Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 5 pages
Other

ACQ 1010 MODULE 3 STUDY GUIDE

Document preview thumbnail
Preview 2 out of 5 pages

ACQ 1010 MODULE 3 STUDY GUIDE

Content preview

ACQ 1010 MODULE 3 STUDY GUIDE


Major Capability Acquisition (MCA) Phases - Answers - Materiel Solutions Analysis
(MSA) > Technology Maturation and Risk Reduction (TMRR) > Engineering &
Manufacturing Development (EMD) > Production & Deployment (P&D) > Operations &
Support (O&S)

Major Capability Acquisition (MCA) Milestones - Answers - Milestone A (initiates TMRR)
> Milestone B (initiates EMD) > Milestone C (initiates P&D)

Major Capability Acquisition (MCA) Decision Points - Answers - Materiel Development
Decision (MDD) > Capability Development Document (CDD) Validation > Development
Request for Proposal (RFP) Decision > and Released Full-Rate Production "(FRP)

Materiel Solutions Analysis (MSA) - Answers - In this MCA phase the most promising
technology is picked to meet the user need identified in the Initial Capabilities
Document.

Technology Maturation and Risk Reduction (TMRR) - Answers - In this MCA phase we
reduce risk by proving the reliability of the technology through competitive prototyping.

Engineering and Manufacturing Development (EMD) - Answers - In this MCA phase we
complete the build to design, prove the design works and can be manufactured.

Production and Deployment (P&D) - Answers - In this MCA phase we produce a limited
number of units and test the units to make sure that they work and after that is we
produce and deploy the full set.

Operations and Support (O&S) - Answers - In this MCA phase we support operational
units for the full it's full life.

DoD Decision Support Systems - Answers - Defense Acquisition System, Joint
Capabilities Integration & Development System, Planning, Programming, Budgeting &
Execution System

MCA Purposes - Answers - Develop technology, produce weapon systems, and provide
logistics support.

DAS Governing Document - Answers - DODD 5000.01, DoDI 5000.02, DoDI 5000.85,
and Defense Acquisition Guidebook

Materiel Development Decision (MDD) - Answers - First decision point in the MCA
which determines whether a new weapon system is required to fill the identified gap.

, Also known as need identification decision this triggers the analysis of alternative
solutions.

MDA Determination of MDD - Answers - MDA must determine that a materiel solution is
necessary, approve AoA plan, designate the DoD Component that will lead the
program, and determine the acquisition phase of entry

MSA (Phases) - Answers - MDD > AOA > ICD > Draft CDD > Mile Stone A

Analysis of Alternatives (AoA) - Answers - Conducted during the MSA phase, this phase
focuses on identifying and analyzing alternatives, measures of effectiveness, key trades
between cost and capability, schedule, concept of operations, overall risk, and total life-
cycle cost, including sustainment and provides the basis for the Acquisition Strategy
(AS).

Critical Technology Elements (CTEs) - Answers - Technology maturity, integration risk,
manufacturing feasability, and technology maturation and demonstration needs

MSA (Conclusion) - Answers - When the AoA has been completed, draft CDD
produced, and criteria met for Milestone A have been met, this phase has completed.

Milestone A - Answers - Also referred to as the Risk Reduction Decision, is an
investment decision to pursue specific product or design concepts, and to commit the
resources required to mature technology and/or reduce any risks that must be mitigated
prior to committing the resources needed for development, production, and fielding. A
successful Milestone A decision leads to entry into the TMRR phase.

MDA Determination of Milestone A - Answers - MDA must approve Proposed materiel
solution, Acquisition Strategy, Systems Engineering Plan (SEP), Test and Evaluation
Master Plan (TEMP), and Product Support Strategy (PSS), Lead Component must
submit a cost estimate for proposed solution, must have full funding for Future Years
Defense Program.

TMRR (purpose) - Answers - Reduce technology risk by demonstrating critical
technologies in competitive prototyping activities, determine and mature the appropriate
set of technologies, reduce all sources of risk through risk mitigation, develop and
approve the CDD at the CDD-Validation, conduct a prelimary design review (PDR), and
release the development request for proposal

Reliability, Availability and Maintainability (RAM) - Answers - This report in the TMRR
phase provides early (Pre-Milestone A) reliability, availability, maintainability and
ownership cost feasibility assessments of alternative concepts, includes early
formulation of maintenance and support concepts, provides an audit trail that
documents and supports JCIDS thresholds, ensures correct balance between the
sustainment metrics, provides early risk reductions, and informs the Preliminary Design
Review

Document information

Uploaded on
April 30, 2026
Number of pages
5
Written in
2025/2026
Type
Other
Person
Unknown
£9.81

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA
3.8
(362)
Sold
2141
Followers
1447
Items
58939
Last sold
22 hours ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions