - Answers - The document that must be completed signed and submitted to the
state to obtain authorization to discharge is the NOT. (T/F)

All construction has been completed both inside and outside - Answers - NOT can be
filed when

is in charge of daily activities - Answers - Operations on a construction site are the entity
in charge of plans and specification and the entity who?

Stay out of trouble with the law - Answers - Motives for staying in compliance with storm
water objectives?

To protect and preserve beneficial use of U.S. waters, maintaining their clean, physical
and biological integrity - Answers - Objectives of the clean water act are

National Pollutant Discharge Elimination System - Answers - NPDES stands for

Site description and maps, inspection and maintenance procedure. Potential pollutant
sources, schedules of activities, site contact information, plan certification documents,
site contact info and descriptions of controls BMP - Answers - Which are a component
of a good SWPPP

False - Answers - Construction sediment is not considered a potential pollutant source
(T/F)

, Project owner, SWPPP designer - Answers - When modifying or substituting a storm
water BMP the contractor must consult with

False - Answers - NOI must be submitted to the appropriate agency before the storm
water pollution preventive plan is developed (T/F)

False, 303d List - Answers - Name of the list with impaired waters is called totally daily
maximum load (T/F)

It is required by law, it documents storm water management activity on your site, and it
demonstrates your intent to manage storm water on your site - Answers - You should
have a SWPPP for your construction site because?

Site specific - Answers - A well constructed SWPPP for your site should be?

Prior to commencing construction - Answers - The NOI must be submitted when?

Schedule of activities - Answers - One necessary component of a good SWPPP is?

Weather and Climate - Answers - Factors that may impact SWPPP scheduling activities
include

masonry materials, petroleum storage tanks, soil amendments fertilizer, lime etc -
Answers - Pollutant sources on a construction may include

Seek written approval of the project SWPPP designer or project owner - Answers - If
you believe BMP modification are necessary to the site you must?

Endangered species and historical preservation - Answers - The following consideration
may be incorporated into the SWPPP?

Site maps, erosion sediment control, BMPs, site specific sequences of construction
activities - Answers - The SWPPP will contain the following?

Identify deficient and failed BMPs and make repairs immediately - Answers - Once the
site has experienced rain event of measurable quantity you must?

Subcontractors web site - Answers - The subcontractor certification includes all of the
following but the following?

Storm Water BMPs and their locations - Answers - SWPPP site map includes the
following

Present and current - Answers - With the state general permit your primary
responsibility is to make sure the permit is?

Document information

Uploaded on
May 3, 2026
Number of pages
9
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
£11.27

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA
3.8
(367)
Sold
2183
Followers
1449
Items
61355
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions