Created By: A Solution
Solutions Manual for Electrical Wiring Commercial
18th Edition by Phil Simmons A+|NEW
VERSION|2026/2027
Solution and Answer Guide
SIMMONS/ODE, ELECTRICAL WIRING COMMERCIAL, 18E © 2024, 9780357767115;
CHAPTER 1:COMMERCIAL BUILDING PLANS AND SPECIFICATIONS
TABLE OF CONTENTS
Review .......................................................................................................................................................... 1
Note to instructor: It is recommended that students be required to respond, where
appropriate, with answers that are complete sentences.
REVIEW
Refer to the National Electrical Code or the working drawings when necessary. Where
applicable, responses should be written in complete sentences.
1. What section of a commercial building’s specification contains a list of contract
documents?
Answer: A list of the contract documents is contained in General Clauses and Conditions. A
listing of the Commercial Building contract documents is presented in this chapter under the
heading “Commercial Building Plans.” The instructor may wish to have the students check over
this listing and compare it with the plans provided.
2. The requirement for temporary light and power at the job site will be found in what
portion of a commercial building’s specification?
Answer: The Supplementary General Conditions specifies the job site requirements for
temporary light and power. In some contracts, this electrical system becomes the responsibility
of the general contractor; in other contracts, it is the electrical contractor’s responsibility to
install and maintain the temporary electrical system. The instructor may wish to refer the student
A+ Page 1
,Created By: A Solution
to NEC Article 590 and discuss the requirements in detail.
ph ph ph ph ph ph ph ph ph
A+ Page 2
,Created By: A Solution
3. The electrician uses the Schedule of Working Drawings for what purpose?
ph ph ph ph ph ph ph ph ph ph
Answer: The electrician uses the Schedule of Working Drawings to determine whether all
ph ph ph ph ph ph ph ph ph ph ph ph
of the drawings are at hand. The information on “the other sheets” may be very important,
ph ph ph ph ph ph ph ph ph ph ph ph ph ph ph ph
especially in coordinating with other contractors.
ph ph ph ph ph ph
4. Complete the following items by indicating the letter(s) designating the correct
ph ph ph ph ph ph ph ph ph ph
source(s) of information:
ph ph ph
No. Answer Item Information
4. Sections Ceiling height ph Sections, Sheet A6 ph ph
5. Electrical Electrical receptacle ph Electrical symbol schedule, Chapter
ph ph ph
ph symbol ph style ph 2,Figure 2–6 ph
ph schedule
6. Electrical Electrical outlet ph Electrical layout drawings, Sheets
ph ph ph
ph layout ph location ph El,E2, and E3 ph ph
ph drawing
s
7. Elevations Exterior wall finishes ph ph Elevations, Sheets A4 and A5 ph ph ph ph
8. Site plan ph Grading elevations ph Site plan, Sheet A4
ph ph ph
9. Electrical Panelboard schedules ph Electrical layout drawings, Sheet
ph ph ph
E4
ph
ph layout
ph drawing
s
10. Architectural Room width ph Architectural floor plan, Sheets Al, ph ph ph ph
ph floor plan ph ph A2,and A3 ph
11. Architectural Swing of door ph ph Architectural floor plan, Sheets Al, ph ph ph ph
ph floor plan ph ph A2,and A3 ph
12. Sections View of interior wallph ph ph Sections, Sheet A6 ph ph
A+ Page 3
, Created By: A Solution
Match the items on the left with those on the right by writing the letter
ph ph ph ph ph ph ph ph ph ph ph ph ph ph
p h designation ofthe appropriate organization from the list on the right.
ph ph ph ph ph ph ph ph ph
13. NEC Electrical Code ph National Electrical Code ph ph
(NEC)
ph
14. IAEI Electrical inspectors ph
International Association of ph ph
ph ElectricalInspectors
ph (IAEI)
15. NFPA Fire codesph National Fire Protection Association
ph ph ph
ph (NFPA)
16. IESNA Lighting information ph Illuminating Engineering ph
ph Society ofNorth
ph
America (IESNA)
ph ph
17. UL Listing service ph Underwriters Laboratories, Inc. ph ph
ph (UL)
18. NEMA Manufacturers’ National Electrical ph
standards
ph ph ManufacturersAssociation
ph (NEMA)
19. PE Seal Professional Engineer (PE) ph ph
Match the items on the left with those on the right by writing the
ph ph ph ph ph ph ph ph ph ph ph ph ph
ph letter designation ofthe proper level of NEC interpretation from the
ph ph ph ph ph ph ph ph ph
ph list on the right.
ph ph ph
20. with Allowed by the Code ph ph ph Shall be permitted, or Shall
ph ph ph ph
special
ph ph not berequired, NEC
ph ph
ph permissio
n
A+ Page 4
Solutions Manual for Electrical Wiring Commercial
18th Edition by Phil Simmons A+|NEW
VERSION|2026/2027
Solution and Answer Guide
SIMMONS/ODE, ELECTRICAL WIRING COMMERCIAL, 18E © 2024, 9780357767115;
CHAPTER 1:COMMERCIAL BUILDING PLANS AND SPECIFICATIONS
TABLE OF CONTENTS
Review .......................................................................................................................................................... 1
Note to instructor: It is recommended that students be required to respond, where
appropriate, with answers that are complete sentences.
REVIEW
Refer to the National Electrical Code or the working drawings when necessary. Where
applicable, responses should be written in complete sentences.
1. What section of a commercial building’s specification contains a list of contract
documents?
Answer: A list of the contract documents is contained in General Clauses and Conditions. A
listing of the Commercial Building contract documents is presented in this chapter under the
heading “Commercial Building Plans.” The instructor may wish to have the students check over
this listing and compare it with the plans provided.
2. The requirement for temporary light and power at the job site will be found in what
portion of a commercial building’s specification?
Answer: The Supplementary General Conditions specifies the job site requirements for
temporary light and power. In some contracts, this electrical system becomes the responsibility
of the general contractor; in other contracts, it is the electrical contractor’s responsibility to
install and maintain the temporary electrical system. The instructor may wish to refer the student
A+ Page 1
,Created By: A Solution
to NEC Article 590 and discuss the requirements in detail.
ph ph ph ph ph ph ph ph ph
A+ Page 2
,Created By: A Solution
3. The electrician uses the Schedule of Working Drawings for what purpose?
ph ph ph ph ph ph ph ph ph ph
Answer: The electrician uses the Schedule of Working Drawings to determine whether all
ph ph ph ph ph ph ph ph ph ph ph ph
of the drawings are at hand. The information on “the other sheets” may be very important,
ph ph ph ph ph ph ph ph ph ph ph ph ph ph ph ph
especially in coordinating with other contractors.
ph ph ph ph ph ph
4. Complete the following items by indicating the letter(s) designating the correct
ph ph ph ph ph ph ph ph ph ph
source(s) of information:
ph ph ph
No. Answer Item Information
4. Sections Ceiling height ph Sections, Sheet A6 ph ph
5. Electrical Electrical receptacle ph Electrical symbol schedule, Chapter
ph ph ph
ph symbol ph style ph 2,Figure 2–6 ph
ph schedule
6. Electrical Electrical outlet ph Electrical layout drawings, Sheets
ph ph ph
ph layout ph location ph El,E2, and E3 ph ph
ph drawing
s
7. Elevations Exterior wall finishes ph ph Elevations, Sheets A4 and A5 ph ph ph ph
8. Site plan ph Grading elevations ph Site plan, Sheet A4
ph ph ph
9. Electrical Panelboard schedules ph Electrical layout drawings, Sheet
ph ph ph
E4
ph
ph layout
ph drawing
s
10. Architectural Room width ph Architectural floor plan, Sheets Al, ph ph ph ph
ph floor plan ph ph A2,and A3 ph
11. Architectural Swing of door ph ph Architectural floor plan, Sheets Al, ph ph ph ph
ph floor plan ph ph A2,and A3 ph
12. Sections View of interior wallph ph ph Sections, Sheet A6 ph ph
A+ Page 3
, Created By: A Solution
Match the items on the left with those on the right by writing the letter
ph ph ph ph ph ph ph ph ph ph ph ph ph ph
p h designation ofthe appropriate organization from the list on the right.
ph ph ph ph ph ph ph ph ph
13. NEC Electrical Code ph National Electrical Code ph ph
(NEC)
ph
14. IAEI Electrical inspectors ph
International Association of ph ph
ph ElectricalInspectors
ph (IAEI)
15. NFPA Fire codesph National Fire Protection Association
ph ph ph
ph (NFPA)
16. IESNA Lighting information ph Illuminating Engineering ph
ph Society ofNorth
ph
America (IESNA)
ph ph
17. UL Listing service ph Underwriters Laboratories, Inc. ph ph
ph (UL)
18. NEMA Manufacturers’ National Electrical ph
standards
ph ph ManufacturersAssociation
ph (NEMA)
19. PE Seal Professional Engineer (PE) ph ph
Match the items on the left with those on the right by writing the
ph ph ph ph ph ph ph ph ph ph ph ph ph
ph letter designation ofthe proper level of NEC interpretation from the
ph ph ph ph ph ph ph ph ph
ph list on the right.
ph ph ph
20. with Allowed by the Code ph ph ph Shall be permitted, or Shall
ph ph ph ph
special
ph ph not berequired, NEC
ph ph
ph permissio
n
A+ Page 4